Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu as follows:
- Has relationships with 1 project owners.
- Has relationships with 52 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 31 contractor selection plans with a total of 76 bidding packages, of which 30 prequalification documents have not found the investment project.
- Has invited bids for 34 packages (with 37 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 35 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 17 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 36 packages that have not fully posted the contractor selection results. Of these 32 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.18 contractors.
- Breakdown by bidding field: Goods 94.59%, Construction 0%, Consultancy 5.41%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,251,466,545 VND, of which the total winning bid value is: 4,208,796,160 VND.
- The savings rate is: 19.85%.
Data analysis results of DauThau.info software for bid solicitors Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu as follows:
- Has relationships with 52 contractor.
- The average number of contractors participating in each bidding package is: 2.18 contractors.
- Proportion of bidding fields: Goods 94.59%, Construction 0%, Consulting 5.41%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,251,466,545 VND, in which the total winning value is: 4,208,796,160 VND.
- The savings rate is: 19.85%.
This Bid solicitor is also an investor. The analysis results of data for the investor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 31 contractor selection plans, of which 29 were self-published, and 2 were published by other entities.
- Is the investor of 32 Tender Notices, of which 25 were self-invited, and 7 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG TÍN LỘC
16/09/2025 10:28
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Shopping for rangers in 2025 .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI VÀ XÂY DỰNG NHẬT NAM
15/09/2025 09:03
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes the plan Plan for selecting contractors to procure forest ranger costumes in 2025 with 1 bidding package .
14/09/2025 10:30
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Construction supervision consultancy .
- Winning bidder: NGO GIA NTH COMPANY LIMITED
14/09/2025 10:12
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG NHÂN HÒA
14/09/2025 10:08
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package TV prepares required documents (construction package) .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG HƯNG
18/08/2025 14:44
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes the plan Plan for selecting contractors for repair of Long Son Mangrove Forest Forest Forest Forest Station of Vung Tau Forest Protection Department - Phu My with 5 bidding package .
14/08/2025 08:59
The Bid solicitor PHU GIA HUNG SERVICES TRADING CONSTRUCTION INVESTMENT COMPANY LIMITED has posted the results of the bidding package Investigation determined the status of the forest of Ba Ria - Vung Tau province in the period of 2024-2025 of the investor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu.
- Winning bidder: Thuan Hoa agricultural forestry design consultant company limited
11/08/2025 16:28
The Bid solicitor TRAN ANH GENERAL ENGINEERING AND CONSULTANCY LIMITED COMPANY has posted the results of the bidding package Adjust, compile and print leaflets in 2025, forest protection and fire protection manuals of the investor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN IN ẤN VÀ QUẢNG CÁO NGỌC HIẾU
24/06/2025 10:58
The Bid solicitor TRAN ANH GENERAL ENGINEERING AND CONSULTANCY LIMITED COMPANY has posted the results of the bidding package Repair and refresh the forecast of fire -level, propaganda panels, forest protection conventions of the investor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN QUẢNG CÁO HOÀN MỸ
16/06/2025 12:01
The data sheet has been partially hidden, to see the full information please Login or Register
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes the plan The investigation plan determines the current status of the forest of Ba Ria-Vung Tau province in the period of 2024-2025 with 2 bidding package .
07/05/2025 08:47
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Equipped with a hammock (waterproof, insect) and a flashlight for the rangers in the area .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ CÔNG NGHỆ MÁY TÍNH VIETTECH
29/04/2025 10:42
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes the plan Approving the plan to select the Forest Protection Contractor in 2025 with 2 bidding package .
08/04/2025 14:33
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Maintenance and servicing of pickup trucks .
- Winning bidder: GARAGE ĐỒNG NGHIỆP
20/02/2025 14:34
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes the plan Plan for selecting contractors to provide goods and services to implement the plan for forest fire prevention and fighting in the dry season 2024-2025 in Ba Ria - Vung Tau province with 3 bidding package .
23/01/2025 14:08
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Maintain, service, repair and replace damaged equipment .
- Winning bidder: CÔNG TY TNHH MÁY TÍNH VÀ TRUYỀN THÔNG ĐAN VIỆT
12/11/2024 09:44
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Expenses for maintenance and repair of machinery and equipment are provided .
- Winning bidder: NGUYỄN THỊ KIM LOAN
11/11/2024 10:44
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Buy Future Motorcycle to patrol fire watch .
- Winning bidder: CÔNG TY TNHH TM DV VĂN HẢI
11/11/2024 10:14
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bidding package Maintain, service, repair and replace damaged equipment with 1 participating contractors .
30/10/2024 15:03
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes Tender Notice Maintain, service, repair and replace damaged equipment in the form Competitive Offer .
23/10/2024 14:44
The data sheet has been partially hidden, to see the full information please Login or Register
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG TÍN LỘC
16/09/2025 10:28
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Shopping for rangers in 2025 .
- Winning bidder: CÔNG TY TNHH SẢN XUẤT THƯƠNG MẠI VÀ XÂY DỰNG NHẬT NAM
15/09/2025 09:03
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes the plan Plan for selecting contractors to procure forest ranger costumes in 2025 with 1 bidding package .
14/09/2025 10:30
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Construction supervision consultancy .
- Winning bidder: NGO GIA NTH COMPANY LIMITED
14/09/2025 10:12
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ ĐẦU TƯ XÂY DỰNG NHÂN HÒA
14/09/2025 10:08
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu announced the results of the bid package TV prepares required documents (construction package) .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG HƯNG
18/08/2025 14:44
Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu publishes the plan Plan for selecting contractors for repair of Long Son Mangrove Forest Forest Forest Forest Station of Vung Tau Forest Protection Department - Phu My with 5 bidding package .
14/08/2025 08:59
The Bid solicitor PHU GIA HUNG SERVICES TRADING CONSTRUCTION INVESTMENT COMPANY LIMITED has posted the results of the bidding package Investigation determined the status of the forest of Ba Ria - Vung Tau province in the period of 2024-2025 of the investor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu.
- Winning bidder: Thuan Hoa agricultural forestry design consultant company limited
11/08/2025 16:28
The Bid solicitor TRAN ANH GENERAL ENGINEERING AND CONSULTANCY LIMITED COMPANY has posted the results of the bidding package Adjust, compile and print leaflets in 2025, forest protection and fire protection manuals of the investor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN IN ẤN VÀ QUẢNG CÁO NGỌC HIẾU
24/06/2025 10:58
The Bid solicitor TRAN ANH GENERAL ENGINEERING AND CONSULTANCY LIMITED COMPANY has posted the results of the bidding package Repair and refresh the forecast of fire -level, propaganda panels, forest protection conventions of the investor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu.
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN QUẢNG CÁO HOÀN MỸ
16/06/2025 12:01
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu has posted 31 of the contractor selection plan, which contains 76 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu has posted 37 Tender Notices in 34 bidding packages. Among these, 20 Tender Notices were self-invited, and 17 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu has posted 35 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 35 package, canceled the bid 0 package (among the bidding packages above).
- There are 17 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu has a relationship with 52 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Chi cục Kiểm lâm tỉnh Bà Rịa - Vũng Tàu has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects