Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Chi cục Kiểm lâm tỉnh Thái Nguyên as follows:
- Has relationships with 1 project owners.
- Has relationships with 75 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 42 contractor selection plans with a total of 83 bidding packages, of which 33 prequalification documents have not found the investment project.
- Has invited bids for 30 packages (with 35 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 88 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 57 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.90 contractors.
- Breakdown by bidding field: Goods 51.43%, Construction 22.86%, Consultancy 25.71%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 46,093,509,428 VND, of which the total winning bid value is: 45,058,653,079 VND.
- The savings rate is: 2.25%.
Data analysis results of DauThau.info software for bid solicitors Chi cục Kiểm lâm tỉnh Thái Nguyên as follows:
- Has relationships with 75 contractor.
- The average number of contractors participating in each bidding package is: 1.90 contractors.
- Proportion of bidding fields: Goods 51.43%, Construction 22.86%, Consulting 25.71%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 46,093,509,428 VND, in which the total winning value is: 45,058,653,079 VND.
- The savings rate is: 2.25%.
This Bid solicitor is also an investor. The analysis results of data for the investor Chi cục Kiểm lâm tỉnh Thái Nguyên are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 33 contractor selection plans, of which 32 were self-published, and 1 were published by other entities.
- Is the investor of 39 Tender Notices, of which 35 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Shopping
uniform and
Accessories
accompanying
uniform
forest ranger
and force
specialized
Forest protection
2025 .
- Winning bidder: X19 GARMENT JOINT STOCK COMPANY
09/09/2025 09:51
The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has posted the results of the bidding package Construction supervision consultancy of the investor Chi cục Kiểm lâm tỉnh Thái Nguyên.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHÁT TRIỂN NÔNG NGHIỆP THÁI NGUYÊN
13/08/2025 18:07
The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has posted the results of the bidding package Project management costs of the investor Chi cục Kiểm lâm tỉnh Thái Nguyên.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG HƯNG BÌNH
13/08/2025 18:02
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Construction in Dai Tu district:
- The cost of construction of forestry roads in Dai district has since 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; Receive tax. .
- Winning bidder: CÔNG TY TNHH PHÚ THỊNH PL
13/08/2025 17:45
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Construction in Phu Luong district:
- The cost of construction of forestry road works in Phu Luong district in 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; resource tax .
- Winning bidder: CÔNG TY TNHH MAI NGỌC THÁI NGUYÊN
04/08/2025 16:20
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Shopping
uniform and
Accessories
accompanying
uniform
forest ranger
and force
specialized
Forest protection
2025 in the form Competitive Offer .
01/08/2025 14:53
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes the plan Shopping for uniforms and accessories with the ranger uniforms and forest protection forces in 2025 with 1 bidding package .
24/07/2025 16:23
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Construction in Dai Tu district:
- The cost of construction of forestry roads in Dai district has since 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; Receive tax. in the form Open bidding .
24/07/2025 10:55
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Construction in Phu Luong district:
- The cost of construction of forestry road works in Phu Luong district in 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; resource tax in the form Open bidding .
13/07/2025 10:43
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Construction in Dai Tu district:
- The cost of construction of forestry roads in Dai district has since 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; Receive tax. in the form Open bidding .
13/07/2025 10:13
The data sheet has been partially hidden, to see the full information please Login or Register
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHÁT TRIỂN NÔNG NGHIỆP THÁI NGUYÊN
13/08/2025 18:07
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Project management costs .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG HƯNG BÌNH
13/08/2025 18:02
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Consulting appraisal of bidding documents, required documents; Evaluation of contractor selection results .
- Winning bidder: Công ty TNHH tư vấn và xây dựng KT Thái Nguyên
09/07/2025 16:32
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Consultancy on preparation of bidding documents, evaluation of construction bids .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG KIÊN KHÁNH
09/07/2025 16:27
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes the plan The plan to select contractors of forestry roads in Phu Luong and Dai districts from 2025 is under the Project of Protection and Development of Production and Protection Forests, Special use and improving the capacity of forest fire prevention and fighting in Thai Nguyen province, phase 2021-2025 with 7 bidding package .
08/07/2025 15:59
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Buy seedlings for replacement forests in Dinh Hoa and Vo Nhai districts .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN GIANG HẢI YÊN BÁI
02/07/2025 16:09
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Buy NPK fertilizer for replacement forests (first year) in Dinh Hoa and Vo Nhai districts .
- Winning bidder: CÔNG TY CỔ PHẦN HOÀNG ANH AGRITECH
17/06/2025 14:35
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bidding package Buy seedlings for replacement forests in Dinh Hoa and Vo Nhai districts with 3 participating contractors .
16/06/2025 10:11
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Buy seedlings for replacement forests in Dinh Hoa and Vo Nhai districts in the form Open bidding .
07/06/2025 10:51
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes the plan Buy seedlings for replacement forests in Dinh Hoa and Vo Nhai districts with 1 bidding package .
07/06/2025 08:51
The data sheet has been partially hidden, to see the full information please Login or Register
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Shopping
uniform and
Accessories
accompanying
uniform
forest ranger
and force
specialized
Forest protection
2025 .
- Winning bidder: X19 GARMENT JOINT STOCK COMPANY
09/09/2025 09:51
The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has posted the results of the bidding package Construction supervision consultancy of the investor Chi cục Kiểm lâm tỉnh Thái Nguyên.
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG PHÁT TRIỂN NÔNG NGHIỆP THÁI NGUYÊN
13/08/2025 18:07
The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has posted the results of the bidding package Project management costs of the investor Chi cục Kiểm lâm tỉnh Thái Nguyên.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ XÂY DỰNG HƯNG BÌNH
13/08/2025 18:02
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Construction in Dai Tu district:
- The cost of construction of forestry roads in Dai district has since 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; Receive tax. .
- Winning bidder: CÔNG TY TNHH PHÚ THỊNH PL
13/08/2025 17:45
Chi cục Kiểm lâm tỉnh Thái Nguyên announced the results of the bid package Construction in Phu Luong district:
- The cost of construction of forestry road works in Phu Luong district in 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; resource tax .
- Winning bidder: CÔNG TY TNHH MAI NGỌC THÁI NGUYÊN
04/08/2025 16:20
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Shopping
uniform and
Accessories
accompanying
uniform
forest ranger
and force
specialized
Forest protection
2025 in the form Competitive Offer .
01/08/2025 14:53
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes the plan Shopping for uniforms and accessories with the ranger uniforms and forest protection forces in 2025 with 1 bidding package .
24/07/2025 16:23
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Construction in Dai Tu district:
- The cost of construction of forestry roads in Dai district has since 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; Receive tax. in the form Open bidding .
24/07/2025 10:55
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Construction in Phu Luong district:
- The cost of construction of forestry road works in Phu Luong district in 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; resource tax in the form Open bidding .
13/07/2025 10:43
Chi cục Kiểm lâm tỉnh Thái Nguyên publishes Tender Notice Construction in Dai Tu district:
- The cost of construction of forestry roads in Dai district has since 2025.
- Environmental protection expenses, granting exploitation rights for excavated and embankment; Receive tax. in the form Open bidding .
13/07/2025 10:13
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Chi cục Kiểm lâm tỉnh Thái Nguyên has posted 42 of the contractor selection plan, which contains 83 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has posted 35 Tender Notices in 30 bidding packages. Among these, 35 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has posted 88 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 88 package, canceled the bid 0 package (among the bidding packages above).
- There are 57 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has a relationship with 75 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Chi cục Kiểm lâm tỉnh Thái Nguyên has a relationship with 32 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Chi cục Kiểm lâm tỉnh Thái Nguyên has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects