Data analysis results of DauThau.info software for bid solicitors Chi cục Thủy lợi as follows:
- Has relationships with 175 contractor.
- Announced 60 investment development project, of which 13 projects have not yet announced the prequalification documents.
- Announced 78 contractor selection plans with a total of 151 bidding packages, of which 65 prequalification documents have not found the investment project.
- Has invited bids for 36 packages (with 37 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 326 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 307 packages with results that do not have tender notice or prequalification notice.
- There are 41 packages that have not fully posted the contractor selection results. Of these 39 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.38 contractors.
- Breakdown by bidding field: Goods 35.14%, Construction 59.46%, Consultancy 5.41%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 258,376,821,319 VND, of which the total winning bid value is: 252,754,536,842 VND.
- The savings rate is: 2.18%.
Data analysis results of DauThau.info software for bid solicitors Chi cục Thủy lợi as follows:
- Has relationships with 175 contractor.
- The average number of contractors participating in each bidding package is: 1.38 contractors.
- Proportion of bidding fields: Goods 35.14%, Construction 59.46%, Consulting 5.41%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 258,376,821,319 VND, in which the total winning value is: 252,754,536,842 VND.
- The savings rate is: 2.18%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 60 investment and development projects.
- As the owner of 146 Contractor selection plan in which 65 Contractor selection plan is self-published, and 81 Contractor selection plan is posted by other units.
- Being the investor of 77 bidding packages in which 11 packages are self-invited, and 66 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Chi cục Thủy lợi has posted the request Project on development of small and in-field irrigation, sample design, typical design of small and in-field irrigation works in the city of the investor Chi cục Thủy lợi with 3 bidding package.
02/12/2022 14:10
The Bid solicitor Chi cục Thủy lợi has posted the request Irrigation development plan for agricultural production in Ho Chi Minh City until 2030, vision to 2045 of the investor Chi cục Thủy lợi with 4 bidding package.
29/11/2022 08:54
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Audit consulting of the investor Chi cục Thủy lợi.
28/11/2022 08:22
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Audit consulting of the investor Chi cục Thủy lợi.
- Winning bidder: Công ty TNHH Kiểm toán Việt Úc
28/11/2022 08:16
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Audit consulting of the investor Chi cục Thủy lợi.
- Winning bidder: Công ty TNHH Kiểm toán Việt Úc
24/11/2022 15:22
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction of the investor Chi cục Thủy lợi.
- Winning bidder: CÔNG TY CỔ PHẦN KHẢO SÁT THIẾT KẾ VÀ XÂY DỰNG THỊNH HOÀNG PHÁT
13/10/2022 15:39
Chi cục Thủy lợi Posted Development Investment Project Project to urgently overcome the landslide situation on the north bank of Dinh River, section Lam Cam - Cau Mong in Bao An Ward, Phan Rang - Thap Cham city, Ninh Thuan province.
07/10/2022 07:00
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction insurance of the investor Chi cục Thủy lợi.
03/10/2022 10:50
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction insurance of the investor Chi cục Thủy lợi.
03/10/2022 10:41
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction insurance of the investor Chi cục Thủy lợi.
- Winning bidder: Tổng công ty Cổ phần Bảo hiểm Sài Gòn Hà Nội - Công ty Bảo hiểm BSH Đông Sài Gòn
03/10/2022 10:21
The data sheet has been partially hidden, to see the full information please Login or Register
Chi cục Thủy lợi publishes the plan Project on development of small and in-field irrigation, sample design, typical design of small and in-field irrigation works in the city with 3 bidding package .
02/12/2022 14:10
Chi cục Thủy lợi publishes the plan Irrigation development plan for agricultural production in Ho Chi Minh City until 2030, vision to 2045 with 4 bidding package .
29/11/2022 08:54
Chi cục Thủy lợi announced the results of the bid package Audit consulting .
- Winning bidder: Công ty TNHH Kiểm toán Việt Úc
28/11/2022 08:22
Chi cục Thủy lợi announced the results of the bid package Audit consulting .
- Winning bidder: Công ty TNHH Kiểm toán Việt Úc
28/11/2022 08:16
Chi cục Thủy lợi announced the results of the bid package Audit consulting .
- Winning bidder: Công ty TNHH Kiểm toán Việt Úc
24/11/2022 15:22
Chi cục Thủy lợi announced the results of the bid package Construction .
- Winning bidder: CÔNG TY CỔ PHẦN KHẢO SÁT THIẾT KẾ VÀ XÂY DỰNG THỊNH HOÀNG PHÁT
13/10/2022 15:39
Chi cục Thủy lợi announced the results of the bidding package Construction, repair and completion of Duc Giang embankment, Yen Dung district, section from K7+170 to K7+400 Thuong Ba Tong right dyke with 1 participating contractors .
10/10/2022 07:54
Chi cục Thủy lợi announced the results of the bidding package Package 02: The entire construction and installation part of the work with 1 participating contractors .
06/10/2022 15:02
Chi cục Thủy lợi announced the results of the bid package Construction insurance .
- Winning bidder: Tổng công Ty Cổ phần Bảo hiểm Sài Gòn Hà Nội - Công ty Bảo hiểm BSH Đông Sài Gòn
03/10/2022 10:50
Chi cục Thủy lợi announced the results of the bid package Construction insurance .
- Winning bidder: Tổng công ty Cổ phần Bảo hiểm Sài Gòn Hà Nội - Công ty Bảo hiểm BSH Đông Sài Gòn
03/10/2022 10:41
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Chi cục Thủy lợi has posted the request Project on development of small and in-field irrigation, sample design, typical design of small and in-field irrigation works in the city of the investor Chi cục Thủy lợi with 3 bidding package.
02/12/2022 14:10
The Bid solicitor Chi cục Thủy lợi has posted the request Irrigation development plan for agricultural production in Ho Chi Minh City until 2030, vision to 2045 of the investor Chi cục Thủy lợi with 4 bidding package.
29/11/2022 08:54
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Audit consulting of the investor Chi cục Thủy lợi.
28/11/2022 08:22
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Audit consulting of the investor Chi cục Thủy lợi.
- Winning bidder: Công ty TNHH Kiểm toán Việt Úc
28/11/2022 08:16
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Audit consulting of the investor Chi cục Thủy lợi.
- Winning bidder: Công ty TNHH Kiểm toán Việt Úc
24/11/2022 15:22
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction of the investor Chi cục Thủy lợi.
- Winning bidder: CÔNG TY CỔ PHẦN KHẢO SÁT THIẾT KẾ VÀ XÂY DỰNG THỊNH HOÀNG PHÁT
13/10/2022 15:39
Chi cục Thủy lợi Posted Development Investment Project Project to urgently overcome the landslide situation on the north bank of Dinh River, section Lam Cam - Cau Mong in Bao An Ward, Phan Rang - Thap Cham city, Ninh Thuan province.
07/10/2022 07:00
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction insurance of the investor Chi cục Thủy lợi.
03/10/2022 10:50
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction insurance of the investor Chi cục Thủy lợi.
03/10/2022 10:41
The Bid solicitor Chi cục Thủy lợi has posted the results of the bidding package Construction insurance of the investor Chi cục Thủy lợi.
- Winning bidder: Tổng công ty Cổ phần Bảo hiểm Sài Gòn Hà Nội - Công ty Bảo hiểm BSH Đông Sài Gòn
03/10/2022 10:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Chi cục Thủy lợi has posted 78 of the contractor selection plan, which contains 151 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Chi cục Thủy lợi has posted 37 Tender Notice in the 36 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Chi cục Thủy lợi has posted 326 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 326 package, canceled the bid 0 package (among the bidding packages above).
- There are 307 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Chi cục Thủy lợi has a relationship with 175 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Chi cục Thủy lợi has a relationship with 15 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Chi cục Thủy lợi is the investor of 77 package, of which 11 package is self-invited, other units invite bid 66 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Chi cục Thủy lợi is the owner of 146 contractor selection plan. In which, they self-invite 65 of contractor selection plan, other units invite bids of 81 of contractor selection plan.
Summary: Investor Chi cục Thủy lợi is an investor with 213 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Chi cục Thủy lợi is the investor of 60 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register