Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors PC3 - INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 109 contractor.
- Announced 6 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 46 contractor selection plans with a total of 48 bidding packages, of which 40 prequalification documents have not found the investment project.
- Has invited bids for 44 packages (with 49 tender notices), and conducted prequalification for 0 packages.
- There are 5 bidding packages with content that needs clarification.
- Announced the results of 54 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.07 contractors.
- Breakdown by bidding field: Goods 46.94%, Construction 24.49%, Consultancy 18.37%, Non-consultancy 10.20%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 95,540,500,468 VND, of which the total winning bid value is: 87,100,910,747 VND.
- The savings rate is: 8.83%.
Data analysis results of DauThau.info software for bid solicitors PC3 - INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 109 contractor.
- The average number of contractors participating in each bidding package is: 3.07 contractors.
- Proportion of bidding fields: Goods 46.94%, Construction 24.49%, Consulting 18.37%, Non-consulting 10.20%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 95,540,500,468 VND, in which the total winning value is: 87,100,910,747 VND.
- The savings rate is: 8.83%.
This Bid solicitor is also an investor. The analysis results of data for the investor PC3 - INVESTMENT JOINT STOCK COMPANY are as follows:
- Is the investor of 6 development investment projects.
- Is the investor of 43 contractor selection plans, of which 33 were self-published, and 10 were published by other entities.
- Is the investor of 55 Tender Notices, of which 49 were self-invited, and 6 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 01 - SCL: Overhaul of working wheel of unit H1 - Dak Pone Hydropower Plant - Procurement estimate: Technical plan - SCL project estimate Item: Overhaul of working wheel of unit H1 - Dak Pone Hydropower Plant with 1 bidding package .
30/12/2025 16:25
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 01: Consulting on adjusting the operating process of Da Krong 1 hydroelectric reservoir with 1 bidding package .
23/12/2025 08:38
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 01: Consulting on adjusting the operating process of Da Krong 1 hydroelectric reservoir with 1 bidding package .
23/12/2025 08:35
The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 10: Procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant of the investor PC3 - INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: TDVN TRADING AND TECHNICAL SERVICES CO.,LTD
27/10/2025 16:02
PC3 - INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Tender package No 10: Procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant in the form Simplified Online Bidding .
13/10/2025 09:37
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 10: Procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant - Procurement estimate: Cost of procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant with 1 bidding package .
09/10/2025 16:07
The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Bidding package 09: VTTB shopping for operation and maintenance at Dak Pone Population of the investor PC3 - INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: EMC THANH TAM COMPANY LIMITED
07/10/2025 15:57
PC3 - INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Bidding package 09: VTTB shopping for operation and maintenance at Dak Pone Population in the form Simplified Online Bidding .
25/09/2025 10:17
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 09: VTTB shopping for operation and maintenance at Dak Pone Population - Project, Procurement estimate: Procurement for VTTB to serve the operation and maintenance at Dak Pone with 1 bidding package .
23/09/2025 14:20
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 09: VTTB shopping for operation and maintenance at Dak Pone Population - Project, Procurement estimate: Procurement for VTTB to serve the operation and maintenance at Dak Pone with 1 bidding package .
23/09/2025 14:12
The data sheet has been partially hidden, to see the full information please Login or Register
PC3 - INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Package No. 10: Procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant .
- Winning bidder: TDVN TRADING AND TECHNICAL SERVICES CO.,LTD
27/10/2025 16:02
PC3 - INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Bidding package 09: VTTB shopping for operation and maintenance at Dak Pone Population .
- Winning bidder: EMC THANH TAM COMPANY LIMITED
07/10/2025 15:57
PC3 - INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Providing cleaning services at Electricity Investment Joint Stock Company 3 .
- Winning bidder: INTERNATIONAL CLEANING TECHNOLOGY AND TRADING JOINT STOCK COMPANY
03/09/2025 16:52
PC3 - INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Provide security services at Electricity Investment Joint Stock Company 3 .
- Winning bidder: VY GIA SECURITY SERVICE COMPANY LIMITED
03/09/2025 16:44
PC3 - INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Bidding package 06: Monitor cycle 2 and 2nd dam safety testing; Mapping corridor to protect water source - Da Krong 1 hydroelectric plant .
- Winning bidder: ELECTRIC CONSTRUCTION AND COMMERCE COMPANY LIMITED
13/08/2025 15:15
PC3 - INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Package No. 07: VTTB shopping for maintenance in 2025 at Dak Pone Population .
- Winning bidder: VU GIA EQUIPMENT LIMITED LIABILITY COMPANY
01/07/2025 09:58
PC3 - INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Bidding package 06: Monitor cycle 2 and 2nd dam safety testing; Mapping corridor to protect water source - Da Krong 1 hydroelectric plant with 2 participating contractors .
20/06/2025 09:30
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Bidding package 08: Repairing VH1 operating management road - Da Krong 1 hydroelectric plant with 1 bidding package .
19/06/2025 08:15
PC3 - INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Tender package No 07: VTTB shopping for maintenance in 2025 at Dak Pone Population in the form Simplified Online Bidding .
13/06/2025 14:39
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Projects, procurement estimates: Maintenance plan and cost estimates in 2025 - Dak Pone NMT with 1 bidding package .
12/06/2025 13:34
The data sheet has been partially hidden, to see the full information please Login or Register
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 01 - SCL: Overhaul of working wheel of unit H1 - Dak Pone Hydropower Plant - Procurement estimate: Technical plan - SCL project estimate Item: Overhaul of working wheel of unit H1 - Dak Pone Hydropower Plant with 1 bidding package .
30/12/2025 16:25
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 01: Consulting on adjusting the operating process of Da Krong 1 hydroelectric reservoir with 1 bidding package .
23/12/2025 08:38
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 01: Consulting on adjusting the operating process of Da Krong 1 hydroelectric reservoir with 1 bidding package .
23/12/2025 08:35
The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package No. 10: Procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant of the investor PC3 - INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: TDVN TRADING AND TECHNICAL SERVICES CO.,LTD
27/10/2025 16:02
PC3 - INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Tender package No 10: Procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant in the form Simplified Online Bidding .
13/10/2025 09:37
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 10: Procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant - Procurement estimate: Cost of procurement of VTTB for operation and maintenance at Da Krong 1 Hydropower Plant with 1 bidding package .
09/10/2025 16:07
The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Bidding package 09: VTTB shopping for operation and maintenance at Dak Pone Population of the investor PC3 - INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: EMC THANH TAM COMPANY LIMITED
07/10/2025 15:57
PC3 - INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Bidding package 09: VTTB shopping for operation and maintenance at Dak Pone Population in the form Simplified Online Bidding .
25/09/2025 10:17
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 09: VTTB shopping for operation and maintenance at Dak Pone Population - Project, Procurement estimate: Procurement for VTTB to serve the operation and maintenance at Dak Pone with 1 bidding package .
23/09/2025 14:20
PC3 - INVESTMENT JOINT STOCK COMPANY publishes the plan Package No. 09: VTTB shopping for operation and maintenance at Dak Pone Population - Project, Procurement estimate: Procurement for VTTB to serve the operation and maintenance at Dak Pone with 1 bidding package .
23/09/2025 14:12
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s PC3 - INVESTMENT JOINT STOCK COMPANY has posted 46 of the contractor selection plan, which contains 48 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has posted 49 Tender Notices in 44 bidding packages. Among these, 49 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has posted 54 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 54 package, canceled the bid 0 package (among the bidding packages above).
- There are 11 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has a relationship with 109 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor PC3 - INVESTMENT JOINT STOCK COMPANY has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity PC3 - INVESTMENT JOINT STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects