Data analysis results of DauThau.info software for bid solicitors HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 83 contractor.
- Announced 15 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 78 contractor selection plans with a total of 182 bidding packages, of which 35 prequalification documents have not found the investment project.
- Has invited bids for 51 packages (with 62 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 96 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 60 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 87 packages that have not fully posted the contractor selection results. Of these 82 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.20 contractors.
- Breakdown by bidding field: Goods 14.52%, Construction 67.74%, Consultancy 12.90%, Non-consultancy 4.84%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 349,069,222,375 VND, of which the total winning bid value is: 343,356,606,028 VND.
- The savings rate is: 1.64%.
Data analysis results of DauThau.info software for bid solicitors HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY as follows:
- Has relationships with 83 contractor.
- The average number of contractors participating in each bidding package is: 1.20 contractors.
- Proportion of bidding fields: Goods 14.52%, Construction 67.74%, Consulting 12.90%, Non-consulting 4.84%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 349,069,222,375 VND, in which the total winning value is: 343,356,606,028 VND.
- The savings rate is: 1.64%.
This Bid solicitor is also an investor. The analysis results of data for the investor HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY are as follows:
- Is the investor of 15 development investment projects.
- Is the investor of 89 contractor selection plans, of which 73 were self-published, and 16 were published by other entities.
- Is the investor of 61 Tender Notices, of which 54 were self-invited, and 7 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 5 bidding packages, of which 5 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 72.39% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 81.72% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thanh Hoá (4), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Thanh Hoá (4), Undefined (1)
- Has relationships with 2 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 9 bidding packages with 5 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG HUD4
- Code of capacity certificate of construction activities: 00023803
- Issuer: Sở Kế hoạch và Đầu tư tỉnh Thanh Hóa
- Fields:
⚬ Thi công xây dựng công trình: Dân dụng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Bidding package No. 2: Organizing project protection force in 2026 in the form Open bidding .
23/12/2025 11:28
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 1: Preparation of Bidding Documents, evaluation of Bidding Documents for Bidding Package No. 2. .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG & QUẢN LÝ DỰ ÁN HTD
19/12/2025 17:08
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Tender package No 3: Construction and supply and installation of wastewater treatment station equipment. in the form Open bidding .
19/12/2025 16:49
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes the plan Approve the contractor selection plan after approving the plan and cost estimate with 2 bidding package .
16/12/2025 16:51
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes the plan Approving the contractor selection plan for the second phase of 2025, bidding package No. 03: Prepare environmental registration documents for low-rise housing projects in lots LK-01, LK-02, LK-03 (from boxes 01-16, 21-30, 38-52), BT-01, BT-02 and BT-03 under the project Housing development lot 2, lot 3 under the billion-dollar subdivision planning Charter 1/2000 Quang Hung ward, Thanh Hoa city (now Quang Phu ward). with 1 bidding package .
16/12/2025 15:57
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package number 4:
Supervising the construction of package No. 2: Construction and embellishment of the project technical system and Do river bed and package No. 3 Construction of project greenery. .
- Winning bidder: Center of Construction Quality inspection Thanh Hoa
15/12/2025 15:43
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Tender package No 04: Roads, rainwater drainage on routes N7, N9 and the remaining volume on route N8 in the form Open bidding .
04/12/2025 10:29
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Package No. 03: Examining dossier of feasibility study report on construction investment (2nd time) Housing development project Lot 2, Lot 3 is under the zoning planning of 1/2000 scale of Quang Hung ward, Thanh Hoa city (now Quang Phu Ward) .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ VÀ ĐẦU TƯ XÂY DỰNG MINH ĐỨC
03/12/2025 16:43
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Tender package No 3: Construction and supply and installation of wastewater treatment station equipment. in the form Open bidding .
03/12/2025 14:56
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 01: Prepare feasibility study report documents and apply BIM construction information model for low-rise housing construction investment projects in lots LK-01, LK-02, LK-03 (from boxes 01-16, 21-30, 38-52), BT-01, BT-02 and BT-03. .
- Winning bidder: DSPCONS DESIGN & MANAGEMENT VIETNAM COMPANY LIMITED
26/11/2025 08:55
The data sheet has been partially hidden, to see the full information please Login or Register
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Package 2: Maintenance of fire protection system .
- Winning bidder: ANNAM FIRE FIGHTING AND PREVENTION TECHNOLOGY COMPANY LIMITED
21/08/2025 14:47
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Package 2: Supervision of construction package No. 1 .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG & QUẢN LÝ DỰ ÁN HTD
04/07/2025 16:55
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Package No. 02: Consulting verification of construction drawing design records and estimates of green park items (CX-01, CX-02, CX-03, CX-04, CX-05) .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ DỰ ÁN HÀ NỘI
01/07/2025 16:37
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Package No. 01: Consulting on designing construction drawings and estimates of green park items (CX-01, CX-02, CX-03, CX-04, CX-05) .
- Winning bidder: VIETNAM PLANNING - ARCHITECTURE CONSULTANT JOINT STOCK COMPANY
01/07/2025 16:31
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes the plan Approving the contractor selection plan for consulting packages: Lap; Verification of construction drawing design records and estimates with 2 bidding package .
30/06/2025 16:32
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes the plan Approving the contractor selection plan after approving drawing designs and estimates of the item: walking road to resettlement area TĐC02, TĐC03 and adjacent areas LK09A, LK12 with 2 bidding package .
27/06/2025 17:40
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package 2: Verify the design dossier of the BVTK and estimate the item: Technical infrastructure south of the River River. .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TRƯỜNG ĐỘ
13/06/2025 17:04
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 1: Making design records of BVTK and estimate of item: Technical infrastructure south of the River River. .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG & QUẢN LÝ DỰ ÁN HTD
13/06/2025 17:00
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package The independent audit reports the settlement of the completed work item .
- Winning bidder: THANG LONG AUDITING COMPANY LIMITED
09/06/2025 17:55
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package 1: Maintenance of elevator systems, garbage elevators .
- Winning bidder: AN PHAT EQUIPMENT&AUTOMATION JOINT STOCK COMPANY
09/06/2025 17:43
The data sheet has been partially hidden, to see the full information please Login or Register
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Bidding package No. 2: Organizing project protection force in 2026 in the form Open bidding .
23/12/2025 11:28
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 1: Preparation of Bidding Documents, evaluation of Bidding Documents for Bidding Package No. 2. .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG & QUẢN LÝ DỰ ÁN HTD
19/12/2025 17:08
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Tender package No 3: Construction and supply and installation of wastewater treatment station equipment. in the form Open bidding .
19/12/2025 16:49
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes the plan Approve the contractor selection plan after approving the plan and cost estimate with 2 bidding package .
16/12/2025 16:51
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes the plan Approving the contractor selection plan for the second phase of 2025, bidding package No. 03: Prepare environmental registration documents for low-rise housing projects in lots LK-01, LK-02, LK-03 (from boxes 01-16, 21-30, 38-52), BT-01, BT-02 and BT-03 under the project Housing development lot 2, lot 3 under the billion-dollar subdivision planning Charter 1/2000 Quang Hung ward, Thanh Hoa city (now Quang Phu ward). with 1 bidding package .
16/12/2025 15:57
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package number 4:
Supervising the construction of package No. 2: Construction and embellishment of the project technical system and Do river bed and package No. 3 Construction of project greenery. .
- Winning bidder: Center of Construction Quality inspection Thanh Hoa
15/12/2025 15:43
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Tender package No 04: Roads, rainwater drainage on routes N7, N9 and the remaining volume on route N8 in the form Open bidding .
04/12/2025 10:29
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Package No. 03: Examining dossier of feasibility study report on construction investment (2nd time) Housing development project Lot 2, Lot 3 is under the zoning planning of 1/2000 scale of Quang Hung ward, Thanh Hoa city (now Quang Phu Ward) .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ VÀ ĐẦU TƯ XÂY DỰNG MINH ĐỨC
03/12/2025 16:43
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY publishes Tender Notice Tender package No 3: Construction and supply and installation of wastewater treatment station equipment. in the form Open bidding .
03/12/2025 14:56
HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 01: Prepare feasibility study report documents and apply BIM construction information model for low-rise housing construction investment projects in lots LK-01, LK-02, LK-03 (from boxes 01-16, 21-30, 38-52), BT-01, BT-02 and BT-03. .
- Winning bidder: DSPCONS DESIGN & MANAGEMENT VIETNAM COMPANY LIMITED
26/11/2025 08:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY has posted 78 of the contractor selection plan, which contains 182 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY has posted 62 Tender Notices in 51 bidding packages. Among these, 50 Tender Notices were self-invited, and 12 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY has posted 96 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 96 package, canceled the bid 0 package (among the bidding packages above).
- There are 60 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY has a relationship with 83 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY has a relationship with 29 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity HUD4 INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects