Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 3 project owners.
- Has relationships with 16 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 31 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 12 packages (with 13 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 18 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 15 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 69.23%, Consultancy 30.77%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 53,501,881,085 VND, of which the total winning bid value is: 53,427,637,000 VND.
- The savings rate is: 0.14%.
Data analysis results of DauThau.info software for bid solicitors DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY as follows:
- Has relationships with 16 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 69.23%, Consulting 30.77%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 53,501,881,085 VND, in which the total winning value is: 53,427,637,000 VND.
- The savings rate is: 0.14%.
This Bid solicitor is also an investor. The analysis results of data for the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 7 contractor selection plans, of which 7 were self-published, and 0 were published by other entities.
- Is the investor of 10 Tender Notices, of which 10 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 94 bidding packages, of which 93 were won, 1 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 70.57% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 104.74% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (22), Phú Thọ (4), Hải Phòng (4), Lâm Đồng (4), An Giang (3), Ninh Bình (2), Nghệ An (2), Gia Lai (1), Khánh Hòa (1), Undefined (51)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (22), Vĩnh Phúc (4), Hải Phòng (3), Lâm Đồng (3), Kiên Giang (3), Ninh Bình (2), Nghệ An (2), Hải Dương (1), Bình Định (1), Khánh Hòa (1), Undefined (52)
- Has relationships with 44 Bid Solicitors
- Has competed against 1 contractors in 1 bidding packages, won 0 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 332 bidding packages with 26 roles.
- Name of construction organization: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG ĐẠI SƠN
- Code of capacity certificate of construction activities: 00015708
- Issuer: Sở kế hoạch và đầu tư Thành phố Hà Nội
- Fields:
⚬ Khảo sát xây dựng: Địa chất
⚬ Khảo sát xây dựng: Địa hình
⚬ Lập quy hoạch xây dựng: Lập quy hoạch xây dựng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-03: Preparation of the F/S report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
26/05/2023 14:16
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-01: Consultancy on preparation of feasibility study report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
06/05/2023 16:51
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Tender package TV-03: Preparation of the F/S report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
06/05/2023 15:55
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Tender package TV-01: Consultancy on preparation of feasibility study report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
05/04/2023 09:56
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the request Project contractor selection plan: Swimming training pool/BTM of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with 4 bidding package.
26/08/2022 11:01
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Consolidate and build fences to protect zones A and B of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: Công ty Cổ phần Xây dựng, Thương Mại và Dịch Vụ Thành Nam
26/07/2022 17:38
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 07: The whole construction + air conditioning + light electricity + fire protection of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ THƯƠNG MẠI VÀ PHÁT TRIỂN XÂY DỰNG HOÀNG HƯNG
13/05/2022 16:14
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Package 07: The whole construction + air conditioning + light electricity + fire protection of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form National competitive bidding.
27/04/2022 14:35
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Package 07: The whole construction + air conditioning + light electricity + fire protection of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form National competitive bidding.
25/04/2022 08:36
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the request Construction contractor selection plan: Building a new cafeteria and hall of Battalion 26/BTM/TCHC of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with 5 bidding package.
20/04/2022 10:20
The data sheet has been partially hidden, to see the full information please Login or Register
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Tender package TV-03: Preparation of the F/S report .
- Winning bidder: 13-5 CONSTRUCTION INVESTMENT AND DESIGN CONSULTING JOINT STOCK COMPANY, MINH LUONG MECHANICAL ELECTRICAL CONSTRUCTION INSTALLTION AND DESIGN CONSULTANT COMPANY LIMITED
26/05/2023 14:16
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Tender package TV-03: Preparation of the F/S report with 1 participating contractors .
16/05/2023 16:01
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Tender package TV-01: Consultancy on preparation of feasibility study report .
- Winning bidder: BZ VIET NAM JOINT STOCK COMPANY, PHU LUONG MECHANICAL ELECTRICAL COMPANY LIMITED
06/05/2023 16:51
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Tender package TV-03: Preparation of the F/S report in the form Open bidding .
06/05/2023 15:55
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY publishes the plan Plan to select contractors for bidding packages Consultancy and preparation for investment projects on construction of barracks of Brigade 602/BTM Navy with 5 bidding package .
21/04/2023 14:49
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY announced the results of the bidding package Tender package TV-01: Consultancy on preparation of feasibility study report with 1 participating contractors .
15/04/2023 10:07
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY publishes Tender Notice Tender package TV-01: Consultancy on preparation of feasibility study report in the form Open bidding .
05/04/2023 09:56
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY publishes the plan The plan to select the contractor for the 1st phase of the Naval Academy Civil Service project (phase 2) with 4 bidding package .
31/03/2023 15:47
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY publishes the plan Project contractor selection plan: Swimming training pool/BTM with 4 bidding package .
26/08/2022 11:01
DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY announced the results of the bid package Consolidate and build fences to protect zones A and B .
- Winning bidder: Công ty Cổ phần Xây dựng, Thương Mại và Dịch Vụ Thành Nam
26/07/2022 17:38
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-03: Preparation of the F/S report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
26/05/2023 14:16
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Tender package TV-01: Consultancy on preparation of feasibility study report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
06/05/2023 16:51
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Tender package TV-03: Preparation of the F/S report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
06/05/2023 15:55
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Tender package TV-01: Consultancy on preparation of feasibility study report of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form Open bidding.
05/04/2023 09:56
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the request Project contractor selection plan: Swimming training pool/BTM of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with 4 bidding package.
26/08/2022 11:01
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Consolidate and build fences to protect zones A and B of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: Công ty Cổ phần Xây dựng, Thương Mại và Dịch Vụ Thành Nam
26/07/2022 17:38
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the results of the bidding package Package 07: The whole construction + air conditioning + light electricity + fire protection of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ THƯƠNG MẠI VÀ PHÁT TRIỂN XÂY DỰNG HOÀNG HƯNG
13/05/2022 16:14
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Package 07: The whole construction + air conditioning + light electricity + fire protection of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form National competitive bidding.
27/04/2022 14:35
Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted Tender Notice Package 07: The whole construction + air conditioning + light electricity + fire protection of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with the form National competitive bidding.
25/04/2022 08:36
The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted the request Construction contractor selection plan: Building a new cafeteria and hall of Battalion 26/BTM/TCHC of the investor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY with 5 bidding package.
20/04/2022 10:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted 12 of the contractor selection plan, which contains 31 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted 13 Tender Notices in 12 bidding packages. Among these, 10 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has posted 18 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 18 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has a relationship with 16 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has a relationship with 1 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity DAI SON CONSTRUCTION INVESTMENT JOINT STOCK COMPANY has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects