Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN as follows:
- Has relationships with 1 project owners.
- Has relationships with 18 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 40 contractor selection plans with a total of 51 bidding packages, of which 37 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 43 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 6 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,621,175,492 VND, of which the total winning bid value is: 5,500,254,634 VND.
- The savings rate is: 16.93%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN as follows:
- Has relationships with 18 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,621,175,492 VND, in which the total winning value is: 5,500,254,634 VND.
- The savings rate is: 16.93%.
This Bid solicitor is also an investor. The analysis results of data for the investor CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 48 contractor selection plans, of which 34 were self-published, and 14 were published by other entities.
- Is the investor of 4 Tender Notices, of which 0 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Cutting grass in the leveled area of the Phuoc Kien Settlement Area project (phase 2) with 1 bidding package .
22/12/2025 15:22
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Mowing plots, parks and clearing grass on sidewalks for the housing and recreation area project (phase 1) with 1 bidding package .
22/12/2025 15:15
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Construction and repair of road surface of route No. 14 for housing and entertainment area project (phase 1) .
- Winning bidder: NGHIA PHAT INVESTMENT COMPANY LIMITED
02/12/2025 15:05
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Consulting on operation of 120m3/day and night wastewater treatment station and report on environmental protection of Song Ong Lon Housing Area project .
- Winning bidder: SAI GON ENVIRONMENTAL AND CONSTRUCTION DEVELOPMENT INVESTMENT CORPORATION
11/11/2025 10:21
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Construction and repair of road surface of route No. 14 of Housing and entertainment area project (phase 1). with 1 bidding package .
07/11/2025 09:13
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Non -advisory operating wastewater treatment station (phase 1 - capacity of 250m³/day and night) Project of housing and entertainment area (phase 1) .
- Winning bidder: MY VIET ENVIRONMENTAL TECHNOLOGY GEOLOGY JONT STOCK COMPANY
06/11/2025 11:27
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Operation of 120m3/day and night wastewater treatment plant and Report on environmental protection work of Song Ong Lon Housing Area project with 1 bidding package .
21/10/2025 09:25
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Consulting provides anti -re -encroachment protection services in the IIA area, riverside residential project .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ BẢO VỆ AN NINH NHẤT
07/10/2025 08:23
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Construction and installation of steel mesh fences in IIA area of the river residential project .
- Winning bidder: THAO SANG CONSTRUCTION COMPANY LIMITED
30/09/2025 11:03
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Operating the wastewater treatment station (phase 1 - capacity of 250m³/day and night) The project of housing and entertainment area (phase 1) with 1 bidding package .
12/09/2025 16:14
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Advice on making reports on environmental protection periodically in 2025 An Phu Tay settlement project .
- Winning bidder: AN THINH PHAT CONSULTING JOINT STOCK COMPANY
04/07/2025 15:40
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Advice on making reports on environmental protection periodically in 2025 Phuoc Kien settlement project (phase 1) .
- Winning bidder: AN THINH PHAT CONSULTING JOINT STOCK COMPANY
04/07/2025 15:36
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Advice on making reports on environmental protection periodically in 2025 An Phu Tay settlement project with 1 bidding package .
06/06/2025 14:23
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Advice on making reports on environmental protection periodically in 2025 Phuoc Kien settlement project (phase 1) with 1 bidding package .
06/06/2025 14:19
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Consulting on the implementation of the land parcel, editing the overall map, positioning and burying concrete pillars at the compensated land area (the northern area of Dao Su Tich street) The Phuoc Kien settlement project - phase 2 .
- Winning bidder: phuc thanh construction surveying corporation
28/05/2025 08:43
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Non -advice providing protection service for wastewater treatment stations of Phuoc Kien settlement area (phase 1) .
- Winning bidder: BONG SEN SECURITY SERVICE JOINT STOCK COMPANY
07/05/2025 15:13
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Consulting on land price appraisal at the project of housing and entertainment area (phase 1) .
- Winning bidder: THINH VUONG EVALUATION AND REAL ESTATEBUSINESS INVESTMENTCORPORATION
07/05/2025 15:02
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Consulting on the implementation of the land parcel, editing the overall map, positioning and burying concrete pillars at the compensated land area (the northern area of Dao Su Tich street) The Phuoc Kien settlement project - phase 2 with 1 bidding package .
05/05/2025 08:44
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Excess advice is recorded in the recognition of the event and establishing a micro -equal to the company that supports the support of dismantling and relocating for households to recover the ground and occupied by households (Northern Rach Ten area) under the Phuoc Kien settlement project - phase 2 with 1 bidding package .
10/04/2025 11:06
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Consulting on land price appraisal at the project of housing and entertainment area (phase 1) with 1 bidding package .
03/03/2025 08:59
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Cutting grass in the leveled area of the Phuoc Kien Settlement Area project (phase 2) with 1 bidding package .
22/12/2025 15:22
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Mowing plots, parks and clearing grass on sidewalks for the housing and recreation area project (phase 1) with 1 bidding package .
22/12/2025 15:15
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Construction and repair of road surface of route No. 14 for housing and entertainment area project (phase 1) .
- Winning bidder: NGHIA PHAT INVESTMENT COMPANY LIMITED
02/12/2025 15:05
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Consulting on operation of 120m3/day and night wastewater treatment station and report on environmental protection of Song Ong Lon Housing Area project .
- Winning bidder: SAI GON ENVIRONMENTAL AND CONSTRUCTION DEVELOPMENT INVESTMENT CORPORATION
11/11/2025 10:21
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Construction and repair of road surface of route No. 14 of Housing and entertainment area project (phase 1). with 1 bidding package .
07/11/2025 09:13
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Non -advisory operating wastewater treatment station (phase 1 - capacity of 250m³/day and night) Project of housing and entertainment area (phase 1) .
- Winning bidder: MY VIET ENVIRONMENTAL TECHNOLOGY GEOLOGY JONT STOCK COMPANY
06/11/2025 11:27
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Operation of 120m3/day and night wastewater treatment plant and Report on environmental protection work of Song Ong Lon Housing Area project with 1 bidding package .
21/10/2025 09:25
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Consulting provides anti -re -encroachment protection services in the IIA area, riverside residential project .
- Winning bidder: CÔNG TY TNHH DỊCH VỤ BẢO VỆ AN NINH NHẤT
07/10/2025 08:23
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN announced the results of the bid package Construction and installation of steel mesh fences in IIA area of the river residential project .
- Winning bidder: THAO SANG CONSTRUCTION COMPANY LIMITED
30/09/2025 11:03
CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN publishes the plan Operating the wastewater treatment station (phase 1 - capacity of 250m³/day and night) The project of housing and entertainment area (phase 1) with 1 bidding package .
12/09/2025 16:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN has posted 40 of the contractor selection plan, which contains 51 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN has posted 43 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 43 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN has a relationship with 18 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CÔNG TY CỔ PHẦN PHÁT TRIỂN NAM SÀI GÒN has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects