Data analysis results of DauThau.info software for bid solicitors THACH KHE IRON ORE JOINT STOCK COMPANY as follows:
- Has relationships with 0 project owners.
- Has relationships with 3 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 40.00%, Construction 20.00%, Consultancy 40.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 32,865,599,474 VND, of which the total winning bid value is: 30,848,859,000 VND.
- The savings rate is: 6.14%.
Data analysis results of DauThau.info software for bid solicitors THACH KHE IRON ORE JOINT STOCK COMPANY as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 40.00%, Construction 20.00%, Consulting 40.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 32,865,599,474 VND, in which the total winning value is: 30,848,859,000 VND.
- The savings rate is: 6.14%.
This Bid solicitor is also an investor. The analysis results of data for the investor THACH KHE IRON ORE JOINT STOCK COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 4 contractor selection plans, of which 0 were self-published, and 4 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor THACH KHE IRON ORE JOINT STOCK COMPANY has posted the results of the bidding package TV2-129: Surveying consultancy, construction drawing design - phase 1 (mine part) (Published on bidding newspaper No. 51 on 22/03/2017) of the investor THACH KHE IRON ORE JOINT STOCK COMPANY.
22/03/2017 08:01
The Bid solicitor THACH KHE IRON ORE JOINT STOCK COMPANY has posted the results of the bidding package V2-108: Re-measure the topography of the mine area (standardize the topography after 5 years of measurement) (600 ha). (Published in the auction newspaper No. 174 on September 14, 2016) of the investor THACH KHE IRON ORE JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần tư vấn xây dựng Việt Hà
14/09/2016 07:31
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Canals for flood drainage and water supply and drainage from mines to Bac Hai village of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 5 bidding package.
04/08/2015 14:29
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Canals to drain flood, drain from the mine pit to Nam Hai village of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 4 bidding package.
30/07/2015 09:52
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Investment in exploiting and selecting iron ore from Thach Khe mine, Ha Tinh (adjusted). of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 10 bidding package.
02/04/2015 17:42
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Thach Hai commune health station of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 5 bidding package.
09/12/2014 09:47
The data sheet has been partially hidden, to see the full information please Login or Register
THACH KHE IRON ORE JOINT STOCK COMPANY announced the results of the bid package TV2-129: Surveying consultancy, construction drawing design - phase 1 (mine part) (Published on bidding newspaper No. 51 on 22/03/2017) .
- Winning bidder: Công ty CP Tư vấn đầu tư mỏ và công nghiệp - Vinacomin
22/03/2017 08:01
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice TV2-130: Consulting to design and design construction drawings for the embankment embankment embankment dyke line. (Posted on the auction newspaper No. 216 on 11/11/2016) in the form National competitive bidding .
11/11/2016 07:33
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice TV2-129: Surveying consultancy, construction drawing design - phase 1 (mine part) (Published on bidding newspaper No. 210 dated 03/11/2016) in the form National competitive bidding .
03/11/2016 10:19
THACH KHE IRON ORE JOINT STOCK COMPANY announced the results of the bid package V2-108: Re-measure the topography of the mine area (standardize the topography after 5 years of measurement) (600 ha). (Published in the auction newspaper No. 174 on September 14, 2016) .
- Winning bidder: Công ty cổ phần tư vấn xây dựng Việt Hà
14/09/2016 07:31
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice TV2-108: Re-measure the topography of the mine area (standardize the topography after 5 years of measurement) (600 ha). (Posted on the auction newspaper No. 101 on June 2, 2016) in the form National competitive bidding .
02/06/2016 07:54
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice Construction of upgrading the clean water system in Thach Ban commune (No. 1, January 4, 2016) in the form National competitive bidding .
04/01/2016 09:32
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice TV1-54.3 Preparation of technical design and estimation of the embankment protection dike route. (Newspaper issue 249 on December 29, 2015) in the form National competitive bidding .
29/12/2015 10:25
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice TV2-119: Auditing phase I (November 224 dated 24/11/2015) in the form National competitive bidding .
24/11/2015 09:09
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice TV2-89: Technical design verification. Issue 203 October 26, 2015 in the form National competitive bidding .
23/10/2015 14:49
THACH KHE IRON ORE JOINT STOCK COMPANY publishes Tender Notice Construction of canals for flood drainage and water supply for production from mine pits to Bac Hai hamlet. Newspaper issue 174 dated September 15, 2015 in the form National competitive bidding .
15/09/2015 09:20
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor THACH KHE IRON ORE JOINT STOCK COMPANY has posted the results of the bidding package TV2-129: Surveying consultancy, construction drawing design - phase 1 (mine part) (Published on bidding newspaper No. 51 on 22/03/2017) of the investor THACH KHE IRON ORE JOINT STOCK COMPANY.
22/03/2017 08:01
The Bid solicitor THACH KHE IRON ORE JOINT STOCK COMPANY has posted the results of the bidding package V2-108: Re-measure the topography of the mine area (standardize the topography after 5 years of measurement) (600 ha). (Published in the auction newspaper No. 174 on September 14, 2016) of the investor THACH KHE IRON ORE JOINT STOCK COMPANY.
- Winning bidder: Công ty cổ phần tư vấn xây dựng Việt Hà
14/09/2016 07:31
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Canals for flood drainage and water supply and drainage from mines to Bac Hai village of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 5 bidding package.
04/08/2015 14:29
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Canals to drain flood, drain from the mine pit to Nam Hai village of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 4 bidding package.
30/07/2015 09:52
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Investment in exploiting and selecting iron ore from Thach Khe mine, Ha Tinh (adjusted). of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 10 bidding package.
02/04/2015 17:42
The Bid solicitor Chứng thư số đăng tải TBMT - PMU PPA has posted the request Thach Hai commune health station of the investor THACH KHE IRON ORE JOINT STOCK COMPANY with 5 bidding package.
09/12/2014 09:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor THACH KHE IRON ORE JOINT STOCK COMPANY has posted 5 Tender Notices in 5 bidding packages. Among these, -18 Tender Notices were self-invited, and 23 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor THACH KHE IRON ORE JOINT STOCK COMPANY has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor THACH KHE IRON ORE JOINT STOCK COMPANY has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects