Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors SONG DA 2 JOINT - STOCK COMPANY as follows:
- Has relationships with 0 project owners.
- Has relationships with 4 contractor.
- Announced 5 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 13 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 57.14%, Construction 0%, Consultancy 42.86%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,907,521,155 VND, of which the total winning bid value is: 7,174,196,561 VND.
- The savings rate is: 27.59%.
Data analysis results of DauThau.info software for bid solicitors SONG DA 2 JOINT - STOCK COMPANY as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 57.14%, Construction 0%, Consulting 42.86%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,907,521,155 VND, in which the total winning value is: 7,174,196,561 VND.
- The savings rate is: 27.59%.
This Bid solicitor is also an investor. The analysis results of data for the investor SONG DA 2 JOINT - STOCK COMPANY are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 0 contractor selection plans, of which 0 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 4 bidding packages, of which 2 were won, 2 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 88.08% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.34% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Thái Nguyên (3), Nghệ An (1)
- Provinces before the merger where the contractor has participated in bidding : Nghệ An (1), Thái Nguyên (1), Undefined (2)
- Has relationships with 3 Bid Solicitors
- Has competed against 14 contractors in 3 bidding packages, won 0 packages, lost 1 packages, 2 are pending results, and 0 were canceled.
- Has collaborated with 2 contractors in 2 bidding packages, won 2 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Name of construction organization: Công ty Cổ phần Sông Đà 2
- Code of capacity certificate of construction activities: 00017172
- Issuer: Sở Kế hoạch và Đầu tư thành phố Hà Nội
- Fields:
⚬ Thi công xây dựng công trình: Dân dụng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project Urban area of cactus lake, Thai Nguyen city.
07/10/2020 07:00
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Supply and installation of Kios substation 320KVA of the investor SONG DA 2 JOINT - STOCK COMPANY.
14/05/2019 14:07
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project Project of Residential area adjacent to Huu Nghi ward, Hoa Binh city.
09/04/2019 07:00
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Prepare feasibility study report of the investor SONG DA 2 JOINT - STOCK COMPANY.
09/11/2018 10:46
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Package 11 - Auditing of the project of the urban area of Xuong Rong Lake, Thai Nguyen city of the investor SONG DA 2 JOINT - STOCK COMPANY.
- Winning bidder: Công ty TNHH Hãng kiểm toán AASC Hoàng Đạo Thúy Đào tạo
12/09/2018 14:30
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project CT2 mixed-use apartment building - Ho Xuong Rong urban area.
18/07/2018 07:00
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project CT2 mixed-use apartment building - Ho Xuong Rong urban area.
22/05/2018 11:11
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project Urban area of cactus lake, Thai Nguyen city.
22/05/2018 07:00
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Package 04: Supply of completed teaching materials (Posted on bidding newspaper No. 147 on August 5, 2016) of the investor SONG DA 2 JOINT - STOCK COMPANY.
- Winning bidder: Công ty CP Đầu tư thiết bị Công nghiệp Anh Vũ
05/08/2016 08:07
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Package 02: Provide 02 double-cage hoists, height 85m, load >= 1.5 tons/cage (Posted on bidding newspaper No. 137 dated 22/07/2016) of the investor SONG DA 2 JOINT - STOCK COMPANY.
- Winning bidder: Công ty CP Sản xuất và Thương mại Việt Phát
22/07/2016 05:16
The data sheet has been partially hidden, to see the full information please Login or Register
SONG DA 2 JOINT - STOCK COMPANY publishes Tender Notice Quality inspection of construction works in the form National competitive bidding .
11/12/2020 09:02
SONG DA 2 JOINT - STOCK COMPANY publishes the plan LCCT (adjustment) package No. 7 - Quality inspection of works with 1 bidding package .
07/10/2020 15:35
SONG DA 2 JOINT - STOCK COMPANY announced the results of the bid package Supply and installation of Kios substation 320KVA .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG NAM ĐIỆN
14/05/2019 14:07
SONG DA 2 JOINT - STOCK COMPANY publishes Tender Notice Supply and installation of Kios substation 320KVA in the form National Competitive Bidding .
09/04/2019 16:36
SONG DA 2 JOINT - STOCK COMPANY publishes the plan Plan to select contractor for the Residential Area Project adjacent to Huu Nghi ward, Hoa Binh city with 1 bidding package .
09/04/2019 13:58
SONG DA 2 JOINT - STOCK COMPANY announced the results of the bid package Prepare feasibility study report .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN THIẾT KẾ XUÂN MAI
09/11/2018 10:46
SONG DA 2 JOINT - STOCK COMPANY announced the results of the bid package Package 11 - Auditing of the project of the urban area of Xuong Rong Lake, Thai Nguyen city .
- Winning bidder: Công ty TNHH Hãng kiểm toán AASC Hoàng Đạo Thúy Đào tạo
12/09/2018 14:30
SONG DA 2 JOINT - STOCK COMPANY publishes Tender Notice Prepare feasibility study report in the form National competitive bidding .
18/07/2018 14:58
SONG DA 2 JOINT - STOCK COMPANY publishes the plan Contractor selection plan in the investment preparation phase of the CT2 mixed-use apartment building project - HXR urban area with 5 bidding package .
18/07/2018 12:22
SONG DA 2 JOINT - STOCK COMPANY publishes the plan Plan for selection of contractors in the pre-investment stage with 5 bidding package .
22/05/2018 11:29
The data sheet has been partially hidden, to see the full information please Login or Register
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project Urban area of cactus lake, Thai Nguyen city.
07/10/2020 07:00
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Supply and installation of Kios substation 320KVA of the investor SONG DA 2 JOINT - STOCK COMPANY.
14/05/2019 14:07
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project Project of Residential area adjacent to Huu Nghi ward, Hoa Binh city.
09/04/2019 07:00
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Prepare feasibility study report of the investor SONG DA 2 JOINT - STOCK COMPANY.
09/11/2018 10:46
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Package 11 - Auditing of the project of the urban area of Xuong Rong Lake, Thai Nguyen city of the investor SONG DA 2 JOINT - STOCK COMPANY.
- Winning bidder: Công ty TNHH Hãng kiểm toán AASC Hoàng Đạo Thúy Đào tạo
12/09/2018 14:30
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project CT2 mixed-use apartment building - Ho Xuong Rong urban area.
18/07/2018 07:00
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project CT2 mixed-use apartment building - Ho Xuong Rong urban area.
22/05/2018 11:11
Investor SONG DA 2 JOINT - STOCK COMPANY has posted an investment and development project Urban area of cactus lake, Thai Nguyen city.
22/05/2018 07:00
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Package 04: Supply of completed teaching materials (Posted on bidding newspaper No. 147 on August 5, 2016) of the investor SONG DA 2 JOINT - STOCK COMPANY.
- Winning bidder: Công ty CP Đầu tư thiết bị Công nghiệp Anh Vũ
05/08/2016 08:07
The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted the results of the bidding package Package 02: Provide 02 double-cage hoists, height 85m, load >= 1.5 tons/cage (Posted on bidding newspaper No. 137 dated 22/07/2016) of the investor SONG DA 2 JOINT - STOCK COMPANY.
- Winning bidder: Công ty CP Sản xuất và Thương mại Việt Phát
22/07/2016 05:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s SONG DA 2 JOINT - STOCK COMPANY has posted 5 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted 7 Tender Notices in 7 bidding packages. Among these, -1 Tender Notices were self-invited, and 8 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor SONG DA 2 JOINT - STOCK COMPANY has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects