Data analysis results of DauThau.info software for bid solicitors CENTRAL HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 198 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 127 contractor selection plans with a total of 120 bidding packages, of which 126 prequalification documents have not found the investment project.
- Has invited bids for 169 packages (with 173 tender notices), and conducted prequalification for 0 packages.
- There are 12 bidding packages with content that needs clarification.
- Announced the results of 183 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 50 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 25 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.30 contractors.
- Breakdown by bidding field: Goods 39.31%, Construction 20.23%, Consultancy 10.40%, Non-consultancy 30.06%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 80,765,987,156 VND, of which the total winning bid value is: 74,802,427,825 VND.
- The savings rate is: 7.38%.
Data analysis results of DauThau.info software for bid solicitors CENTRAL HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 198 contractor.
- The average number of contractors participating in each bidding package is: 2.30 contractors.
- Proportion of bidding fields: Goods 39.31%, Construction 20.23%, Consulting 10.40%, Non-consulting 30.06%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 80,765,987,156 VND, in which the total winning value is: 74,802,427,825 VND.
- The savings rate is: 7.38%.
This Bid solicitor is also an investor. The analysis results of data for the investor CENTRAL HYDROPOWER JOINT STOCK COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 80 contractor selection plans, of which 75 were self-published, and 5 were published by other entities.
- Is the investor of 204 Tender Notices, of which 173 were self-invited, and 31 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 10 bidding packages, of which 4 were won, 5 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 92.54% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.91% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (3), Quảng Ngãi (2), Huế (2), Đồng Nai (1), Lâm Đồng (1), Đắk Lắk (1)
- Provinces before the merger where the contractor has participated in bidding : Quảng Nam (2), Kon Tum (2), Huế (2), Đồng Nai (1), Lâm Đồng (1), Đắk Lắk (1), Undefined (1)
- Has relationships with 6 Bid Solicitors
- Has competed against 10 contractors in 5 bidding packages, won 0 packages, lost 4 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 0 packages, lost 1 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 60 bidding packages with 31 roles.
- Name of construction organization: Công ty Cổ phần Thủy điện miền Trung
- Code of capacity certificate of construction activities: 00026666
- Issuer: Sở Kế hoạch và Đầu tư thành phố Đà Nẵng
- Fields:
⚬ Giám sát thi công xây dựng công trình: Công nghiệp (Thủy điện, Đường dây và Trạm biến áp)
⚬ Giám sát thi công xây dựng công trình: Năng lượng (trừ nhiệt điện, điện gió, điện hạt nhân)
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 09/2026/PTV-ALCJ: Verification of meters and measurement systems of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 of the investor CENTRAL HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: CENTRAL ELECTRICAL TESTING COMPANY LIMITED
31/12/2025 15:53
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 07/2026/PTV-ALCJ: Inspection and testing of electrical equipment of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 in the form Competitive Offer .
31/12/2025 09:15
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes the plan Package No. 07/2026/PTV-ALCJ: Inspection and testing of electrical equipment of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 with 1 bidding package .
30/12/2025 11:35
The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 20/2025/TB-VP: Supply and installation of water purifiers with alkaline ion technology for the Company's office of the investor CENTRAL HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: PAT TECHNOLOGY COMPANY LIMITED
26/12/2025 10:56
The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 53/2025/TB-ALCJ: Procurement of installation accessories for rooftop solar power systems of 2 factories of the investor CENTRAL HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH một thành viên Ánh Dương Solar
25/12/2025 14:15
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 09/2026/PTV-ALCJ: Verification of meters and measurement systems of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 in the form Simplified Online Bidding .
23/12/2025 19:51
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes the plan Package No. 09/2026/PTV-ALCJ: Verification of meters and measurement systems of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 with 1 bidding package .
23/12/2025 15:40
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 20/2025/TB-VP: Supply and installation of water purifiers with alkaline ion technology for the Company's office in the form Simplified Online Bidding .
19/12/2025 14:39
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 53/2025/TB-ALCJ: Procurement of installation accessories for rooftop solar power systems of 2 factories in the form Simplified Online Bidding .
18/12/2025 08:25
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 01/2026/PTV-VP Company car insurance in 2026 .
- Winning bidder: PVI Insurance
17/12/2025 08:15
The data sheet has been partially hidden, to see the full information please Login or Register
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 09/2026/PTV-ALCJ: Verification of meters and measurement systems of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 .
- Winning bidder: CENTRAL ELECTRICAL TESTING COMPANY LIMITED
31/12/2025 15:53
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 20/2025/TB-VP: Supply and installation of water purifiers with alkaline ion technology for the Company's office .
- Winning bidder: PAT TECHNOLOGY COMPANY LIMITED
26/12/2025 10:56
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 53/2025/TB-ALCJ: Procurement of installation accessories for rooftop solar power systems of 2 factories .
- Winning bidder: Công ty TNHH một thành viên Ánh Dương Solar
25/12/2025 14:15
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 50/2025/TB-ALCJ: Procurement of 80 kW backup inverter for rooftop solar systems of 2 factories .
- Winning bidder: PAT TECHNOLOGY COMPANY LIMITED
10/12/2025 15:55
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 45/2025/XL-AL Repair and maintenance of construction items Technical infrastructure and auxiliary items Production control area of A Luoi Hydropower Plant - Item: A Co's exterior gate .
- Winning bidder: TIN TRUONG THANH CONSTRUCTION COUNSULTANCY COMPANY LIMITED
10/12/2025 14:57
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 06/2025/XL-CJ: Repair and maintenance of construction works in 2025 (section: Warehouse, drainage ditch, fence) - Cu Jut solar power plant project .
- Winning bidder: CÔNG TY TNHH MTV HOÀNG PHÁT TÂY NGUYÊN
10/12/2025 14:56
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 49/2025/XL-AL: Maintenance and repair of construction items in 2025 (Section: Buoy lines in the vicinity) A Luoi Hydropower Plant Project .
- Winning bidder: TIN TRUONG THANH CONSTRUCTION COUNSULTANCY COMPANY LIMITED
08/12/2025 15:46
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 02/2026/TB-ALCJ: Procurement of goods for operation and repair in 2026 at A Luoi Hydropower Plant and Cu Jut Solar Power Plant .
- Winning bidder: HOANG LIEN SON EQUIPMENT AND SERVICE COMPANY LIMITED
21/11/2025 16:24
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 48/2025/XL-AL: Maintenance and repair of construction work items of A Co housing area - A Luoi Hydroelectric Plant .
- Winning bidder: TIN TRUONG THANH CONSTRUCTION COUNSULTANCY COMPANY LIMITED
11/11/2025 15:22
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Package No. 46/2025/XL-AL: Repairing damage to the working area, cafeteria, and motel of Hong Ha office area in 2025, A Luoi Hydropower Plant .
- Winning bidder: CÔNG TY TNHH MTV THƯƠNG MẠI & DỊCH VỤ SỸ LÂM WINDOW
06/11/2025 08:32
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 09/2026/PTV-ALCJ: Verification of meters and measurement systems of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 of the investor CENTRAL HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: CENTRAL ELECTRICAL TESTING COMPANY LIMITED
31/12/2025 15:53
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 07/2026/PTV-ALCJ: Inspection and testing of electrical equipment of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 in the form Competitive Offer .
31/12/2025 09:15
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes the plan Package No. 07/2026/PTV-ALCJ: Inspection and testing of electrical equipment of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 with 1 bidding package .
30/12/2025 11:35
The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 20/2025/TB-VP: Supply and installation of water purifiers with alkaline ion technology for the Company's office of the investor CENTRAL HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: PAT TECHNOLOGY COMPANY LIMITED
26/12/2025 10:56
The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted the results of the bidding package Package No. 53/2025/TB-ALCJ: Procurement of installation accessories for rooftop solar power systems of 2 factories of the investor CENTRAL HYDROPOWER JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH một thành viên Ánh Dương Solar
25/12/2025 14:15
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 09/2026/PTV-ALCJ: Verification of meters and measurement systems of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 in the form Simplified Online Bidding .
23/12/2025 19:51
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes the plan Package No. 09/2026/PTV-ALCJ: Verification of meters and measurement systems of A Luoi Hydropower Plant, Cu Jut Solar Power Plant in 2026 with 1 bidding package .
23/12/2025 15:40
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 20/2025/TB-VP: Supply and installation of water purifiers with alkaline ion technology for the Company's office in the form Simplified Online Bidding .
19/12/2025 14:39
CENTRAL HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Tender package No 53/2025/TB-ALCJ: Procurement of installation accessories for rooftop solar power systems of 2 factories in the form Simplified Online Bidding .
18/12/2025 08:25
CENTRAL HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Bidding package No. 01/2026/PTV-VP Company car insurance in 2026 .
- Winning bidder: PVI Insurance
17/12/2025 08:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted 127 of the contractor selection plan, which contains 120 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted 173 Tender Notices in 169 bidding packages. Among these, 173 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has posted 183 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 183 package, canceled the bid 0 package (among the bidding packages above).
- There are 50 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has a relationship with 198 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CENTRAL HYDROPOWER JOINT STOCK COMPANY has a relationship with 14 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CENTRAL HYDROPOWER JOINT STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects