Data analysis results of DauThau.info software for bid solicitors ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY as follows:
- Has relationships with 28 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 31 packages (with 35 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 26 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.30 contractors.
- Breakdown by bidding field: Goods 11.43%, Construction 77.14%, Consultancy 11.43%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 117,063,117,286 VND, of which the total winning bid value is: 116,214,187,834 VND.
- The savings rate is: 0.73%.
Data analysis results of DauThau.info software for bid solicitors ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 1.30 contractors.
- Proportion of bidding fields: Goods 11.43%, Construction 77.14%, Consulting 11.43%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 117,063,117,286 VND, in which the total winning value is: 116,214,187,834 VND.
- The savings rate is: 0.73%.
You need to Login or Sign up to view all informations.
- Participated in 64 bidding packages, of which 64 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total bid-winning value: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice)
- Lowest bid rate when participating: 0% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.75% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces participated in the bidding: Hưng Yên (41), Quảng Ninh (1), Hà Nội (1), Undefined (21)
- Has relationships with 40 Bid Solicitors
- Has competed against 1 contractors in 1 bidding packages, won 0 packages, lost 0 packages, 1 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 1 bidding packages, won 1 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Name of construction organization: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG ECO3
- Code of capacity certificate of construction activities: 00074385
- Issuer: Sở Kế hoạch và Đầu tư Tỉnh Hưng Yên
- Fields:
⚬ Lập thiết kế quy hoạch xây dựng:
⚬ Tư vấn quản lý dự án đầu tư xây dựng: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Tư vấn giám sát thi công xây dựng công trình: Dân dụng
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction work of repairing and upgrading the kindergarten site in An Dam village, Danh Xa village, Hoang Hoa Tham commune of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: MINH KHANG XD ARCHITECTURE COMPANY LIMITED
25/10/2024 22:13
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction supervision consultancy of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH tư vấn xây dựng Thanh Tùng Hưng Yên
24/10/2024 16:35
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction of traffic route from Cua Gan sewer to Cau Tay pump station, Lien Phuong commune, Hung Yen city of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Open bidding.
21/10/2024 09:55
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction work of repairing and maintaining the 2-story classroom building of Hiep Cuong Kindergarten of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Competitive Offer.
17/10/2024 22:27
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction works of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Competitive Offer.
17/10/2024 21:05
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction of traffic route from Cua Gan sewer to Cau Tay pump station, Lien Phuong commune, Hung Yen city of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Open bidding.
17/10/2024 18:11
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Project management consultancy of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: TPC CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
17/10/2024 08:58
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction supervision consultancy of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
17/10/2024 08:55
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction works of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: MINH KHANG XD ARCHITECTURE COMPANY LIMITED
16/10/2024 20:48
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction works of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH XD&TM THÀNH PHÁT HƯNG YÊN
14/10/2024 20:56
The data sheet has been partially hidden, to see the full information please Login or Register
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY announced the results of the bid package Construction work of repairing and upgrading the kindergarten site in An Dam village, Danh Xa village, Hoang Hoa Tham commune .
- Winning bidder: MINH KHANG XD ARCHITECTURE COMPANY LIMITED
25/10/2024 22:13
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY announced the results of the bid package Construction supervision consultancy .
- Winning bidder: Công ty TNHH tư vấn xây dựng Thanh Tùng Hưng Yên
24/10/2024 16:35
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY announced the results of the bidding package Construction work of repairing and maintaining the 2-story classroom building of Hiep Cuong Kindergarten with 1 participating contractors .
24/10/2024 14:40
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY announced the results of the bidding package Construction works with 1 participating contractors .
24/10/2024 14:40
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY publishes Tender Notice Construction of traffic route from Cua Gan sewer to Cau Tay pump station, Lien Phuong commune, Hung Yen city in the form Open bidding .
21/10/2024 09:55
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY announced the results of the bidding package Construction supervision consultancy with 1 participating contractors .
18/10/2024 17:20
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY announced the results of the bidding package Tender package No 01: Construction work with 1 participating contractors .
18/10/2024 15:07
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY publishes Tender Notice Construction work of repairing and maintaining the 2-story classroom building of Hiep Cuong Kindergarten in the form Competitive Offer .
17/10/2024 22:27
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY publishes Tender Notice Construction works in the form Competitive Offer .
17/10/2024 21:05
ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY publishes Tender Notice Construction of traffic route from Cua Gan sewer to Cau Tay pump station, Lien Phuong commune, Hung Yen city in the form Open bidding .
17/10/2024 18:11
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction work of repairing and upgrading the kindergarten site in An Dam village, Danh Xa village, Hoang Hoa Tham commune of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: MINH KHANG XD ARCHITECTURE COMPANY LIMITED
25/10/2024 22:13
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction supervision consultancy of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: Công ty TNHH tư vấn xây dựng Thanh Tùng Hưng Yên
24/10/2024 16:35
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction of traffic route from Cua Gan sewer to Cau Tay pump station, Lien Phuong commune, Hung Yen city of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Open bidding.
21/10/2024 09:55
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction work of repairing and maintaining the 2-story classroom building of Hiep Cuong Kindergarten of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Competitive Offer.
17/10/2024 22:27
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction works of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Competitive Offer.
17/10/2024 21:05
Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted Tender Notice Construction of traffic route from Cua Gan sewer to Cau Tay pump station, Lien Phuong commune, Hung Yen city of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY with the form Open bidding.
17/10/2024 18:11
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Project management consultancy of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: TPC CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
17/10/2024 08:58
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction supervision consultancy of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
17/10/2024 08:55
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction works of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: MINH KHANG XD ARCHITECTURE COMPANY LIMITED
16/10/2024 20:48
The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted the results of the bidding package Construction works of the investor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY.
- Winning bidder: CÔNG TY TNHH XD&TM THÀNH PHÁT HƯNG YÊN
14/10/2024 20:56
The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted 35 Tender Notice in the 31 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has posted 26 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 26 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ECO3 CONSTRUCTION CONSULTING JOINT STOCK COMPANY has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code