Data analysis results of DauThau.info software for bid solicitors TUNG LAM - ASIA JOINT STOCK COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 4 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 4 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors TUNG LAM - ASIA JOINT STOCK COMPANY as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor TUNG LAM - ASIA JOINT STOCK COMPANY are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 3 contractor selection plans, of which 3 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 358 bidding packages, of which 329 were won, 28 were lost, 0 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 66.97% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.55% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Đà Nẵng (26), Hải Phòng (24), TP.Hồ Chí Minh (21), Bắc Ninh (18), Đắk Lắk (11), Quảng Trị (9), Cà Mau (9), Gia Lai (8), Hưng Yên (8), Hà Tĩnh (8), Huế (6), Ninh Bình (6), Quảng Ngãi (6), Khánh Hòa (6), Nghệ An (6), Hà Nội (5), Đồng Tháp (5), An Giang (2), Quảng Ninh (2), Vĩnh Long (2), Lào Cai (2), Lạng Sơn (1), Đồng Nai (1), Lâm Đồng (1), Cần Thơ (1), Tây Ninh (1), Thanh Hoá (1), Undefined (162)
- Provinces before the merger where the contractor has participated in bidding : Đà Nẵng (21), TP.Hồ Chí Minh (16), Bắc Ninh (15), Hải Dương (15), Đắk Lắk (11), Hải Phòng (9), Hà Tĩnh (8), Bạc Liêu (7), Bình Định (6), Thái Bình (6), Huế (6), Nam Định (6), Nghệ An (6), Hà Nội (5), Bà Rịa - Vũng Tàu (5), Quảng Trị (5), Quảng Bình (4), Đồng Tháp (4), Ninh Thuận (4), Quảng Nam (3), Quảng Ngãi (3), Bắc Giang (3), Gia Lai (2), Cà Mau (2), Hưng Yên (2), Khánh Hòa (2), An Giang (2), Quảng Ninh (2), Bến Tre (2), Lạng Sơn (1), Bình Phước (1), Bình Thuận (1), Hậu Giang (1), Kon Tum (1), Long An (1), Lào Cai (1), Tiền Giang (1), Yên Bái (1), Thanh Hoá (1), Undefined (168)
- Has relationships with 108 Bid Solicitors
- Has competed against 104 contractors in 47 bidding packages, won 18 packages, lost 28 packages, 0 are pending results, and 1 were canceled.
- Has collaborated with 6 contractors in 9 bidding packages, won 4 packages, lost 5 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
- Name of construction organization: Công ty Cổ phần Tùng Lâm - ASIA
- Code of capacity certificate of construction activities: 00079769
- Issuer: Sở Kế hoạch và Đầu tư thành phố Đà Nẵng
- Fields:
⚬ Thi công xây dựng công trình: Dân dụng
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor TUNG LAM - ASIA JOINT STOCK COMPANY has posted the request Headquarters of the High People's Procuracy in Da Nang of the investor TUNG LAM - ASIA JOINT STOCK COMPANY with 1 bidding package.
02/02/2024 13:39
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project Headquarters of the High People's Procuracy in Da Nang.
02/02/2024 11:11
The Bid solicitor TUNG LAM - ASIA JOINT STOCK COMPANY has posted the request Procurement of signs for Ly Thai To Transaction Office under VCB North Dak Lak Branch of the investor TUNG LAM - ASIA JOINT STOCK COMPANY with 1 bidding package.
26/01/2024 14:39
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project Procurement of signs for Ly Thai To Transaction Office under VCB North Dak Lak Branch.
26/01/2024 14:14
The Bid solicitor TUNG LAM - ASIA JOINT STOCK COMPANY has posted the request PROCUREMENT AND INSTALLATION OF OFFICE FURNITURE of the investor TUNG LAM - ASIA JOINT STOCK COMPANY with 1 bidding package.
28/12/2023 14:15
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project PROCUREMENT AND INSTALLATION OF OFFICE FURNITURE.
28/12/2023 14:14
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project FURNITURE SHOPPING.
13/02/2023 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
TUNG LAM - ASIA JOINT STOCK COMPANY publishes the plan Headquarters of the High People's Procuracy in Da Nang with 1 bidding package .
02/02/2024 13:39
TUNG LAM - ASIA JOINT STOCK COMPANY publishes the plan Procurement of signs for Ly Thai To Transaction Office under VCB North Dak Lak Branch with 1 bidding package .
26/01/2024 14:39
TUNG LAM - ASIA JOINT STOCK COMPANY publishes the plan PROCUREMENT AND INSTALLATION OF OFFICE FURNITURE with 1 bidding package .
28/12/2023 14:15
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor TUNG LAM - ASIA JOINT STOCK COMPANY has posted the request Headquarters of the High People's Procuracy in Da Nang of the investor TUNG LAM - ASIA JOINT STOCK COMPANY with 1 bidding package.
02/02/2024 13:39
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project Headquarters of the High People's Procuracy in Da Nang.
02/02/2024 11:11
The Bid solicitor TUNG LAM - ASIA JOINT STOCK COMPANY has posted the request Procurement of signs for Ly Thai To Transaction Office under VCB North Dak Lak Branch of the investor TUNG LAM - ASIA JOINT STOCK COMPANY with 1 bidding package.
26/01/2024 14:39
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project Procurement of signs for Ly Thai To Transaction Office under VCB North Dak Lak Branch.
26/01/2024 14:14
The Bid solicitor TUNG LAM - ASIA JOINT STOCK COMPANY has posted the request PROCUREMENT AND INSTALLATION OF OFFICE FURNITURE of the investor TUNG LAM - ASIA JOINT STOCK COMPANY with 1 bidding package.
28/12/2023 14:15
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project PROCUREMENT AND INSTALLATION OF OFFICE FURNITURE.
28/12/2023 14:14
Investor TUNG LAM - ASIA JOINT STOCK COMPANY has posted an investment and development project FURNITURE SHOPPING.
13/02/2023 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TUNG LAM - ASIA JOINT STOCK COMPANY has posted 4 of the contractor selection plan, which contains 4 of the bidding package. See full list here
Summary: The procuring entity TUNG LAM - ASIA JOINT STOCK COMPANY has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects