Data analysis results of DauThau.info software for bid solicitors CÔNG TY CP CẦU CẢNG MIỀN TRUNG as follows:
- Has relationships with 23 project owners.
- Has relationships with 78 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 65 contractor selection plans with a total of 242 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 124 packages (with 138 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 142 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 23 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 156 packages that have not fully posted the contractor selection results. Of these 152 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.17 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 425,634,037,000 VND, of which the total winning bid value is: 423,716,052,405 VND.
- The savings rate is: 0.45%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY CP CẦU CẢNG MIỀN TRUNG as follows:
- Has relationships with 78 contractor.
- The average number of contractors participating in each bidding package is: 1.17 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 425,634,037,000 VND, in which the total winning value is: 423,716,052,405 VND.
- The savings rate is: 0.45%.
This Bid solicitor is also an investor. The analysis results of data for the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 8 contractor selection plans, of which 8 were self-published, and 0 were published by other entities.
- Is the investor of 17 Tender Notices, of which 17 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 226 bidding packages, of which 226 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 62.1% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.79% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Nghệ An (183), Undefined (43)
- Provinces before the merger where the contractor has participated in bidding : Nghệ An (183), Undefined (43)
- Has relationships with 55 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 303 bidding packages with 21 roles.
- Name of construction organization: Công ty cổ phần cầu cảng Miền Trung
- Code of capacity certificate of construction activities: 00022530
- Issuer: Sở Kế hoạch và Đầu tư Nghệ An
- Fields:
⚬ Quản lý dự án đầu tư xây dựng: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Công nghiệp Nhẹ
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package 03: Construction cost of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
06/10/2023 19:53
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package 03: Construction cost of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
29/08/2023 16:37
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
27/07/2023 15:07
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
24/07/2023 16:27
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
21/07/2023 07:54
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Package 03: Construction cost of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
06/07/2023 11:25
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the request Plan to select construction contractor: Repairing functional houses of Quy Chau district health center of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with 4 bidding package.
28/06/2023 10:57
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Tender package No 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
12/06/2023 15:58
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Tender package No 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
12/06/2023 15:50
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Tender package No 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
09/06/2023 15:34
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bid package The whole construction part .
- Winning bidder: CÔNG TY CỔ PHẦN VI GIA
21/03/2025 16:01
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bid package Bid package number 04: All construction and equipment costs .
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ THƯƠNG MẠI 679
13/03/2025 21:15
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bid package The whole construction part .
- Winning bidder: CÔNG TY CP XÂY DỰNG LÂM KHANG
10/03/2025 10:19
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bidding package The whole construction part with 1 participating contractors .
05/03/2025 15:39
CÔNG TY CP CẦU CẢNG MIỀN TRUNG publishes Tender Notice The whole construction part in the form Open bidding .
24/02/2025 14:44
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bid package Tender package No 03: Construction work .
- Winning bidder: CÔNG TY CP ĐẦU TƯ HT
16/01/2025 14:28
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bid package Package No. 01: The entire construction part of the work .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG DŨNG AN PHÚ
30/12/2024 15:07
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bidding package Tender package No 01: The entire construction part of the work with 1 participating contractors .
27/12/2024 16:48
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bidding package Tender package No 03: Construction work with 3 participating contractors .
26/12/2024 15:20
CÔNG TY CP CẦU CẢNG MIỀN TRUNG announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY CỔ PHẦN MIỀN TÂY NGHỆ AN
21/12/2024 13:29
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package 03: Construction cost of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
06/10/2023 19:53
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package 03: Construction cost of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
29/08/2023 16:37
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
27/07/2023 15:07
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
24/07/2023 16:27
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG.
21/07/2023 07:54
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Package 03: Construction cost of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
06/07/2023 11:25
The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted the request Plan to select construction contractor: Repairing functional houses of Quy Chau district health center of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with 4 bidding package.
28/06/2023 10:57
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Tender package No 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
12/06/2023 15:58
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Tender package No 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
12/06/2023 15:50
Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted Tender Notice Tender package No 01: The entire construction part of the work of the investor CÔNG TY CP CẦU CẢNG MIỀN TRUNG with the form Competitive Offer.
09/06/2023 15:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted 65 of the contractor selection plan, which contains 242 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted 138 Tender Notices in 124 bidding packages. Among these, 17 Tender Notices were self-invited, and 121 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has posted 142 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 142 package, canceled the bid 0 package (among the bidding packages above).
- There are 23 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has a relationship with 78 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY CP CẦU CẢNG MIỀN TRUNG has a relationship with 172 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CÔNG TY CP CẦU CẢNG MIỀN TRUNG has a relationship with 24 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects