Data analysis results of DauThau.info software for bid solicitors CÔNG TY CP TẬP ĐOÀN PNG as follows:
- Has relationships with 0 project owners.
- Has relationships with 3 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 20 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 10 packages (with 10 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 17 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 28,299,645,000 VND, of which the total winning bid value is: 28,264,995,000 VND.
- The savings rate is: 0.12%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY CP TẬP ĐOÀN PNG as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 28,299,645,000 VND, in which the total winning value is: 28,264,995,000 VND.
- The savings rate is: 0.12%.
This Bid solicitor is also an investor. The analysis results of data for the investor CÔNG TY CP TẬP ĐOÀN PNG are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 0 contractor selection plans, of which 0 were self-published, and 0 were published by other entities.
- Is the investor of 5 Tender Notices, of which 5 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 60 bidding packages, of which 50 were won, 5 were lost, 4 are pending results, and 1 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 79.9% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 99.8% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Nghệ An (47), Undefined (13)
- Provinces before the merger where the contractor has participated in bidding : Nghệ An (47), Undefined (14)
- Has relationships with 29 Bid Solicitors
- Has competed against 10 contractors in 14 bidding packages, won 5 packages, lost 5 packages, 4 are pending results, and 0 were canceled.
- Has collaborated with 10 contractors in 5 bidding packages, won 5 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 17 bidding packages with 9 roles.
- Name of construction organization: Công ty cổ phần Tập đoàn PNG
- Code of capacity certificate of construction activities: 00041425
- Issuer: Sở Kế hoạch và Đầu tư Nghệ An
- Fields:
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Dân dụng
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Nông nghiệp và PTNT Thủy lợi
⚬ Thiết kế, thẩm tra thiết kế xây dựng công trình: Hạ tầng kỹ thuật
⚬ Giám sát thi công xây dựng công trình: Dân dụng
⚬ Giám sát thi công xây dựng công trình: Công nghiệp
⚬ Giám sát thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Giám sát thi công xây dựng công trình: Nông nghiệp và PTNT Thủy lợi
⚬ Giám sát thi công xây dựng công trình: Hạ tầng kỹ thuật
⚬ Thi công xây dựng công trình: Dân dụng
⚬ Thi công xây dựng công trình: Công nghiệp
⚬ Thi công xây dựng công trình: Giao thông Cầu, đường bộ
⚬ Thi công xây dựng công trình: Nông nghiệp và PTNT Thủy lợi
⚬ Thi công xây dựng công trình: Hạ tầng kỹ thuật
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted the results of the bidding package Package No. 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG.
18/01/2023 09:25
The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted the results of the bidding package Tender package No 01: The entire construction and installation part of the investor CÔNG TY CP TẬP ĐOÀN PNG.
18/01/2023 08:28
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
12/01/2023 20:36
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
05/01/2023 10:07
Investor CÔNG TY CP TẬP ĐOÀN PNG has posted an investment and development project Renovating and building auxiliary works of Chau Hong Commune Primary School.
05/01/2023 09:09
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 01: The entire construction and installation part of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
28/12/2022 18:40
Investor CÔNG TY CP TẬP ĐOÀN PNG has posted an investment and development project Building a school, a kitchen and ancillary works for the kindergarten in Chau Hong commune.
28/12/2022 17:17
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
18/12/2022 21:36
Investor CÔNG TY CP TẬP ĐOÀN PNG has posted an investment and development project Construction of auxiliary works, renovating the roof of Chau Cuong Kindergarten.
18/12/2022 20:20
The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted the results of the bidding package Package No. 01: The entire construction and construction part and construction contingency costs of the investor CÔNG TY CP TẬP ĐOÀN PNG.
12/08/2021 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bid package Package No. 1: The entire construction and installation part of the work .
- Winning bidder: TIN PHAT CONSULTANT AND CONSTRUCTION LIMITED COMPANY
03/07/2023 14:52
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bid package Package No. 1: The entire construction and installation part of the work .
- Winning bidder: TIN PHAT CONSULTANT AND CONSTRUCTION LIMITED COMPANY
01/07/2023 16:58
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bid package Package No. 1: The entire construction and installation part of the work .
- Winning bidder: TIN PHAT CONSULTANT AND CONSTRUCTION LIMITED COMPANY
01/07/2023 08:51
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bid package Package No. 1: The entire construction and installation part of the work .
- Winning bidder: TIN PHAT CONSULTANT AND CONSTRUCTION LIMITED COMPANY
25/05/2023 17:46
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bidding package Tender package No 1: The entire construction and installation part of the work with 1 participating contractors .
25/05/2023 17:01
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bidding package Tender package No 1: The entire construction and installation part of the work with 2 participating contractors .
24/05/2023 17:43
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bidding package Tender package No 1: The entire construction and installation part of the work with 1 participating contractors .
24/05/2023 17:25
CÔNG TY CP TẬP ĐOÀN PNG announced the results of the bidding package Tender package No 1: The entire construction and installation part of the work with 1 participating contractors .
24/05/2023 17:24
CÔNG TY CP TẬP ĐOÀN PNG publishes Tender Notice Tender package No 1: The entire construction and installation part of the work in the form Competitive Offer .
18/05/2023 11:43
CÔNG TY CP TẬP ĐOÀN PNG publishes Tender Notice Tender package No 1: The entire construction and installation part of the work in the form Competitive Offer .
17/05/2023 17:08
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted the results of the bidding package Package No. 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG.
18/01/2023 09:25
The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted the results of the bidding package Tender package No 01: The entire construction and installation part of the investor CÔNG TY CP TẬP ĐOÀN PNG.
18/01/2023 08:28
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
12/01/2023 20:36
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
05/01/2023 10:07
Investor CÔNG TY CP TẬP ĐOÀN PNG has posted an investment and development project Renovating and building auxiliary works of Chau Hong Commune Primary School.
05/01/2023 09:09
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 01: The entire construction and installation part of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
28/12/2022 18:40
Investor CÔNG TY CP TẬP ĐOÀN PNG has posted an investment and development project Building a school, a kitchen and ancillary works for the kindergarten in Chau Hong commune.
28/12/2022 17:17
Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted Tender Notice Tender package No 1: The entire construction and installation part of the work of the investor CÔNG TY CP TẬP ĐOÀN PNG with the form Competitive Offer.
18/12/2022 21:36
Investor CÔNG TY CP TẬP ĐOÀN PNG has posted an investment and development project Construction of auxiliary works, renovating the roof of Chau Cuong Kindergarten.
18/12/2022 20:20
The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted the results of the bidding package Package No. 01: The entire construction and construction part and construction contingency costs of the investor CÔNG TY CP TẬP ĐOÀN PNG.
12/08/2021 17:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CÔNG TY CP TẬP ĐOÀN PNG has posted 4 of the contractor selection plan, which contains 20 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted 10 Tender Notices in 10 bidding packages. Among these, 5 Tender Notices were self-invited, and 5 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY CP TẬP ĐOÀN PNG has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects