Data analysis results of DauThau.info software for bid solicitors HUA NA HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 2 project owners.
- Has relationships with 93 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 57 contractor selection plans with a total of 54 bidding packages, of which 56 prequalification documents have not found the investment project.
- Has invited bids for 61 packages (with 68 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 59 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.11 contractors.
- Breakdown by bidding field: Goods 44.12%, Construction 23.53%, Consultancy 8.82%, Non-consultancy 23.53%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 176,808,108,960 VND, of which the total winning bid value is: 154,043,190,357 VND.
- The savings rate is: 12.88%.
Data analysis results of DauThau.info software for bid solicitors HUA NA HYDROPOWER JOINT STOCK COMPANY as follows:
- Has relationships with 93 contractor.
- The average number of contractors participating in each bidding package is: 2.11 contractors.
- Proportion of bidding fields: Goods 44.12%, Construction 23.53%, Consulting 8.82%, Non-consulting 23.53%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 176,808,108,960 VND, in which the total winning value is: 154,043,190,357 VND.
- The savings rate is: 12.88%.
This Bid solicitor is also an investor. The analysis results of data for the investor HUA NA HYDROPOWER JOINT STOCK COMPANY are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 61 contractor selection plans, of which 49 were self-published, and 12 were published by other entities.
- Is the investor of 72 Tender Notices, of which 66 were self-invited, and 6 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Repairing landslides on VH4 road and mechanical roof of Hua Na hydroelectric plant in the form Competitive Offer .
13/01/2026 14:16
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Construction of office and conference hall at Hua Na hydroelectric plant with 1 bidding package .
31/12/2025 14:37
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Providing rainfall monitoring services and software to support the operation and regulation of Hua Na hydroelectric plant reservoir, term 2026 ÷ 2027 with 1 bidding package .
31/12/2025 10:59
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Repairing landslides on VH4 road and mechanical roof of Hua Na hydroelectric plant with 1 bidding package .
31/12/2025 10:39
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Providing materials and equipment for periodic repair of equipment systems of Hua Na Hydropower Plant in 2026 (Minor repair) in the form Open bidding .
16/12/2025 09:39
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Operation Insurance Hua Na Hydroelectric Plant and Nam Non Hydroelectric Plant Store 2025 - 2026 .
- Winning bidder: BaoViet Insurance Corporation
05/12/2025 10:40
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Providing materials and equipment for periodic repair of equipment systems of Hua Na Hydropower Plant in 2026 (Minor repair) with 1 bidding package .
04/12/2025 14:40
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Providing strategic backup materials and equipment for Hua Na Hydropower Joint Stock Company in the form Open bidding .
04/12/2025 14:06
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Supply self -selected and silver membranes for generators at Hua Na Hydroelectric Plant in the form Competitive Offer .
14/11/2025 10:53
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Providing strategic backup materials and equipment for Hua Na Hydropower Joint Stock Company with 1 bidding package .
11/11/2025 15:50
The data sheet has been partially hidden, to see the full information please Login or Register
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Supply equipment; tools and tools; Materials and equipment for regular repair of Hua Na Hydroelectric Joint Stock Company .
- Winning bidder: CÔNG TY CỔ PHẦN QUỐC TẾ SÔNG LAM, SYSTEM AND TECHNOLOGY COMPANY LIMITED
18/07/2025 16:16
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Providing hydro -meteorological forecast news for the operation of Hua Na hydroelectric plant in 2025 .
- Winning bidder: Mid-Central Regional Hydro-Meteorological Center
11/07/2025 16:28
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bidding package Providing hydro -meteorological forecast news for the operation of Hua Na hydroelectric plant in 2025 with 1 participating contractors .
02/07/2025 15:00
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Digging open surface of the channel to discharge Nam Non Hydroelectric Plant .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG SƠN LÂM
25/06/2025 09:58
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Providing hydro -meteorological forecast news for the operation of Hua Na hydroelectric plant in 2025 in the form Competitive Offer .
25/06/2025 09:54
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Providing hydro -meteorological forecast news for the operation of Hua Na hydroelectric plant in 2025 with 1 bidding package .
25/06/2025 08:12
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bidding package Supply equipment; tools and tools; Materials and equipment for regular repair of Hua Na Hydroelectric Joint Stock Company with 2 participating contractors .
21/06/2025 17:01
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Move, take care of trees and industrial hygiene at Hua Na Hydroelectric Plant .
- Winning bidder: CÔNG TY TNHH PHÁT TRIỂN ĐÔ THỊ NGHỆ AN
12/06/2025 15:45
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Supply equipment; tools and tools; Materials and equipment for regular repair of Hua Na Hydroelectric Joint Stock Company in the form Open bidding .
12/06/2025 15:34
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Supply equipment; tools and tools; Materials and equipment for regular repair of Hua Na Hydroelectric Joint Stock Company with 1 bidding package .
09/06/2025 09:27
The data sheet has been partially hidden, to see the full information please Login or Register
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Repairing landslides on VH4 road and mechanical roof of Hua Na hydroelectric plant in the form Competitive Offer .
13/01/2026 14:16
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Construction of office and conference hall at Hua Na hydroelectric plant with 1 bidding package .
31/12/2025 14:37
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Providing rainfall monitoring services and software to support the operation and regulation of Hua Na hydroelectric plant reservoir, term 2026 ÷ 2027 with 1 bidding package .
31/12/2025 10:59
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Repairing landslides on VH4 road and mechanical roof of Hua Na hydroelectric plant with 1 bidding package .
31/12/2025 10:39
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Providing materials and equipment for periodic repair of equipment systems of Hua Na Hydropower Plant in 2026 (Minor repair) in the form Open bidding .
16/12/2025 09:39
HUA NA HYDROPOWER JOINT STOCK COMPANY announced the results of the bid package Operation Insurance Hua Na Hydroelectric Plant and Nam Non Hydroelectric Plant Store 2025 - 2026 .
- Winning bidder: BaoViet Insurance Corporation
05/12/2025 10:40
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Providing materials and equipment for periodic repair of equipment systems of Hua Na Hydropower Plant in 2026 (Minor repair) with 1 bidding package .
04/12/2025 14:40
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Providing strategic backup materials and equipment for Hua Na Hydropower Joint Stock Company in the form Open bidding .
04/12/2025 14:06
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes Tender Notice Supply self -selected and silver membranes for generators at Hua Na Hydroelectric Plant in the form Competitive Offer .
14/11/2025 10:53
HUA NA HYDROPOWER JOINT STOCK COMPANY publishes the plan Providing strategic backup materials and equipment for Hua Na Hydropower Joint Stock Company with 1 bidding package .
11/11/2025 15:50
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s HUA NA HYDROPOWER JOINT STOCK COMPANY has posted 57 of the contractor selection plan, which contains 54 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor HUA NA HYDROPOWER JOINT STOCK COMPANY has posted 68 Tender Notices in 61 bidding packages. Among these, 65 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HUA NA HYDROPOWER JOINT STOCK COMPANY has posted 59 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 59 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor HUA NA HYDROPOWER JOINT STOCK COMPANY has a relationship with 93 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor HUA NA HYDROPOWER JOINT STOCK COMPANY has a relationship with 15 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity HUA NA HYDROPOWER JOINT STOCK COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System