Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Công ty CP Xi măng Vicem Hoàng Mai as follows:
- Has relationships with 1 project owners.
- Has relationships with 19 contractor.
- Announced 7 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 51 contractor selection plans with a total of 90 bidding packages, of which 27 prequalification documents have not found the investment project.
- Has invited bids for 115 packages (with 116 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 30 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 17 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 21 packages that have not fully posted the contractor selection results. Of these 20 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.33 contractors.
- Breakdown by bidding field: Goods 87.93%, Construction 8.62%, Consultancy 0.86%, Non-consultancy 1.72%, Mixed 0.86%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 602,071,540,207 VND, of which the total winning bid value is: 594,002,640,810 VND.
- The savings rate is: 1.34%.
Data analysis results of DauThau.info software for bid solicitors Công ty CP Xi măng Vicem Hoàng Mai as follows:
- Has relationships with 19 contractor.
- The average number of contractors participating in each bidding package is: 1.33 contractors.
- Proportion of bidding fields: Goods 87.93%, Construction 8.62%, Consulting 0.86%, Non-consulting 1.72%, Mixed 0.86%, Other 0%.
- The total value according to the bidding package with valid IMP is: 602,071,540,207 VND, in which the total winning value is: 594,002,640,810 VND.
- The savings rate is: 1.34%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty CP Xi măng Vicem Hoàng Mai are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 74 contractor selection plans, of which 51 were self-published, and 23 were published by other entities.
- Is the investor of 16 Tender Notices, of which 15 were self-invited, and 1 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 25 bidding packages, of which 20 were won, 4 were lost, 1 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 78.6% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 98.56% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Nghệ An (11), Quảng Ngãi (4), Gia Lai (2), Huế (1), Undefined (7)
- Provinces before the merger where the contractor has participated in bidding : Nghệ An (11), Quảng Ngãi (4), Bình Định (2), Huế (1), Undefined (8)
- Has relationships with 7 Bid Solicitors
- Has competed against 11 contractors in 10 bidding packages, won 6 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 23 bidding packages with 9 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Contractor selection plan for the package: "Repair of factory gate number 1 drainage ditch; Conveyor fence wall 112BC1; Corrugated iron roof for general material warehouse, limestone warehouse and conveyor belt 116BC6, 116BC8" with 1 bidding package .
27/11/2025 16:04
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Repair conveyor fence wall 112BC1; Corrugated iron roofs for synthetic raw materials warehouses, limestone warehouses and conveyor belts 116BC6, 116BC8 with 1 bidding package .
21/11/2025 15:56
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Repair the fence south of the factory with 1 bidding package .
18/11/2025 15:07
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for selecting contractors for the package: "Building a processing room and storing waste samples" with 1 bidding package .
07/11/2025 10:32
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Contractor selection plan for the package: Opening construction of the company's stadium with 1 bidding package .
30/10/2025 15:00
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Contractor selection plan for the package: "Concrete partition panels for artificial gypsum Additive warehouse; Renovation of waste analysis room" with 1 bidding package .
24/10/2025 18:57
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Bidding contractor selection plan: Repair anti -leak limestone (supplement) with 1 bidding package .
17/09/2025 10:13
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for contractor selection package: Decorating, installing the interior of the canteen with 1 bidding package .
21/08/2025 10:10
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for contractor selection package: Renovating and repairing the cafeteria A5 with 1 bidding package .
04/08/2025 15:01
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for contractor selection package: Repairing shields, drainage ditches of internal roads and restrooms for production operator, center operator with 1 bidding package .
29/07/2025 14:05
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan The contractor selection plan a number of bidding packages for the preparation of investment project of cement warehouse for export No. 02 with 2 bidding package .
13/06/2025 08:21
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Bidding contractor plan: Repair anti -leak limestone warehouse with 1 bidding package .
11/06/2025 15:29
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Bidding contractor selection plan: Repairing waterproofing slot expansion between 2 Silo Clinker and concreting the platform of Jumbo 2 closed area with 1 bidding package .
27/05/2025 09:09
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Project contractor selection plan: internal concrete route factory and automatic import stations with 2 bidding package .
19/05/2025 10:02
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan The contractor selection plan a number of bidding packages for the preparation of investment project to convert the 123EP1 electrostatic dust filter to dust filter with 2 bidding package .
26/04/2025 15:56
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan The contractor selection plan for bidding packages: Making technical designs, estimates; The survey determined the landmark, the boundaries and the quote of Quynh Vinh clay cadastral map phase 3 with 2 bidding package .
22/04/2025 10:28
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Bidding contractor selection plan: Waterproofing cement Si Cement No. 1, 3, 4 with 1 bidding package .
16/04/2025 15:30
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan The plan to select contractors of some bidding packages in the Project Investment Preparation Stage: The internal concrete route of the factory and automatic importing stations with 2 bidding package .
28/03/2025 16:00
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Project contractor selection plan: Upgrading and expanding solid waste waste storage as alternative materials and technical infrastructure with 2 bidding package .
28/03/2025 15:53
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Adjust the plan to select the project contractor to take advantage of emissions to generate electricity - Hoang Mai Cement Factory with 1 bidding package .
26/02/2025 11:16
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Contractor selection plan for the package: "Repair of factory gate number 1 drainage ditch; Conveyor fence wall 112BC1; Corrugated iron roof for general material warehouse, limestone warehouse and conveyor belt 116BC6, 116BC8" with 1 bidding package .
27/11/2025 16:04
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Repair conveyor fence wall 112BC1; Corrugated iron roofs for synthetic raw materials warehouses, limestone warehouses and conveyor belts 116BC6, 116BC8 with 1 bidding package .
21/11/2025 15:56
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Repair the fence south of the factory with 1 bidding package .
18/11/2025 15:07
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for selecting contractors for the package: "Building a processing room and storing waste samples" with 1 bidding package .
07/11/2025 10:32
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Contractor selection plan for the package: Opening construction of the company's stadium with 1 bidding package .
30/10/2025 15:00
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Contractor selection plan for the package: "Concrete partition panels for artificial gypsum Additive warehouse; Renovation of waste analysis room" with 1 bidding package .
24/10/2025 18:57
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Bidding contractor selection plan: Repair anti -leak limestone (supplement) with 1 bidding package .
17/09/2025 10:13
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for contractor selection package: Decorating, installing the interior of the canteen with 1 bidding package .
21/08/2025 10:10
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for contractor selection package: Renovating and repairing the cafeteria A5 with 1 bidding package .
04/08/2025 15:01
Công ty CP Xi măng Vicem Hoàng Mai publishes the plan Plan for contractor selection package: Repairing shields, drainage ditches of internal roads and restrooms for production operator, center operator with 1 bidding package .
29/07/2025 14:05
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty CP Xi măng Vicem Hoàng Mai has posted 51 of the contractor selection plan, which contains 90 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty CP Xi măng Vicem Hoàng Mai has posted 116 Tender Notices in 115 bidding packages. Among these, -58 Tender Notices were self-invited, and 174 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty CP Xi măng Vicem Hoàng Mai has posted 30 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 30 package, canceled the bid 0 package (among the bidding packages above).
- There are 17 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty CP Xi măng Vicem Hoàng Mai has a relationship with 19 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty CP Xi măng Vicem Hoàng Mai has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty CP Xi măng Vicem Hoàng Mai has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects