Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Cà Mau as follows:
- Has relationships with 1 project owners.
- Has relationships with 64 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 98 contractor selection plans with a total of 166 bidding packages, of which 98 prequalification documents have not found the investment project.
- Has invited bids for 174 packages (with 194 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 127 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 42 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.42 contractors.
- Breakdown by bidding field: Goods 1.03%, Construction 84.54%, Consultancy 7.73%, Non-consultancy 6.70%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 380,216,803,395 VND, of which the total winning bid value is: 352,047,123,126 VND.
- The savings rate is: 7.41%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Cà Mau as follows:
- Has relationships with 64 contractor.
- The average number of contractors participating in each bidding package is: 2.42 contractors.
- Proportion of bidding fields: Goods 1.03%, Construction 84.54%, Consulting 7.73%, Non-consulting 6.70%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 380,216,803,395 VND, in which the total winning value is: 352,047,123,126 VND.
- The savings rate is: 7.41%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Cà Mau are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 98 contractor selection plans, of which 98 were self-published, and 0 were published by other entities.
- Is the investor of 171 Tender Notices, of which 171 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 57 bidding packages, of which 57 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 16.89% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 86.69% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cà Mau (12), Undefined (45)
- Provinces before the merger where the contractor has participated in bidding : Cà Mau (11), Bạc Liêu (1), Undefined (45)
- Has relationships with 8 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 348 bidding packages with 30 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 12: Construction of fiber optic cable network from Song Trus 03 to 79 Columns to serve production management in Ngoc Hien district of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Phát triển Thương mại Dịch vụ Xây lắp Hoàng Minh
29/08/2022 07:55
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package No. 11: Construction of fiber optic cable network connecting 110KV Cai Nuoc substation – Dam Doi substation of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Phát triển Thương mại Dịch vụ Xây lắp Hoàng Minh
29/08/2022 07:54
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Bidding package: Auditing consultancy for construction projects 2021 (phase 2) of the investor Công ty Điện lực Cà Mau.
29/07/2022 16:20
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 17: Repairing single-phase medium voltage lines in Thi Tuong, Cai Bat, Dia Chuoi, Tan Buu, Bung Binh, Tan Thuan, Ba Vinh 2, Nha Thiet, Nha Thiet 2, Hung My 2 sections, replacing low-voltage wires replacing stations in Tan Hung commune, Cai Nuoc district. of the investor Công ty Điện lực Cà Mau.
29/07/2022 16:02
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 03: Renovating, upgrading and developing medium and low voltage power grids and stations in Cai Nuoc, Phu Tan and Dam Doi districts in 2022 of the investor Công ty Điện lực Cà Mau.
29/07/2022 15:13
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 02: Renovating, upgrading and developing medium and low voltage power grids and stations in U Minh and Thoi Binh districts in 2022 of the investor Công ty Điện lực Cà Mau.
29/07/2022 15:09
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 05: Repairing single-phase medium and low voltage transmission lines: Kinh Cut, Mui Tau, Cha La Chum Nhuy, Xeo Vinh, Mang Len, Bac Vinh, Ong Nhu Nuoc Lun, Kinh Nuoc Lun, Chim De, Xeo Gia, Xeo Mam, O Ro, Phuoc Ong Tree, Kinh 9, Kinh Mang Chim, Kinh Doi 4, Xeo Rua, Ngoc Hien district of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty cổ phần xây lắp điện Sông Hậu
29/07/2022 14:16
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 18: Repairing medium and low voltage transmission lines and Kinh Hon station, Coi Nam 1A, Bac 5 NR, Khanh Ha 1, 2, 4, 5, 6, Giao Bay 2, 3, Tran Van Thoi district of the investor Công ty Điện lực Cà Mau.
29/07/2022 14:04
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 04: Major repair of Dam Doi district in 2022 of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Tín Thành
29/07/2022 13:56
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 01: Major repair of the city. Ca Mau in 2022 of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Xây lắp điện và Thương Mại Trương Mỹ Kim
29/07/2022 13:55
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Cà Mau publishes Tender Notice Consulting on audit of construction projects in 2022 in the form National competitive bidding .
09/09/2022 09:17
Công ty Điện lực Cà Mau announced the results of the bid package Package 12: Construction of fiber optic cable network from Song Trus 03 to 79 Columns to serve production management in Ngoc Hien district .
- Winning bidder: Công ty TNHH Phát triển Thương mại Dịch vụ Xây lắp Hoàng Minh
29/08/2022 07:55
Công ty Điện lực Cà Mau announced the results of the bid package Package No. 11: Construction of fiber optic cable network connecting 110KV Cai Nuoc substation – Dam Doi substation .
- Winning bidder: Công ty TNHH Phát triển Thương mại Dịch vụ Xây lắp Hoàng Minh
29/08/2022 07:54
Công ty Điện lực Cà Mau publishes Tender Notice Package 15: New construction of a 3-phase medium voltage line connecting the highways to the 110 22kV Thoi Binh station in the form National competitive bidding .
19/08/2022 13:27
Công ty Điện lực Cà Mau publishes Tender Notice Package 14: New construction of a 3-phase medium voltage line connecting the highways to Dinh Binh 110 22kV station in the form National competitive bidding .
19/08/2022 13:26
Công ty Điện lực Cà Mau publishes Tender Notice Tender package No 13: New construction of 3-phase medium voltage transmission line connecting 2 stations 110 22kV Khanh An in the form National competitive bidding .
19/08/2022 13:24
Công ty Điện lực Cà Mau announced the results of the bidding package Package 12: Construction of fiber optic cable network from Song Trus 03 to 79 Columns to serve production management in Ngoc Hien district with 1 participating contractors .
08/08/2022 14:04
Công ty Điện lực Cà Mau announced the results of the bidding package Tender package No 11: Building a fiber optic cable network connecting 110KV Cai Nuoc substation – Dam Doi substation with 1 participating contractors .
08/08/2022 14:02
Công ty Điện lực Cà Mau announced the results of the bid package Bidding package: Auditing consultancy for construction projects 2021 (phase 2) .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN & ĐỊNH GIÁ KHANG VIỆT , CÔNG TY TNHH KIỂM TOÁN VÀ TƯ VẤN A & C
29/07/2022 16:20
Công ty Điện lực Cà Mau announced the results of the bid package Package 17: Repairing single-phase medium voltage lines in Thi Tuong, Cai Bat, Dia Chuoi, Tan Buu, Bung Binh, Tan Thuan, Ba Vinh 2, Nha Thiet, Nha Thiet 2, Hung My 2 sections, replacing low-voltage wires replacing stations in Tan Hung commune, Cai Nuoc district. .
- Winning bidder: Công ty TNHH MTV xây dựng tổng hợp Năm Quân Cà Mau
29/07/2022 16:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 12: Construction of fiber optic cable network from Song Trus 03 to 79 Columns to serve production management in Ngoc Hien district of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Phát triển Thương mại Dịch vụ Xây lắp Hoàng Minh
29/08/2022 07:55
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package No. 11: Construction of fiber optic cable network connecting 110KV Cai Nuoc substation – Dam Doi substation of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Phát triển Thương mại Dịch vụ Xây lắp Hoàng Minh
29/08/2022 07:54
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Bidding package: Auditing consultancy for construction projects 2021 (phase 2) of the investor Công ty Điện lực Cà Mau.
29/07/2022 16:20
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 17: Repairing single-phase medium voltage lines in Thi Tuong, Cai Bat, Dia Chuoi, Tan Buu, Bung Binh, Tan Thuan, Ba Vinh 2, Nha Thiet, Nha Thiet 2, Hung My 2 sections, replacing low-voltage wires replacing stations in Tan Hung commune, Cai Nuoc district. of the investor Công ty Điện lực Cà Mau.
29/07/2022 16:02
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 03: Renovating, upgrading and developing medium and low voltage power grids and stations in Cai Nuoc, Phu Tan and Dam Doi districts in 2022 of the investor Công ty Điện lực Cà Mau.
29/07/2022 15:13
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 02: Renovating, upgrading and developing medium and low voltage power grids and stations in U Minh and Thoi Binh districts in 2022 of the investor Công ty Điện lực Cà Mau.
29/07/2022 15:09
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 05: Repairing single-phase medium and low voltage transmission lines: Kinh Cut, Mui Tau, Cha La Chum Nhuy, Xeo Vinh, Mang Len, Bac Vinh, Ong Nhu Nuoc Lun, Kinh Nuoc Lun, Chim De, Xeo Gia, Xeo Mam, O Ro, Phuoc Ong Tree, Kinh 9, Kinh Mang Chim, Kinh Doi 4, Xeo Rua, Ngoc Hien district of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty cổ phần xây lắp điện Sông Hậu
29/07/2022 14:16
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 18: Repairing medium and low voltage transmission lines and Kinh Hon station, Coi Nam 1A, Bac 5 NR, Khanh Ha 1, 2, 4, 5, 6, Giao Bay 2, 3, Tran Van Thoi district of the investor Công ty Điện lực Cà Mau.
29/07/2022 14:04
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 04: Major repair of Dam Doi district in 2022 of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Tín Thành
29/07/2022 13:56
The Bid solicitor Công ty Điện lực Cà Mau has posted the results of the bidding package Package 01: Major repair of the city. Ca Mau in 2022 of the investor Công ty Điện lực Cà Mau.
- Winning bidder: Công ty TNHH Xây lắp điện và Thương Mại Trương Mỹ Kim
29/07/2022 13:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Cà Mau has posted 98 of the contractor selection plan, which contains 166 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Cà Mau has posted 194 Tender Notices in 174 bidding packages. Among these, 123 Tender Notices were self-invited, and 71 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Cà Mau has posted 127 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 127 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Cà Mau has a relationship with 64 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Cà Mau has a relationship with 9 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Cà Mau has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects