Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Đông Anh as follows:
- Has relationships with 1 project owners.
- Has relationships with 48 contractor.
- Announced 108 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 109 contractor selection plans with a total of 155 bidding packages, of which 28 prequalification documents have not found the investment project.
- Has invited bids for 15 packages (with 15 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 134 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 134 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 50 packages that have not fully posted the contractor selection results. Of these 48 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 26.67%, Construction 40.00%, Consultancy 33.33%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 59,499,359,341 VND, of which the total winning bid value is: 58,154,193,635 VND.
- The savings rate is: 2.26%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Đông Anh as follows:
- Has relationships with 48 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 26.67%, Construction 40.00%, Consulting 33.33%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 59,499,359,341 VND, in which the total winning value is: 58,154,193,635 VND.
- The savings rate is: 2.26%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Đông Anh are as follows:
- Is the investor of 108 development investment projects.
- Is the investor of 391 contractor selection plans, of which 109 were self-published, and 282 were published by other entities.
- Is the investor of 186 Tender Notices, of which 0 were self-invited, and 186 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase) Project: Architectural renovation of substations of QLDKV team 01, 02, 03, 04 in Me Linh district in 2026 with 4 bidding package .
31/12/2025 20:30
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase) project: Improving low voltage power supply capacity at Trung Hau Pagoda, Trung Hau Doai, Thanh Lam 8, Phu Nhi, Tien Phong 16, Tien Phong 5 substations with 4 bidding package .
31/12/2025 20:27
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) with 4 bidding package .
31/12/2025 20:25
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) with 4 bidding package .
31/12/2025 20:21
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 with 4 bidding package .
31/12/2025 20:18
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 with 4 bidding package .
31/12/2025 20:09
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan Package 01-TVQLDA/DTXD-2025: Project management consulting; Package 02-TVTT/ĐTXD-2025: Consulting on verification of Feasibility Study Report; Package 03-TVBCNCKT/DTXD-2025: Consulting on preparing a Feasibility Study Report with 3 bidding package .
31/12/2025 11:18
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 with 5 bidding package .
31/12/2025 08:22
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project: Improving power supply capacity of medium voltage lines 373E1.41 and 374E1.41 Mai Lam with 4 bidding package .
29/12/2025 17:24
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 with 5 bidding package .
29/12/2025 14:35
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Đông Anh publishes the plan Newly built 2 22kV routes from E1.41 Mai Lam TBA supply electricity to Vinhomes Coloa Urban Area with 3 bidding package .
12/06/2025 16:15
Công ty Điện lực Đông Anh publishes the plan The contractor selection plan (investment period) Package No. 10/GS/DTXD-2025 Supervision of construction and construction and installation of VTTB 06 works assigned to invest in 2025 in Vinhomes Coloa urban area. with 1 bidding package .
12/06/2025 16:06
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Project: Building underground cable cable 3 -supply of Vinhomes Coloa urban area with 3 bidding package .
12/06/2025 14:15
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Package 10/XL/DTXD-2025 Construction, supply and installation of VTTB 06 works assigned to invest in 2025 Vinhomes Coloa Urban Area with 1 bidding package .
11/06/2025 15:21
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan for the project investment period: Building TBAs in the round 3 power supply of Vinhomes Coloa Urban Area with 3 bidding package .
11/06/2025 08:57
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Project: Building underground cable cable 1 and round 2 power supply of Vinhomes Coloa urban area with 3 bidding package .
11/06/2025 08:50
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) The project of construction of TBAs in the first circuit of Vinhomes Coloa urban area. with 3 bidding package .
11/06/2025 08:47
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment period) Project: Building TBAs in the circuit of the 2nd power supply of Vinhomes Coloa Urban Area with 3 bidding package .
11/06/2025 08:31
Công ty Điện lực Đông Anh publishes the plan Bidding contractor plan: "Package No. 01/MSHH/2025: Shopping costumes, labor protection equipment in 2025" with 1 bidding package .
09/05/2025 14:26
Công ty Điện lực Đông Anh publishes the plan Bidding package No. 01/ MSHH/ 2025 Purchasing safety tools for operation management with 1 bidding package .
09/05/2025 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase) Project: Architectural renovation of substations of QLDKV team 01, 02, 03, 04 in Me Linh district in 2026 with 4 bidding package .
31/12/2025 20:30
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase) project: Improving low voltage power supply capacity at Trung Hau Pagoda, Trung Hau Doai, Thanh Lam 8, Phu Nhi, Tien Phong 16, Tien Phong 5 substations with 4 bidding package .
31/12/2025 20:27
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) with 4 bidding package .
31/12/2025 20:25
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (Investment implementation phase): Project: Renovating the low voltage power grid in Me Linh district in 2026 (Tam Dong Commune) with 4 bidding package .
31/12/2025 20:21
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 with 4 bidding package .
31/12/2025 20:18
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project: Renovating low-voltage power grids in urban areas, phase 1 of 2025 with 4 bidding package .
31/12/2025 20:09
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan Package 01-TVQLDA/DTXD-2025: Project management consulting; Package 02-TVTT/ĐTXD-2025: Consulting on verification of Feasibility Study Report; Package 03-TVBCNCKT/DTXD-2025: Consulting on preparing a Feasibility Study Report with 3 bidding package .
31/12/2025 11:18
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 with 5 bidding package .
31/12/2025 08:22
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project: Improving power supply capacity of medium voltage lines 373E1.41 and 374E1.41 Mai Lam with 4 bidding package .
29/12/2025 17:24
Công ty Điện lực Đông Anh publishes the plan Contractor selection plan (investment implementation phase) Project to improve power supply capacity of Dong Anh medium voltage lines in 2026 with 5 bidding package .
29/12/2025 14:35
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Đông Anh has posted 109 of the contractor selection plan, which contains 155 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Đông Anh has posted 15 Tender Notices in 15 bidding packages. Among these, -10 Tender Notices were self-invited, and 25 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Đông Anh has posted 134 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 134 package, canceled the bid 0 package (among the bidding packages above).
- There are 134 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Đông Anh has a relationship with 48 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Đông Anh has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects