Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Hoàng Mai as follows:
- Has relationships with 8 project owners.
- Has relationships with 457 contractor.
- Announced 91 investment development project, of which 10 projects have not yet announced the prequalification documents.
- Announced 698 contractor selection plans with a total of 909 bidding packages, of which 615 prequalification documents have not found the investment project.
- Has invited bids for 763 packages (with 837 tender notices), and conducted prequalification for 0 packages.
- There are 12 bidding packages with content that needs clarification.
- Announced the results of 544 package, and canceled bids for 4 packages (among the packages mentioned above).
- There are 105 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 454 packages that have not fully posted the contractor selection results. Of these 413 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.76 contractors.
- Breakdown by bidding field: Goods 43.01%, Construction 27.00%, Consultancy 9.20%, Non-consultancy 14.34%, Mixed 5.97%, Other fields 0.48%.
- The total value according to the packages with valid contractor selection results is: 1,695,295,739,763 VND, of which the total winning bid value is: 1,048,794,177,119 VND.
- The savings rate is: 38.14%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Hoàng Mai as follows:
- Has relationships with 457 contractor.
- The average number of contractors participating in each bidding package is: 1.76 contractors.
- Proportion of bidding fields: Goods 43.01%, Construction 27.00%, Consulting 9.20%, Non-consulting 14.34%, Mixed 5.97%, Other 0.48%.
- The total value according to the bidding package with valid IMP is: 1,695,295,739,763 VND, in which the total winning value is: 1,048,794,177,119 VND.
- The savings rate is: 38.14%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Hoàng Mai are as follows:
- Is the investor of 91 development investment projects.
- Is the investor of 99 contractor selection plans, of which 54 were self-published, and 45 were published by other entities.
- Is the investor of 275 Tender Notices, of which 81 were self-invited, and 194 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 9 bidding packages, of which 9 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 22.51% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 96.59% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (7), Undefined (2)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (7), Undefined (2)
- Has relationships with 8 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 31 bidding packages with 11 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Công ty Điện lực Hoàng Mai has posted Tender Notice Tender package No 02-KHVT22-CHCT: “Purchase of telemetry equipment, signs, safety tools for production and application of the brand identity system on the power grid in 2022” of the investor Công ty Điện lực Hoàng Mai with the form National Competitive Bidding.
14/09/2022 21:25
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request The plan to select contractors for the project “Clearing, arranging floating cable lines on power poles and alleys in Hoang Mai district of the investor Công ty Điện lực Hoàng Mai with 1 bidding package.
14/09/2022 16:59
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request Package No. 02-KHVT22-CHCT: “Purchase of telemetry equipment, signs, safety tools for production and application of the brand identity system on the power grid in 2022” of the investor Công ty Điện lực Hoàng Mai with 1 bidding package.
14/09/2022 13:24
Bid solicitor Công ty Điện lực Hoàng Mai has posted Tender Notice Tender package No 82-DTVT 2022-DTRR: Purchase of materials to serve the works Clearing, arranging cable lines to float on power poles and alleys in Hoang Mai district, package 1 in 2022 of the investor Công ty Điện lực Hoàng Mai with the form National competitive bidding.
12/09/2022 09:24
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request The plan to select contractors for the project “Clearing, arranging floating cable lines on power poles and alleys in Hoang Mai district of the investor Công ty Điện lực Hoàng Mai with 2 bidding package.
08/09/2022 14:46
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request The plan to select the contractor to adjust the project "Overhaul and repair outdoor circuit breakers, consolidate and embellish suspended substations" of the investor Công ty Điện lực Hoàng Mai with 3 bidding package.
07/09/2022 16:12
Investor Công ty Điện lực Hoàng Mai has posted an investment and development project Installing Recloser, LBS with remote monitoring and control for floating medium voltage grid in Son Tay town, and districts: Ba Vi, Dan Phuong, Hoai Duc, Phuc Tho.
27/07/2022 07:00
Investor Công ty Điện lực Hoàng Mai has posted an investment and development project Installing Recloser, LBS with remote monitoring and control for floating medium voltage grids in the districts of Chuong My, Thach That, Quoc Oai, Thanh Oai.
27/07/2022 07:00
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the results of the bidding package Package No. 31-DTVT 2018-DTRR: Purchase of materials for 04 SCL projects in 2018 of the investor Công ty Điện lực Hoàng Mai.
26/07/2022 10:52
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the results of the bidding package Package No. 01 KHVT18-DTRR: “Purchase of VTTB for operation and renewal in the first 6 months of 2018” of the investor Công ty Điện lực Hoàng Mai.
25/07/2022 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 7: Supply and installation of materials, equipment and control system for the whole station with 3 participating contractors .
21/10/2022 15:39
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 02: Supply and installation of equipment with 2 participating contractors .
21/09/2022 13:36
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 03: Supply and install RMU, VTTB cabinets for underground medium voltage grid. with 2 participating contractors .
21/09/2022 09:14
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 03: Supply and install RMU and VTTB cabinets for underground medium voltage grid with 3 participating contractors .
20/09/2022 17:03
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 03: Supply and install RMU and VTTB cabinets for underground medium voltage grid with 2 participating contractors .
19/09/2022 15:41
Công ty Điện lực Hoàng Mai publishes the plan The plan to select contractors for the project “Clearing, arranging floating cable lines on power poles and alleys in Hoang Mai district with 1 bidding package .
14/09/2022 16:59
Công ty Điện lực Hoàng Mai publishes the plan Package No. 02-KHVT22-CHCT: “Purchase of telemetry equipment, signs, safety tools for production and application of the brand identity system on the power grid in 2022” with 1 bidding package .
14/09/2022 13:24
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 02: Supply and installation of equipment with 3 participating contractors .
14/09/2022 12:43
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 05 – Buy MBA for construction investment projects phase 3, phase 4 in 2022 and additional phase 1 in 2022 with 3 participating contractors .
13/09/2022 09:58
Công ty Điện lực Hoàng Mai announced the results of the bidding package Package 3: Supply of materials, equipment, declaration of SCADA installation and construction with 2 participating contractors .
12/09/2022 17:15
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Công ty Điện lực Hoàng Mai has posted Tender Notice Tender package No 02-KHVT22-CHCT: “Purchase of telemetry equipment, signs, safety tools for production and application of the brand identity system on the power grid in 2022” of the investor Công ty Điện lực Hoàng Mai with the form National Competitive Bidding.
14/09/2022 21:25
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request The plan to select contractors for the project “Clearing, arranging floating cable lines on power poles and alleys in Hoang Mai district of the investor Công ty Điện lực Hoàng Mai with 1 bidding package.
14/09/2022 16:59
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request Package No. 02-KHVT22-CHCT: “Purchase of telemetry equipment, signs, safety tools for production and application of the brand identity system on the power grid in 2022” of the investor Công ty Điện lực Hoàng Mai with 1 bidding package.
14/09/2022 13:24
Bid solicitor Công ty Điện lực Hoàng Mai has posted Tender Notice Tender package No 82-DTVT 2022-DTRR: Purchase of materials to serve the works Clearing, arranging cable lines to float on power poles and alleys in Hoang Mai district, package 1 in 2022 of the investor Công ty Điện lực Hoàng Mai with the form National competitive bidding.
12/09/2022 09:24
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request The plan to select contractors for the project “Clearing, arranging floating cable lines on power poles and alleys in Hoang Mai district of the investor Công ty Điện lực Hoàng Mai with 2 bidding package.
08/09/2022 14:46
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the request The plan to select the contractor to adjust the project "Overhaul and repair outdoor circuit breakers, consolidate and embellish suspended substations" of the investor Công ty Điện lực Hoàng Mai with 3 bidding package.
07/09/2022 16:12
Investor Công ty Điện lực Hoàng Mai has posted an investment and development project Installing Recloser, LBS with remote monitoring and control for floating medium voltage grid in Son Tay town, and districts: Ba Vi, Dan Phuong, Hoai Duc, Phuc Tho.
27/07/2022 07:00
Investor Công ty Điện lực Hoàng Mai has posted an investment and development project Installing Recloser, LBS with remote monitoring and control for floating medium voltage grids in the districts of Chuong My, Thach That, Quoc Oai, Thanh Oai.
27/07/2022 07:00
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the results of the bidding package Package No. 31-DTVT 2018-DTRR: Purchase of materials for 04 SCL projects in 2018 of the investor Công ty Điện lực Hoàng Mai.
26/07/2022 10:52
The Bid solicitor Công ty Điện lực Hoàng Mai has posted the results of the bidding package Package No. 01 KHVT18-DTRR: “Purchase of VTTB for operation and renewal in the first 6 months of 2018” of the investor Công ty Điện lực Hoàng Mai.
25/07/2022 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Hoàng Mai has posted 698 of the contractor selection plan, which contains 909 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Hoàng Mai has posted 837 Tender Notices in 763 bidding packages. Among these, 286 Tender Notices were self-invited, and 551 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Hoàng Mai has posted 544 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 544 package, canceled the bid 4 package (among the bidding packages above).
- There are 105 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Hoàng Mai has a relationship with 457 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Hoàng Mai has a relationship with 40 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Hoàng Mai has a relationship with 11 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects