Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Sóc Sơn as follows:
- Has relationships with 1 project owners.
- Has relationships with 19 contractor.
- Announced 7 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 67 contractor selection plans with a total of 108 bidding packages, of which 66 prequalification documents have not found the investment project.
- Has invited bids for 11 packages (with 11 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 108 packages that have not fully posted the contractor selection results. Of these 108 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 45.45%, Construction 36.36%, Consultancy 18.18%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 36,792,316,702 VND, of which the total winning bid value is: 35,474,522,461 VND.
- The savings rate is: 3.58%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Sóc Sơn as follows:
- Has relationships with 19 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 45.45%, Construction 36.36%, Consulting 18.18%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 36,792,316,702 VND, in which the total winning value is: 35,474,522,461 VND.
- The savings rate is: 3.58%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Sóc Sơn are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 67 contractor selection plans, of which 67 were self-published, and 0 were published by other entities.
- Is the investor of 6 Tender Notices, of which 2 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project New construction of substations in Soc Son district in 2022 (Hien Ninh, Minh Tri, Minh Phu, Viet Long communes).
29/06/2022 14:14
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project To build new substations in Soc Son district by 2022 (Dong Xuan, Phu Lo, Mai Dinh, Phu Minh, Tien Duoc communes).
29/06/2022 14:14
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Building new substations in Soc Son district in 2022 (Bac Son, Hong Ky, Trung Gia communes).
29/06/2022 14:14
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after the substation of Hamlet Vuong, Ve Son Dong 1, Ve Son Dong 2, Ve Son Doai 1, Ve Son Doai 2, Ve Son Doai 3, Xuan Dong 1, Xuan Dong 2, Xuan Dong 3, TT X143.
17/05/2022 09:09
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after Xuan Hoa Ceramic Substation, My Linh 1, My Linh 2, My Linh 3, My Linh 4, Xuan Le 1, Xuan Le 2, Truong Dien, Xuan Ap.
17/05/2022 08:08
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after substation Xuan Duc 1, Xuan Duc 2, Xuan Duc 3, Xuan Duc 4, Xuan Duc 5, Dan Tao 1, Dan Tao 2, Dan Tao 3, University of Electricity, Water Resources 2.
17/05/2022 08:08
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after substation Thanh Ninh 1, Thanh Ninh 2, Thanh Ninh 3, Thanh Ninh 4, Thanh Ninh 6, Tan Dan 1, Pump La Lan.
17/05/2022 08:08
The Bid solicitor Công ty Điện lực Sóc Sơn has posted the results of the bidding package Package 04.17: Purchase electrical materials for production of the investor Công ty Điện lực Sóc Sơn.
16/05/2017 09:31
The Bid solicitor Công ty Điện lực Sóc Sơn has posted the request Exploiting the load of Soc Son 110kV station (E1.19) to level the load for DDK 475 E1.19, connecting the loop with 474E1.19 of the investor Công ty Điện lực Sóc Sơn with 6 bidding package.
04/05/2017 16:03
The Bid solicitor Công ty Điện lực Sóc Sơn has posted the request Package 05.17: Purchase of materials for PTM & operation of the investor Công ty Điện lực Sóc Sơn with 1 bidding package.
07/04/2017 09:44
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Sóc Sơn announced the results of the bid package Package 04.17: Purchase electrical materials for production .
- Winning bidder: CÔNG TY TNHH TUẤN ÂN HÀ NỘI
16/05/2017 09:31
Công ty Điện lực Sóc Sơn publishes the plan Exploiting the load of Soc Son 110kV station (E1.19) to level the load for DDK 475 E1.19, connecting the loop with 474E1.19 with 6 bidding package .
04/05/2017 16:03
Công ty Điện lực Sóc Sơn announced the results of the bidding package Package 04.17: Purchase electrical materials for production with 1 participating contractors .
11/04/2017 15:05
Công ty Điện lực Sóc Sơn publishes Tender Notice Package 05.17: Purchase of materials for PTM & operation in the form National competitive bidding .
07/04/2017 11:06
Công ty Điện lực Sóc Sơn publishes the plan Package 05.17: Purchase of materials for PTM & operation with 1 bidding package .
07/04/2017 09:44
Công ty Điện lực Sóc Sơn publishes Tender Notice Package 05.17: Purchase of materials for PTM & operation in the form National competitive bidding .
31/03/2017 12:56
Công ty Điện lực Sóc Sơn publishes Tender Notice Package 04.17: Purchase electrical materials for production in the form Open bidding- No pre-qualification - Only select domestic contractors .
31/03/2017 08:18
Công ty Điện lực Sóc Sơn publishes the plan Buy electrical materials for production with 1 bidding package .
30/03/2017 17:06
Công ty Điện lực Sóc Sơn publishes the plan Buy supplies for painting the column numbering background with 1 bidding package .
29/03/2017 16:57
The data sheet has been partially hidden, to see the full information please Login or Register
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project New construction of substations in Soc Son district in 2022 (Hien Ninh, Minh Tri, Minh Phu, Viet Long communes).
29/06/2022 14:14
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project To build new substations in Soc Son district by 2022 (Dong Xuan, Phu Lo, Mai Dinh, Phu Minh, Tien Duoc communes).
29/06/2022 14:14
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Building new substations in Soc Son district in 2022 (Bac Son, Hong Ky, Trung Gia communes).
29/06/2022 14:14
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after the substation of Hamlet Vuong, Ve Son Dong 1, Ve Son Dong 2, Ve Son Doai 1, Ve Son Doai 2, Ve Son Doai 3, Xuan Dong 1, Xuan Dong 2, Xuan Dong 3, TT X143.
17/05/2022 09:09
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after Xuan Hoa Ceramic Substation, My Linh 1, My Linh 2, My Linh 3, My Linh 4, Xuan Le 1, Xuan Le 2, Truong Dien, Xuan Ap.
17/05/2022 08:08
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after substation Xuan Duc 1, Xuan Duc 2, Xuan Duc 3, Xuan Duc 4, Xuan Duc 5, Dan Tao 1, Dan Tao 2, Dan Tao 3, University of Electricity, Water Resources 2.
17/05/2022 08:08
Investor Công ty Điện lực Sóc Sơn has posted an investment and development project Overhaul and replace the meter box after substation Thanh Ninh 1, Thanh Ninh 2, Thanh Ninh 3, Thanh Ninh 4, Thanh Ninh 6, Tan Dan 1, Pump La Lan.
17/05/2022 08:08
The Bid solicitor Công ty Điện lực Sóc Sơn has posted the results of the bidding package Package 04.17: Purchase electrical materials for production of the investor Công ty Điện lực Sóc Sơn.
16/05/2017 09:31
The Bid solicitor Công ty Điện lực Sóc Sơn has posted the request Exploiting the load of Soc Son 110kV station (E1.19) to level the load for DDK 475 E1.19, connecting the loop with 474E1.19 of the investor Công ty Điện lực Sóc Sơn with 6 bidding package.
04/05/2017 16:03
The Bid solicitor Công ty Điện lực Sóc Sơn has posted the request Package 05.17: Purchase of materials for PTM & operation of the investor Công ty Điện lực Sóc Sơn with 1 bidding package.
07/04/2017 09:44
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Sóc Sơn has posted 67 of the contractor selection plan, which contains 108 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Sóc Sơn has posted 11 Tender Notices in 11 bidding packages. Among these, -13 Tender Notices were self-invited, and 24 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Sóc Sơn has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Sóc Sơn has a relationship with 19 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Sóc Sơn has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects