Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Tây Ninh as follows:
- Has relationships with 1 project owners.
- Has relationships with 437 contractor.
- Announced 122 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 677 contractor selection plans with a total of 791 bidding packages, of which 408 prequalification documents have not found the investment project.
- Has invited bids for 632 packages (with 653 tender notices), and conducted prequalification for 0 packages.
- There are 15 bidding packages with content that needs clarification.
- Announced the results of 460 package, and canceled bids for 1 packages (among the packages mentioned above).
- There are 13 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 219 packages that have not fully posted the contractor selection results. Of these 162 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.09 contractors.
- Breakdown by bidding field: Goods 67.84%, Construction 19.75%, Consultancy 8.42%, Non-consultancy 3.37%, Mixed 0.61%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,610,637,715,461 VND, of which the total winning bid value is: 1,482,976,630,251 VND.
- The savings rate is: 7.93%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Tây Ninh as follows:
- Has relationships with 437 contractor.
- The average number of contractors participating in each bidding package is: 3.09 contractors.
- Proportion of bidding fields: Goods 67.84%, Construction 19.75%, Consulting 8.42%, Non-consulting 3.37%, Mixed 0.61%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,610,637,715,461 VND, in which the total winning value is: 1,482,976,630,251 VND.
- The savings rate is: 7.93%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Tây Ninh are as follows:
- Is the investor of 122 development investment projects.
- Is the investor of 771 contractor selection plans, of which 602 were self-published, and 169 were published by other entities.
- Is the investor of 534 Tender Notices, of which 497 were self-invited, and 37 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 18 bidding packages, of which 18 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 86.47% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 86.71% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Tây Ninh (17), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Undefined (18)
- Has relationships with 1 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and development of distribution grids to ensure public power supply, prevent incidents, resolve voters petitions in Tan Hung district in 2026 with 2 bidding package .
07/01/2026 11:35
Công ty Điện lực Tây Ninh publishes the plan Project: Investing in renovating grid, upgrading the grid from 1 phase to 3 phases at TX. KHAI Tuong, Tan Tru District, Tan Thanh with 2 bidding package .
07/01/2026 11:34
Công ty Điện lực Tây Ninh publishes the plan Project: Investment of electricity grids to ensure power supply to meet the new rural criteria in Thu Thua, Duc Hoa and Duc Hue districts in 2026 with 2 bidding package .
07/01/2026 11:34
Công ty Điện lực Tây Ninh publishes the plan Project: Investment in renovating and upgrading the grid from 1 phase to 3 phases in Can Giuoc district, Tan An City with 2 bidding package .
07/01/2026 11:33
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and development of distribution grids, ensuring the power supply of Thu Thua District Public TBA in 2026 with 2 bidding package .
07/01/2026 11:32
Công ty Điện lực Tây Ninh publishes the plan Project: Investing in renovating and upgrading the grid from 1 phase to 3 phases in Duc Hue district, Thanh Hoa with 2 bidding package .
07/01/2026 11:32
Công ty Điện lực Tây Ninh publishes the plan Project: renovating, upgrading and building new grid development in Tan Thanh district in 2026 with 2 bidding package .
07/01/2026 11:31
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and development of distribution grids, resolving voters petitions, ensuring public power supply, preventing incidents in Vinh Hung district in 2026 with 2 bidding package .
07/01/2026 11:30
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and electricity to ensure electricity supply and reduction in public town's communes in the communes in Moc Hoa district and TX. Kien Tuong in 2026 with 2 bidding package .
07/01/2026 11:29
Công ty Điện lực Tây Ninh publishes the plan Project: Investing in renovating grid connectivity, upgrading the grid from 1 phase to 3 phases in Moc Hoa district, Tan Hung with 2 bidding package .
07/01/2026 11:29
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Tây Ninh publishes the plan Project contractor selection plan: Reduce the loss of electricity grid distribution grid in Trang Bang town in 2025 and anti -overcrowding of distribution grids in Go Dau district in 2025 with 3 bidding package .
26/06/2025 09:54
Công ty Điện lực Tây Ninh publishes the plan New construction of the 482PĐ line for electricity for urban area - service of Phuoc Dong - Words and XDM line 22kV Dong My - Man rub 471PĐC Power supply for convenient residential area with 3 bidding package .
24/06/2025 15:54
Công ty Điện lực Tây Ninh publishes the plan Upgrading 1 -phase grid to 3 phases in An Binh commune, Chau Thanh district in 2025 and anti -overloading the distribution grid in Ben Cau district in 2025 with 3 bidding package .
24/06/2025 15:04
Công ty Điện lực Tây Ninh publishes the plan Plan for contractor selection 02 works: Developing distribution grids in Tan Hoi Industrial Cluster, Tan Chau District in 2025 and anti -overloading distribution grid in Tan Chau district in 2025 with 3 bidding package .
24/06/2025 09:14
Công ty Điện lực Tây Ninh publishes the plan Shopping costume working in 2025 with 1 bidding package .
06/06/2025 10:43
Công ty Điện lực Tây Ninh publishes the plan Shopping shoes in 2025 with 1 bidding package .
02/06/2025 14:28
Công ty Điện lực Tây Ninh publishes the plan Project contractor selection plan: Repair Nissan car number plate 70C-156.93 with 1 bidding package .
13/05/2025 08:12
Công ty Điện lực Tây Ninh publishes the plan Construction of 8 works: Repairing medium pressure lines 01 project in Tan Bien district; Repairing lower voltage lines and reception of medium pressure wires 01 project in Chau Thanh district; Repairing distribution cabinets 01 project in Tay Ninh city; Repairing defects of low voltage lines, TBA, geography, electric signal tank 01 works in Duong Minh Chau district; Repairing lower voltage medium lines, 01 project in Hoa Thanh town; Repairing lower voltage lines, TBA 01 project in Go Dau district; Repairing lower -voltage medium transmission line in Trang Bang town; Repair of replacement of pillars, beams, porcelain medium voltage lines 01 project in Ben Cau district with 9 bidding package .
21/04/2025 14:30
Công ty Điện lực Tây Ninh publishes the plan Plan for selecting contractor design consultants: Anti -overloading electricity grid in Go Dau district in 2025 with 1 bidding package .
09/04/2025 18:17
Công ty Điện lực Tây Ninh publishes the plan Plan for selecting contractor design consultants: new construction of lines 22kV route 482PĐ Electricity for urban area - Service of Phuoc Dong - Words with 1 bidding package .
09/04/2025 18:04
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and development of distribution grids to ensure public power supply, prevent incidents, resolve voters petitions in Tan Hung district in 2026 with 2 bidding package .
07/01/2026 11:35
Công ty Điện lực Tây Ninh publishes the plan Project: Investing in renovating grid, upgrading the grid from 1 phase to 3 phases at TX. KHAI Tuong, Tan Tru District, Tan Thanh with 2 bidding package .
07/01/2026 11:34
Công ty Điện lực Tây Ninh publishes the plan Project: Investment of electricity grids to ensure power supply to meet the new rural criteria in Thu Thua, Duc Hoa and Duc Hue districts in 2026 with 2 bidding package .
07/01/2026 11:34
Công ty Điện lực Tây Ninh publishes the plan Project: Investment in renovating and upgrading the grid from 1 phase to 3 phases in Can Giuoc district, Tan An City with 2 bidding package .
07/01/2026 11:33
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and development of distribution grids, ensuring the power supply of Thu Thua District Public TBA in 2026 with 2 bidding package .
07/01/2026 11:32
Công ty Điện lực Tây Ninh publishes the plan Project: Investing in renovating and upgrading the grid from 1 phase to 3 phases in Duc Hue district, Thanh Hoa with 2 bidding package .
07/01/2026 11:32
Công ty Điện lực Tây Ninh publishes the plan Project: renovating, upgrading and building new grid development in Tan Thanh district in 2026 with 2 bidding package .
07/01/2026 11:31
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and development of distribution grids, resolving voters petitions, ensuring public power supply, preventing incidents in Vinh Hung district in 2026 with 2 bidding package .
07/01/2026 11:30
Công ty Điện lực Tây Ninh publishes the plan Project: Investment and electricity to ensure electricity supply and reduction in public town's communes in the communes in Moc Hoa district and TX. Kien Tuong in 2026 with 2 bidding package .
07/01/2026 11:29
Công ty Điện lực Tây Ninh publishes the plan Project: Investing in renovating grid connectivity, upgrading the grid from 1 phase to 3 phases in Moc Hoa district, Tan Hung with 2 bidding package .
07/01/2026 11:29
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty Điện lực Tây Ninh has posted 677 of the contractor selection plan, which contains 791 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty Điện lực Tây Ninh has posted 653 Tender Notices in 632 bidding packages. Among these, 449 Tender Notices were self-invited, and 204 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Tây Ninh has posted 460 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 460 package, canceled the bid 1 package (among the bidding packages above).
- There are 13 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty Điện lực Tây Ninh has a relationship with 437 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty Điện lực Tây Ninh has a relationship with 18 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Công ty Điện lực Tây Ninh has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects