Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Thanh Xuân as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 14 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Công ty Điện lực Thanh Xuân as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Công ty Điện lực Thanh Xuân are as follows:
- Is the investor of 14 development investment projects.
- Is the investor of 0 contractor selection plans, of which 0 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project "New construction of substations in Thanh Xuan district, phase 1 in 2022".
12/10/2021 14:14
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project “Building new substations in Thanh Xuan district, phase 2, 2022”.
12/10/2021 14:14
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project Increasing the capacity of transformer stations in Thanh Xuan district in the second phase of 2022.
12/10/2021 12:12
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project Renovating and improving the power supply capacity of 22kV . medium voltage transmission lines.
12/10/2021 11:11
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project "Upgrading and renovating substations in Thanh Xuan District in 2021 (Khuong Mai Ward, Thanh Xuan Bac, Thanh Xuan Nam, Kim Giang, Nhan Chinh)".
12/10/2021 11:11
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project "Increasing the capacity of transformer stations in Thanh Xuan district, phase 1 in 2022 (Thanh Xuan Bac, Nhan Chinh, Khuong Dinh)".
12/10/2021 11:11
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project "Upgrading and renovating substations in Thanh Xuan district in 2021 (Kim Giang ward, Thanh Xuan Bac, Thanh Xuan Trung, Khuong Trung, Phuong Liet)".
12/10/2021 11:11
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project “Increasing the capacity of substations in Thanh Xuan District in 2021 (Ha Dinh Ward, Thanh Xuan Trung)”.
25/03/2021 15:15
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project “Building 02 new 22kV underground cable routes after 110kV E1.43 substation (Mo Lao)”.
25/03/2021 11:11
Investor Công ty Điện lực Thanh Xuân has posted an investment and development project "Increasing the capacity of substations in Thanh Xuan District in 2021 (Phuong Liet, Khuong Trung, Khuong Dinh, Thuong Dinh, Nhan Chinh wards)".
25/03/2021 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects