Data analysis results of DauThau.info software for bid solicitors 36.71 BOT COMPANY LIMITED as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 2 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 7 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 2 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,388,000,000 VND, of which the total winning bid value is: 1,363,679,336 VND.
- The savings rate is: 1.75%.
Data analysis results of DauThau.info software for bid solicitors 36.71 BOT COMPANY LIMITED as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,388,000,000 VND, in which the total winning value is: 1,363,679,336 VND.
- The savings rate is: 1.75%.
This Bid solicitor is also an investor. The analysis results of data for the investor 36.71 BOT COMPANY LIMITED are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 1 contractor selection plans, of which 1 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT06: Making the final settlement of investment capital (Mid-term training phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: KDG VIET NAM AUDITING COMPANY LIMITED
13/12/2022 15:46
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT05: Consultancy and verification of BVTC design, cost estimate (Mid-construction phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: THANG LONG DESIGN ADVISORY JOINT STOCK COMPANY
15/11/2022 22:03
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT03: Consultancy, survey, design and estimate (Mid-construction phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG GIAO THÔNG VINACO
15/11/2022 20:48
Investor 36.71 BOT COMPANY LIMITED has posted an investment and development project Medium repair works (phase 1) Construction investment project to renovate and upgrade National Highway 19, section Km17+054,51–Km50+00 in Binh Dinh province and Km108+00–Km131+ 300 in Gia Lai province in the form of BOT contract.
09/11/2022 07:00
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT02: Verification of the feasibility study report for medium repair works (Middle repair phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ THĂNG LONG
29/06/2022 14:05
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT01: Consulting survey, making feasibility study report for construction of medium repair works (Middle repair phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG GIAO THÔNG VINACO
10/06/2022 10:42
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the request Selection of contractor (preparatory phase for investment) for medium repair (middle phase 1) renovation and upgrading project of National Highway 19, section Km17+054.51-Km50+00 in Binh Dinh province and section Km108+00-Km131+300 in Gia Lai province in the form of BOT contract of the investor 36.71 BOT COMPANY LIMITED with 2 bidding package.
20/05/2022 09:22
Investor 36.71 BOT COMPANY LIMITED has posted an investment and development project Medium repair (1st phase) of National Highway 19 renovation and upgrading project, section Km17+054.51-Km50+00 in Binh Dinh province and section Km108+00-Km131+300 in Gia Lai province in the form of a BOT contract.
20/05/2022 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
36.71 BOT COMPANY LIMITED announced the results of the bid package Tender package TVTT06: Making the final settlement of investment capital (Mid-term training phase 1) .
- Winning bidder: KDG VIET NAM AUDITING COMPANY LIMITED
13/12/2022 15:46
36.71 BOT COMPANY LIMITED announced the results of the bid package Tender package TVTT05: Consultancy and verification of BVTC design, cost estimate (Mid-construction phase 1) .
- Winning bidder: THANG LONG DESIGN ADVISORY JOINT STOCK COMPANY
15/11/2022 22:03
36.71 BOT COMPANY LIMITED publishes the plan Plan for selection of consultancy and construction contractors for medium repair works (middle repair phase 1) with 5 bidding package .
15/11/2022 21:58
36.71 BOT COMPANY LIMITED announced the results of the bid package Tender package TVTT03: Consultancy, survey, design and estimate (Mid-construction phase 1) .
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG GIAO THÔNG VINACO
15/11/2022 20:48
36.71 BOT COMPANY LIMITED publishes the plan Plan for selection of consultancy and construction contractors for medium repair works (middle repair phase 1) with 5 bidding package .
09/11/2022 14:00
36.71 BOT COMPANY LIMITED announced the results of the bid package Tender package TVTT02: Verification of the feasibility study report for medium repair works (Middle repair phase 1) .
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ THĂNG LONG
29/06/2022 14:05
36.71 BOT COMPANY LIMITED announced the results of the bid package Tender package TVTT01: Consulting survey, making feasibility study report for construction of medium repair works (Middle repair phase 1) .
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG GIAO THÔNG VINACO
10/06/2022 10:42
36.71 BOT COMPANY LIMITED publishes the plan Selection of contractor (preparatory phase for investment) for medium repair (middle phase 1) renovation and upgrading project of National Highway 19, section Km17+054.51-Km50+00 in Binh Dinh province and section Km108+00-Km131+300 in Gia Lai province in the form of BOT contract with 2 bidding package .
20/05/2022 09:22
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT06: Making the final settlement of investment capital (Mid-term training phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: KDG VIET NAM AUDITING COMPANY LIMITED
13/12/2022 15:46
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT05: Consultancy and verification of BVTC design, cost estimate (Mid-construction phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: THANG LONG DESIGN ADVISORY JOINT STOCK COMPANY
15/11/2022 22:03
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT03: Consultancy, survey, design and estimate (Mid-construction phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG GIAO THÔNG VINACO
15/11/2022 20:48
Investor 36.71 BOT COMPANY LIMITED has posted an investment and development project Medium repair works (phase 1) Construction investment project to renovate and upgrade National Highway 19, section Km17+054,51–Km50+00 in Binh Dinh province and Km108+00–Km131+ 300 in Gia Lai province in the form of BOT contract.
09/11/2022 07:00
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT02: Verification of the feasibility study report for medium repair works (Middle repair phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ THĂNG LONG
29/06/2022 14:05
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the results of the bidding package Tender package TVTT01: Consulting survey, making feasibility study report for construction of medium repair works (Middle repair phase 1) of the investor 36.71 BOT COMPANY LIMITED.
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG GIAO THÔNG VINACO
10/06/2022 10:42
The Bid solicitor 36.71 BOT COMPANY LIMITED has posted the request Selection of contractor (preparatory phase for investment) for medium repair (middle phase 1) renovation and upgrading project of National Highway 19, section Km17+054.51-Km50+00 in Binh Dinh province and section Km108+00-Km131+300 in Gia Lai province in the form of BOT contract of the investor 36.71 BOT COMPANY LIMITED with 2 bidding package.
20/05/2022 09:22
Investor 36.71 BOT COMPANY LIMITED has posted an investment and development project Medium repair (1st phase) of National Highway 19 renovation and upgrading project, section Km17+054.51-Km50+00 in Binh Dinh province and section Km108+00-Km131+300 in Gia Lai province in the form of a BOT contract.
20/05/2022 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s 36.71 BOT COMPANY LIMITED has posted 3 of the contractor selection plan, which contains 7 of the bidding package. See full list here
Summary: The Bid solicitor 36.71 BOT COMPANY LIMITED has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor 36.71 BOT COMPANY LIMITED has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity 36.71 BOT COMPANY LIMITED has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects