Data analysis results of DauThau.info software for bid solicitors Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản as follows:
- Has relationships with 12 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 12 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 2 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 8 packages with results that do not have tender notice or prequalification notice.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 50.00%, Consultancy 50.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,095,240,000 VND, of which the total winning bid value is: 5,030,797,000 VND.
- The savings rate is: 1.26%.
Data analysis results of DauThau.info software for bid solicitors Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản as follows:
- Has relationships with 12 contractor.
- The average number of contractors participating in each bidding package is: 3.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 50.00%, Consulting 50.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,095,240,000 VND, in which the total winning value is: 5,030,797,000 VND.
- The savings rate is: 1.26%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 3 investment and development projects.
- As the owner of 7 Contractor selection plan in which 5 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 3 bidding packages in which 1 packages are self-invited, and 2 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consulting on preparing Bidding Documents, evaluating Proposals for bidding packages: Consulting on surveys to prepare economic and technical reports; Consulting on preparing technical and economic reports. Project: Dredging and solidifying S25 canal in Vu Ban irrigation system of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: T.T.N CONSULTANT CONSTRUCTION COMPANY LIMITED
24/10/2024 16:42
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the request Plan for selecting survey consulting contractors and preparing technical and economic reports Dredging and solidifying S25 canal in Vu Ban irrigation system of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with 3 bidding package.
04/10/2024 14:54
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consultancy and supervision of surveying and construction drawing design of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: LOC VUONG CONSTRUCTION INVESTMENT AND CONSULTING COMPANY LIMITED
20/09/2024 10:11
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consulting, surveying, designing construction drawings - cost estimates of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: BC & D JOINT STOCK COMPANY
30/08/2024 17:09
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản Posted Development Investment Project Dredging and solidifying C25 canal, N1 canal and a number of branch routes, Vu Ban district.
19/07/2024 14:14
Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted Tender Notice Consulting, surveying, designing construction drawings - cost estimates of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with the form Open bidding.
19/07/2024 09:43
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the request Approve the contractor selection plan for the construction design step packages implemented after the basic design of the project Dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with 3 bidding package.
17/07/2024 10:41
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH CHẤT LƯỢNG CÔNG TRÌNH NAM ĐỊNH
11/07/2024 11:57
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the request Approve the contractor selection plan for the construction design step packages implemented after the basic design of the project Dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with 3 bidding package.
06/07/2024 11:22
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consulting and supervising survey work to prepare a Feasibility Study Report for the project of dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: LOC VUONG CONSTRUCTION INVESTMENT AND CONSULTING COMPANY LIMITED
19/01/2024 14:42
The data sheet has been partially hidden, to see the full information please Login or Register
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản announced the results of the bid package Consulting on preparing Bidding Documents, evaluating Proposals for bidding packages: Consulting on surveys to prepare economic and technical reports; Consulting on preparing technical and economic reports. Project: Dredging and solidifying S25 canal in Vu Ban irrigation system .
- Winning bidder: T.T.N CONSULTANT CONSTRUCTION COMPANY LIMITED
24/10/2024 16:42
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản publishes the plan Plan for selecting survey consulting contractors and preparing technical and economic reports Dredging and solidifying S25 canal in Vu Ban irrigation system with 3 bidding package .
04/10/2024 14:54
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản announced the results of the bid package Consultancy and supervision of surveying and construction drawing design .
- Winning bidder: LOC VUONG CONSTRUCTION INVESTMENT AND CONSULTING COMPANY LIMITED
20/09/2024 10:11
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản announced the results of the bid package Consulting, surveying, designing construction drawings - cost estimates .
- Winning bidder: BC & D JOINT STOCK COMPANY
30/08/2024 17:09
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản publishes Tender Notice Consulting, surveying, designing construction drawings - cost estimates in the form Open bidding .
19/07/2024 09:43
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản publishes the plan Approve the contractor selection plan for the construction design step packages implemented after the basic design of the project Dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district with 3 bidding package .
17/07/2024 10:41
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH CHẤT LƯỢNG CÔNG TRÌNH NAM ĐỊNH
11/07/2024 11:57
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản publishes the plan Approve the contractor selection plan for the construction design step packages implemented after the basic design of the project Dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district with 3 bidding package .
06/07/2024 11:22
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản announced the results of the bid package Consulting and supervising survey work to prepare a Feasibility Study Report for the project of dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district .
- Winning bidder: LOC VUONG CONSTRUCTION INVESTMENT AND CONSULTING COMPANY LIMITED
19/01/2024 14:42
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản announced the results of the bid package Consulting on surveying and preparing a feasibility study report for the project of dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district .
- Winning bidder: BC & D JOINT STOCK COMPANY
19/01/2024 14:39
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consulting on preparing Bidding Documents, evaluating Proposals for bidding packages: Consulting on surveys to prepare economic and technical reports; Consulting on preparing technical and economic reports. Project: Dredging and solidifying S25 canal in Vu Ban irrigation system of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: T.T.N CONSULTANT CONSTRUCTION COMPANY LIMITED
24/10/2024 16:42
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the request Plan for selecting survey consulting contractors and preparing technical and economic reports Dredging and solidifying S25 canal in Vu Ban irrigation system of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with 3 bidding package.
04/10/2024 14:54
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consultancy and supervision of surveying and construction drawing design of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: LOC VUONG CONSTRUCTION INVESTMENT AND CONSULTING COMPANY LIMITED
20/09/2024 10:11
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consulting, surveying, designing construction drawings - cost estimates of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: BC & D JOINT STOCK COMPANY
30/08/2024 17:09
Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản Posted Development Investment Project Dredging and solidifying C25 canal, N1 canal and a number of branch routes, Vu Ban district.
19/07/2024 14:14
Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted Tender Notice Consulting, surveying, designing construction drawings - cost estimates of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with the form Open bidding.
19/07/2024 09:43
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the request Approve the contractor selection plan for the construction design step packages implemented after the basic design of the project Dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with 3 bidding package.
17/07/2024 10:41
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ KIỂM ĐỊNH CHẤT LƯỢNG CÔNG TRÌNH NAM ĐỊNH
11/07/2024 11:57
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the request Approve the contractor selection plan for the construction design step packages implemented after the basic design of the project Dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản with 3 bidding package.
06/07/2024 11:22
The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted the results of the bidding package Consulting and supervising survey work to prepare a Feasibility Study Report for the project of dredging and solidifying C25 canal, N1 canal and some branch routes of Vu Ban district of the investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản.
- Winning bidder: LOC VUONG CONSTRUCTION INVESTMENT AND CONSULTING COMPANY LIMITED
19/01/2024 14:42
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted 6 of the contractor selection plan, which contains 12 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted 2 Tender Notice in the 2 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 8 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has a relationship with 12 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản has a relationship with 3 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản is the investor of 3 package, of which 1 package is self-invited, other units invite bid 2 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản is the owner of 7 contractor selection plan. In which, they self-invite 5 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản is an investor with 11 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Công ty TNHH một thành viên Khai thác công trình thủy lợi Vụ Bản is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code