Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT as follows:
- Has relationships with 5 project owners.
- Has relationships with 11 contractor.
- Announced 2 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 13 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 12 packages (with 13 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.89 contractors.
- Breakdown by bidding field: Goods 0%, Construction 92.31%, Consultancy 7.69%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT as follows:
- Has relationships with 11 contractor.
- The average number of contractors participating in each bidding package is: 1.89 contractors.
- Proportion of bidding fields: Goods 0%, Construction 92.31%, Consulting 7.69%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 2 contractor selection plans, of which 2 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 20 bidding packages, of which 11 were won, 3 were lost, 6 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 44% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 93.84% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Gia Lai (19), Undefined (1)
- Provinces before the merger where the contractor has participated in bidding : Bình Định (18), Undefined (2)
- Has relationships with 8 Bid Solicitors
- Has competed against 24 contractors in 13 bidding packages, won 5 packages, lost 3 packages, 5 are pending results, and 0 were canceled.
- Has collaborated with 7 contractors in 8 bidding packages, won 4 packages, lost 2 packages, 2 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 56 bidding packages with 12 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted the request The plan to select the contractor for the road to Nhon Hoa ward Stadium of the investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT with 1 bidding package.
31/07/2023 19:03
Investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted an investment and development project Expanding Nhon Tan Market.
31/07/2023 18:18
Investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted an investment and development project Road to Nhon Hoa Ward Stadium.
31/07/2023 18:18
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted the request Plan to select contractor for Nhon Tan Market Expansion project of the investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT with 1 bidding package.
31/07/2023 18:10
The data sheet has been partially hidden, to see the full information please Login or Register
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT publishes Tender Notice Construction costs in the form Open bidding .
06/08/2023 12:26
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT publishes the plan The plan to select the contractor for the road to Nhon Hoa ward Stadium with 1 bidding package .
31/07/2023 19:03
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT publishes the plan Plan to select contractor for Nhon Tan Market Expansion project with 1 bidding package .
31/07/2023 18:10
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT announced the results of the bidding package Construction costs with 1 participating contractors .
19/04/2022 09:09
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT publishes Tender Notice Construction costs in the form National Competitive Bidding .
11/04/2022 11:05
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT publishes the plan Dam Hao residential area in Ly Tay area with 1 bidding package .
11/04/2022 10:09
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT announced the results of the bidding package Construction supervision consulting services and equipment with 2 participating contractors .
04/03/2022 09:53
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT announced the results of the bidding package Construction costs with 1 participating contractors .
07/02/2022 10:39
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT publishes Tender Notice Construction costs in the form National Competitive Bidding .
22/01/2022 15:41
CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT publishes the plan Dam Hao residential area in Ly Tay area with 1 bidding package .
22/01/2022 14:16
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted the request The plan to select the contractor for the road to Nhon Hoa ward Stadium of the investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT with 1 bidding package.
31/07/2023 19:03
Investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted an investment and development project Expanding Nhon Tan Market.
31/07/2023 18:18
Investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted an investment and development project Road to Nhon Hoa Ward Stadium.
31/07/2023 18:18
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted the request Plan to select contractor for Nhon Tan Market Expansion project of the investor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT with 1 bidding package.
31/07/2023 18:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted 13 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has posted 13 Tender Notices in 12 bidding packages. Among these, 0 Tender Notices were self-invited, and 13 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has a relationship with 11 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has a relationship with 9 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity CÔNG TY TNHH TƯ VẤN XÂY DỰNG THIÊN PHÁT has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects