Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB as follows:
- Has relationships with 0 project owners.
- Has relationships with 14 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 10 packages (with 10 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.60 contractors.
- Breakdown by bidding field: Goods 20.00%, Construction 0%, Consultancy 30.00%, Non-consultancy 50.00%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 184,986,391,870 VND, of which the total winning bid value is: 184,505,303,455 VND.
- The savings rate is: 0.26%.
Data analysis results of DauThau.info software for bid solicitors CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 1.60 contractors.
- Proportion of bidding fields: Goods 20.00%, Construction 0%, Consulting 30.00%, Non-consulting 50.00%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 184,986,391,870 VND, in which the total winning value is: 184,505,303,455 VND.
- The savings rate is: 0.26%.
You need to Login or Sign up to view all informations.
- Participated in 85 bidding packages, of which 81 were won, 4 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 90.88% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.6% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Huế (79), (1), Undefined (5)
- Provinces before the merger where the contractor has participated in bidding : Huế (79), Undefined (6)
- Has relationships with 16 Bid Solicitors
- Has competed against 18 contractors in 9 bidding packages, won 5 packages, lost 4 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 1 contractors in 3 bidding packages, won 1 packages, lost 2 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 129 bidding packages with 8 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bid package Package 03: Construction supervision consultancy .
- Winning bidder: 719 CONSTRUCTION INVESTMENT CONSULTANCY COMPANY LIMITED
22/01/2025 15:48
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bid package Tender package No 02: Project Management Consulting .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG MIỀN TRUNG 232
22/01/2025 15:46
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bidding package Tender package No 02: Project Management Consulting with 2 participating contractors .
06/01/2025 09:44
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bidding package Package 03: Construction supervision consultancy with 2 participating contractors .
06/01/2025 09:43
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bid package Procurement of equipment under the project "Developing a training program for the Master's degree in Law and Policy on Climate Change" by the European Commission through the "Executive Agency for Education, Audiovisual and Culture (EACEA)” sponsorship .
- Winning bidder: VICTORY INSTRUMENT JOINT STOCK COMPANY
28/12/2024 11:49
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bid package Procurement of chemicals and equipment for component 5 of the project Cooperation in developing training and research programs between Hue University and Irish higher education institutions in Vietnam .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN HÓA CHẤT VÀ MÔI TRƯỜNG NHẬT ANH
28/12/2024 10:51
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bidding package Procurement of chemicals and equipment for component 5 of the project Cooperation in developing training and research programs between Hue University and Irish higher education institutions in Vietnam with 1 participating contractors .
26/12/2024 09:33
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB announced the results of the bidding package Procurement of equipment under the project "Developing a training program for the Master's degree in Law and Policy on Climate Change" by the European Commission through the "Executive Agency for Education, Audiovisual and Culture (EACEA)” sponsorship with 1 participating contractors .
25/12/2024 09:11
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB publishes Tender Notice Package 03: Construction supervision consultancy in the form Open bidding .
19/12/2024 14:15
CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB publishes Tender Notice Tender package No 02: Project Management Consulting in the form Open bidding .
19/12/2024 14:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB has posted 10 Tender Notices in 10 bidding packages. Among these, 0 Tender Notices were self-invited, and 10 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor CÔNG TY TNHH XÂY DỰNG THƯƠNG MẠI BB has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects