Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Cục Kỹ thuật Quân đoàn 2 as follows:
- Has relationships with 2 project owners.
- Has relationships with 1 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 6 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 2 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 25.00%, Construction 75.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,999,024,000 VND, of which the total winning bid value is: 299,685,800 VND.
- The savings rate is: 90.01%.
Data analysis results of DauThau.info software for bid solicitors Cục Kỹ thuật Quân đoàn 2 as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 25.00%, Construction 75.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,999,024,000 VND, in which the total winning value is: 299,685,800 VND.
- The savings rate is: 90.01%.
This Bid solicitor is also an investor. The analysis results of data for the investor Cục Kỹ thuật Quân đoàn 2 are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 4 contractor selection plans, of which 4 were self-published, and 0 were published by other entities.
- Is the investor of 2 Tender Notices, of which 2 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Construction and installation works of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
26/02/2019 16:49
Investor Cục Kỹ thuật Quân đoàn 2 has posted an investment and development project Refreshing tank house model 203 Tank Brigade.
26/02/2019 07:00
Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted Tender Notice No. 03 of the investor Cục Kỹ thuật Quân đoàn 2 with the form National competitive bidding.
23/09/2018 20:47
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Procurement of workshop equipment in 2018 of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
23/09/2018 20:35
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the results of the bidding package Construction and installation of Quality and Measurement Station/d51/Department of Engineering of the investor Cục Kỹ thuật Quân đoàn 2.
- Winning bidder: Công ty TNHH xây dựng và thương mại 376 Bắc Giang
27/07/2018 14:20
Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted Tender Notice Construction and installation of Metrology-Quality Station/d51/Department of Engineering of the investor Cục Kỹ thuật Quân đoàn 2 with the form National competitive bidding.
07/07/2018 17:45
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Selection of construction contractors: Consolidation and upgrading of measurement-quality station d51/Department of Engineering of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
07/07/2018 17:37
Investor Cục Kỹ thuật Quân đoàn 2 has posted an investment and development project Consolidate and upgrade the Quality-Measurement Station/d51/Department of Engineering.
07/07/2018 07:00
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Project contractor selection plan: Building a new warehouse for vehicles and artillery samples of Brigade PB164/Military 2 of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
04/06/2018 12:04
Investor Cục Kỹ thuật Quân đoàn 2 has posted an investment and development project Building a new warehouse for vehicles and artillery samples of Brigade PB164/2.
04/06/2018 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
Cục Kỹ thuật Quân đoàn 2 publishes Tender Notice Tender package No 05 construction and installation of garage items, loading houses in the form National competitive bidding .
04/12/2019 09:51
Cục Kỹ thuật Quân đoàn 2 publishes the plan The plan for selecting contractors for garage works e18/f325/qđ2 with 1 bidding package .
04/12/2019 08:54
Cục Kỹ thuật Quân đoàn 2 publishes the plan Construction and installation works with 1 bidding package .
26/02/2019 16:49
Cục Kỹ thuật Quân đoàn 2 publishes Tender Notice No. 03 in the form National competitive bidding .
23/09/2018 20:47
Cục Kỹ thuật Quân đoàn 2 publishes the plan Procurement of workshop equipment in 2018 with 1 bidding package .
23/09/2018 20:35
Cục Kỹ thuật Quân đoàn 2 announced the results of the bid package Construction and installation of Quality and Measurement Station/d51/Department of Engineering .
- Winning bidder: Công ty TNHH xây dựng và thương mại 376 Bắc Giang
27/07/2018 14:20
Cục Kỹ thuật Quân đoàn 2 publishes Tender Notice Construction and installation of Metrology-Quality Station/d51/Department of Engineering in the form National competitive bidding .
07/07/2018 17:45
Cục Kỹ thuật Quân đoàn 2 publishes the plan Selection of construction contractors: Consolidation and upgrading of measurement-quality station d51/Department of Engineering with 1 bidding package .
07/07/2018 17:37
Cục Kỹ thuật Quân đoàn 2 publishes Tender Notice Tender package No 04: Construction in the form National competitive bidding .
04/06/2018 14:56
Cục Kỹ thuật Quân đoàn 2 publishes the plan Contractor selection plan with 1 bidding package .
04/06/2018 14:48
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Construction and installation works of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
26/02/2019 16:49
Investor Cục Kỹ thuật Quân đoàn 2 has posted an investment and development project Refreshing tank house model 203 Tank Brigade.
26/02/2019 07:00
Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted Tender Notice No. 03 of the investor Cục Kỹ thuật Quân đoàn 2 with the form National competitive bidding.
23/09/2018 20:47
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Procurement of workshop equipment in 2018 of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
23/09/2018 20:35
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the results of the bidding package Construction and installation of Quality and Measurement Station/d51/Department of Engineering of the investor Cục Kỹ thuật Quân đoàn 2.
- Winning bidder: Công ty TNHH xây dựng và thương mại 376 Bắc Giang
27/07/2018 14:20
Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted Tender Notice Construction and installation of Metrology-Quality Station/d51/Department of Engineering of the investor Cục Kỹ thuật Quân đoàn 2 with the form National competitive bidding.
07/07/2018 17:45
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Selection of construction contractors: Consolidation and upgrading of measurement-quality station d51/Department of Engineering of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
07/07/2018 17:37
Investor Cục Kỹ thuật Quân đoàn 2 has posted an investment and development project Consolidate and upgrade the Quality-Measurement Station/d51/Department of Engineering.
07/07/2018 07:00
The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted the request Project contractor selection plan: Building a new warehouse for vehicles and artillery samples of Brigade PB164/Military 2 of the investor Cục Kỹ thuật Quân đoàn 2 with 1 bidding package.
04/06/2018 12:04
Investor Cục Kỹ thuật Quân đoàn 2 has posted an investment and development project Building a new warehouse for vehicles and artillery samples of Brigade PB164/2.
04/06/2018 07:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Cục Kỹ thuật Quân đoàn 2 has posted 6 of the contractor selection plan, which contains 6 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted 4 Tender Notices in 4 bidding packages. Among these, 2 Tender Notices were self-invited, and 2 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Cục Kỹ thuật Quân đoàn 2 has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Cục Kỹ thuật Quân đoàn 2 has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects