Data analysis results of DauThau.info software for bid solicitors EVNGENCO 3 POWER SERVICE COMPANY as follows:
- Has relationships with 1 project owners.
- Has relationships with 443 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 341 contractor selection plans with a total of 473 bidding packages, of which 341 prequalification documents have not found the investment project.
- Has invited bids for 437 packages (with 455 tender notices), and conducted prequalification for 0 packages.
- There are 28 bidding packages with content that needs clarification.
- Announced the results of 417 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 35 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 57 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.46 contractors.
- Breakdown by bidding field: Goods 56.26%, Construction 0.22%, Consultancy 0.66%, Non-consultancy 42.86%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,678,360,733,199 VND, of which the total winning bid value is: 1,516,902,004,196 VND.
- The savings rate is: 9.62%.
Data analysis results of DauThau.info software for bid solicitors EVNGENCO 3 POWER SERVICE COMPANY as follows:
- Has relationships with 443 contractor.
- The average number of contractors participating in each bidding package is: 2.46 contractors.
- Proportion of bidding fields: Goods 56.26%, Construction 0.22%, Consulting 0.66%, Non-consulting 42.86%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,678,360,733,199 VND, in which the total winning value is: 1,516,902,004,196 VND.
- The savings rate is: 9.62%.
This Bid solicitor is also an investor. The analysis results of data for the investor EVNGENCO 3 POWER SERVICE COMPANY are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 348 contractor selection plans, of which 295 were self-published, and 53 were published by other entities.
- Is the investor of 517 Tender Notices, of which 455 were self-invited, and 62 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing simple repair and maintenance services for coal grab system equipment, pile breakers and mobile pile breakers at Vinh Tan 2 Thermal Power Plant .
01/01/2026 00:04
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing simple repair and maintenance services for bunker system equipment and coal feeding machines at Vinh Tan 2 Thermal Power Plant .
- Winning bidder: GENERAL TRADING SERVICE VIET EQUIPMENT CO.,LTD
01/01/2026 00:03
EVNGENCO 3 POWER SERVICE COMPANY publishes Tender Notice Providing valve checking machines to serve the Company's repair work in the form Competitive Offer .
31/12/2025 16:18
EVNGENCO 3 POWER SERVICE COMPANY publishes Tender Notice Providing hydrogen insertion processing materials for the generator of Vinh Tan 2 Thermal Power Plant in the form Competitive Offer .
31/12/2025 15:29
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Provide car rental service to pick up employees on business trips and special -use vehicles to serve the company's work .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ PHÚC KHANG
30/12/2025 18:38
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Package 3: Providing alternative materials for the overhaul of the GT21 PM2.1 (phase 2) .
- Winning bidder: KVA ENGINEERING SERVICES JOINT STOCK COMPANY
30/12/2025 18:26
EVNGENCO 3 POWER SERVICE COMPANY publishes the plan Providing valve checking machines to serve the Company's repair work with 1 bidding package .
30/12/2025 14:15
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing consumable materials for the overhaul of GT21 PM2.1 unit .
- Winning bidder: VINA AUTOMATION TECHNOLOGIESCOMPANY LTD
30/12/2025 08:18
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Provide camp service for the work of overhauling the GT12 PM1 .
- Winning bidder: THANH VAN TECHNOLOGY TRADING BUILDING COMPANY LIMITED
30/12/2025 08:11
EVNGENCO 3 POWER SERVICE COMPANY publishes the plan KHLCNT Contract package: Providing technical design software copyright for units within EPS Company with 1 bidding package .
28/12/2025 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Bidding package: Provides labor for the work of S1 Vinh Tan 4 .
- Winning bidder: CÔNG TY CỔ PHẦN TÂN THÀNH NAM, CÔNG TY TNHH NHẬT QUANG
03/10/2025 16:27
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing specialized car rental services for the repair work of the company and shuttle shuttle staff in Phu My, Vinh Tan .
- Winning bidder: VIET NAM GLOBAL TRANSPORT CORPORATION
01/10/2025 17:03
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Labor protection equipment for employees in 2025 .
- Winning bidder: NHAT TAN ANH JOINT STOCK COMPANY
26/09/2025 16:37
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Package 1: Supplying machinery and equipment for the repair work of the company .
- Winning bidder: NHAT DUY TECHNOLOGY COMPANY LIMITED, CÔNG TY CỔ PHẦN CÔNG NGHỆ NĂNG LƯỢNG AT
03/09/2025 14:18
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Supply and install attic solar power system for the port office building of EPS Company in Vinh Tan 2nd IMP .
- Winning bidder: PAT TECHNOLOGY COMPANY LIMITED
31/08/2025 14:07
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing professional liability insurance and third -party liability insurance .
- Winning bidder: military insurance corporation, BAO MINH INSURANCE CORPORATION, Công ty cổ phần Tập đoàn bảo hiểm DBV, BAO LONG INSURANCE CORPORATION
30/08/2025 23:12
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Bidding package 1: Providing hydraulic equipment and rubber vulcanization for repair at NMN VT4 .
- Winning bidder: DONG TAY TRADING AND INVESTMENT CORPORATION, HOANG LINH INDUSTRIAL EQUIPMENT SERVICE JOINT STOCK COMPANY
29/08/2025 10:04
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Supplying materials for the restoration of cuhat 2 -end cupling sets of coal crusher of Vinh Tan 2 .
- Winning bidder: SOUNDTON INDUSTRY JOINT STOCK COMPANY
29/08/2025 08:05
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Package 3: Providing cleaning and handling services for repairing at Mong Duong Awar 1 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ PHÚC KHANG, LILAMA 69-1 PHALAI JOINT STOCK COMPANY
28/08/2025 13:47
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Package 2: Provide services of removing, installing, repairing insulation, corrugated iron for repair at Mong Duong Agriculture 1 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ PHÚC KHANG
28/08/2025 10:45
The data sheet has been partially hidden, to see the full information please Login or Register
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing simple repair and maintenance services for coal grab system equipment, pile breakers and mobile pile breakers at Vinh Tan 2 Thermal Power Plant .
01/01/2026 00:04
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing simple repair and maintenance services for bunker system equipment and coal feeding machines at Vinh Tan 2 Thermal Power Plant .
- Winning bidder: GENERAL TRADING SERVICE VIET EQUIPMENT CO.,LTD
01/01/2026 00:03
EVNGENCO 3 POWER SERVICE COMPANY publishes Tender Notice Providing valve checking machines to serve the Company's repair work in the form Competitive Offer .
31/12/2025 16:18
EVNGENCO 3 POWER SERVICE COMPANY publishes Tender Notice Providing hydrogen insertion processing materials for the generator of Vinh Tan 2 Thermal Power Plant in the form Competitive Offer .
31/12/2025 15:29
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Provide car rental service to pick up employees on business trips and special -use vehicles to serve the company's work .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ PHÚC KHANG
30/12/2025 18:38
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Package 3: Providing alternative materials for the overhaul of the GT21 PM2.1 (phase 2) .
- Winning bidder: KVA ENGINEERING SERVICES JOINT STOCK COMPANY
30/12/2025 18:26
EVNGENCO 3 POWER SERVICE COMPANY publishes the plan Providing valve checking machines to serve the Company's repair work with 1 bidding package .
30/12/2025 14:15
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Providing consumable materials for the overhaul of GT21 PM2.1 unit .
- Winning bidder: VINA AUTOMATION TECHNOLOGIESCOMPANY LTD
30/12/2025 08:18
EVNGENCO 3 POWER SERVICE COMPANY announced the results of the bid package Provide camp service for the work of overhauling the GT12 PM1 .
- Winning bidder: THANH VAN TECHNOLOGY TRADING BUILDING COMPANY LIMITED
30/12/2025 08:11
EVNGENCO 3 POWER SERVICE COMPANY publishes the plan KHLCNT Contract package: Providing technical design software copyright for units within EPS Company with 1 bidding package .
28/12/2025 15:12
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s EVNGENCO 3 POWER SERVICE COMPANY has posted 341 of the contractor selection plan, which contains 473 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor EVNGENCO 3 POWER SERVICE COMPANY has posted 455 Tender Notices in 437 bidding packages. Among these, 455 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor EVNGENCO 3 POWER SERVICE COMPANY has posted 417 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 417 package, canceled the bid 0 package (among the bidding packages above).
- There are 35 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor EVNGENCO 3 POWER SERVICE COMPANY has a relationship with 443 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity EVNGENCO 3 POWER SERVICE COMPANY has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects