Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors First Hotel as follows:
- Has relationships with 15 contractor.
- Announced 6 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 15 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 10 packages that have not fully posted the contractor selection results. Of these 10 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.57 contractors.
- Breakdown by bidding field: Goods 71.43%, Construction 28.57%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 7,748,324,943 VND, of which the total winning bid value is: 7,285,464,560 VND.
- The savings rate is: 5.97%.
Data analysis results of DauThau.info software for bid solicitors First Hotel as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 2.57 contractors.
- Proportion of bidding fields: Goods 71.43%, Construction 28.57%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 7,748,324,943 VND, in which the total winning value is: 7,285,464,560 VND.
- The savings rate is: 5.97%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 6 investment and development projects.
- As the owner of 3 Contractor selection plan in which 2 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 8 bidding packages in which 7 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor First Hotel has posted the request KHLCNT Procurement of uniforms for officers and employees in 2024 at De Nhat Hotel of the investor First Hotel with 1 bidding package.
12/08/2024 09:33
The Bid solicitor First Hotel has posted the results of the bidding package Providing liquidation services in the form of destroying prize-winning electronic game machines. of the investor First Hotel.
- Winning bidder: VIETNAM - AUSTRALIA ENVIRONMENT JOINT STOCK COMPANY
03/08/2024 16:06
The Bid solicitor First Hotel has posted the request KHLCNT Provides liquidation services in the form of destroying prize-winning electronic game machines. of the investor First Hotel with 1 bidding package.
25/07/2024 17:04
The Bid solicitor First Hotel has posted the results of the bidding package Supply and installation of air conditioning equipment of the investor First Hotel.
- Winning bidder: CÔNG TY TNHH ĐIỆN LẠNH NGUYỄN HOÀNG THANH
04/10/2023 14:48
Bid solicitor First Hotel has posted Tender Notice Supply and installation of air conditioning equipment of the investor First Hotel with the form Competitive Offer.
04/08/2023 09:01
The Bid solicitor First Hotel has posted the results of the bidding package Interior watercolor paint of the investor First Hotel.
- Winning bidder: KIEN LONG INTERIOR DECORATION AND INVESTMENT CONSTRUCTION COMPANY LIMITED
03/08/2023 09:20
The Bid solicitor First Hotel has posted the results of the bidding package exterior water paint of the investor First Hotel.
- Winning bidder: KIEN LONG INTERIOR DECORATION AND INVESTMENT CONSTRUCTION COMPANY LIMITED
01/08/2023 14:56
The Bid solicitor First Hotel has posted the results of the bidding package Supply and installation of equipment of the investor First Hotel.
- Winning bidder: PNCO DEVELOPMENT INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/07/2023 14:02
Bid solicitor First Hotel has posted Tender Notice Supply and installation of equipment of the investor First Hotel with the form Shortened competitive offer.
19/06/2023 11:34
Bid solicitor First Hotel has posted Tender Notice Interior watercolor paint of the investor First Hotel with the form Shortened competitive offer.
15/06/2023 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
First Hotel publishes the plan KHLCNT Procurement of uniforms for officers and employees in 2024 at De Nhat Hotel with 1 bidding package .
12/08/2024 09:33
First Hotel announced the results of the bid package Providing liquidation services in the form of destroying prize-winning electronic game machines. .
- Winning bidder: VIETNAM - AUSTRALIA ENVIRONMENT JOINT STOCK COMPANY
03/08/2024 16:06
First Hotel publishes the plan KHLCNT Provides liquidation services in the form of destroying prize-winning electronic game machines. with 1 bidding package .
25/07/2024 17:04
First Hotel announced the results of the bid package Supply and installation of air conditioning equipment .
- Winning bidder: CÔNG TY TNHH ĐIỆN LẠNH NGUYỄN HOÀNG THANH
04/10/2023 14:48
First Hotel announced the results of the bidding package Supply and installation of air conditioning equipment with 4 participating contractors .
12/08/2023 08:30
First Hotel publishes Tender Notice Supply and installation of air conditioning equipment in the form Competitive Offer .
04/08/2023 09:01
First Hotel announced the results of the bid package Interior watercolor paint .
- Winning bidder: KIEN LONG INTERIOR DECORATION AND INVESTMENT CONSTRUCTION COMPANY LIMITED
03/08/2023 09:20
First Hotel announced the results of the bid package exterior water paint .
- Winning bidder: KIEN LONG INTERIOR DECORATION AND INVESTMENT CONSTRUCTION COMPANY LIMITED
01/08/2023 14:56
First Hotel announced the results of the bid package Supply and installation of equipment .
- Winning bidder: PNCO DEVELOPMENT INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/07/2023 14:02
First Hotel announced the results of the bidding package Supply and installation of equipment with 3 participating contractors .
22/06/2023 09:25
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor First Hotel has posted the request KHLCNT Procurement of uniforms for officers and employees in 2024 at De Nhat Hotel of the investor First Hotel with 1 bidding package.
12/08/2024 09:33
The Bid solicitor First Hotel has posted the results of the bidding package Providing liquidation services in the form of destroying prize-winning electronic game machines. of the investor First Hotel.
- Winning bidder: VIETNAM - AUSTRALIA ENVIRONMENT JOINT STOCK COMPANY
03/08/2024 16:06
The Bid solicitor First Hotel has posted the request KHLCNT Provides liquidation services in the form of destroying prize-winning electronic game machines. of the investor First Hotel with 1 bidding package.
25/07/2024 17:04
The Bid solicitor First Hotel has posted the results of the bidding package Supply and installation of air conditioning equipment of the investor First Hotel.
- Winning bidder: CÔNG TY TNHH ĐIỆN LẠNH NGUYỄN HOÀNG THANH
04/10/2023 14:48
Bid solicitor First Hotel has posted Tender Notice Supply and installation of air conditioning equipment of the investor First Hotel with the form Competitive Offer.
04/08/2023 09:01
The Bid solicitor First Hotel has posted the results of the bidding package Interior watercolor paint of the investor First Hotel.
- Winning bidder: KIEN LONG INTERIOR DECORATION AND INVESTMENT CONSTRUCTION COMPANY LIMITED
03/08/2023 09:20
The Bid solicitor First Hotel has posted the results of the bidding package exterior water paint of the investor First Hotel.
- Winning bidder: KIEN LONG INTERIOR DECORATION AND INVESTMENT CONSTRUCTION COMPANY LIMITED
01/08/2023 14:56
The Bid solicitor First Hotel has posted the results of the bidding package Supply and installation of equipment of the investor First Hotel.
- Winning bidder: PNCO DEVELOPMENT INVESTMENT CONSULTANT JOINT STOCK COMPANY
25/07/2023 14:02
Bid solicitor First Hotel has posted Tender Notice Supply and installation of equipment of the investor First Hotel with the form Shortened competitive offer.
19/06/2023 11:34
Bid solicitor First Hotel has posted Tender Notice Interior watercolor paint of the investor First Hotel with the form Shortened competitive offer.
15/06/2023 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s First Hotel has posted 4 of the contractor selection plan, which contains 15 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor First Hotel has posted 7 Tender Notice in the 7 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor First Hotel has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor First Hotel has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor First Hotel has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor First Hotel is the investor of 8 package, of which 7 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor First Hotel is the owner of 3 contractor selection plan. In which, they self-invite 2 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor First Hotel is an investor with 18 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor First Hotel is the investor of 6 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code