Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Hạt đường bộ Nam Sách as follows:
- Has relationships with 3 contractor.
- Announced 8 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 45 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 31 packages that have not fully posted the contractor selection results. Of these 30 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 660,153,000 VND, of which the total winning bid value is: 660,153,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Hạt đường bộ Nam Sách as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 660,153,000 VND, in which the total winning value is: 660,153,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 8 investment and development projects.
- As the owner of 7 Contractor selection plan in which 7 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 6 bidding packages in which 0 packages are self-invited, and 6 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting DH17 and 5B roads to ensure traffic safety. of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
19/10/2024 17:35
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with DH17 and 5B roads to ensure traffic safety. of the investor Hạt đường bộ Nam Sách with 1 bidding package.
19/10/2024 17:31
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Plant new Km column and H column of route 5B to facilitate management of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
09/10/2024 16:41
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Newly planted Km column and H column of route 5B to facilitate management of the investor Hạt đường bộ Nam Sách with 1 bidding package.
09/10/2024 16:38
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Additional planting, replacement of road signs and speed bumps, painting of speed bumps at road ends in the village intersecting with Nam Sach town road to An Chau to ensure traffic safety of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
22/08/2024 10:04
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Plant additional, replace road signs and make speed bumps, paint speed bumps at road ends in the village intersecting with Nam Sach town road to An Chau to ensure traffic safety of the investor Hạt đường bộ Nam Sách with 1 bidding package.
22/08/2024 10:02
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with road 5B to ensure traffic safety of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
07/06/2024 18:11
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with road 5B to ensure traffic safety. of the investor Hạt đường bộ Nam Sách with 1 bidding package.
07/06/2024 18:02
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construct the construction of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
26/10/2023 09:25
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Repaint the road centerline and road markings from Highway 37 to the end of Dong Thon village and the North-South axis next to the lake in Thanh Quang - Quoc Tuan urban area of the investor Hạt đường bộ Nam Sách with 1 bidding package.
26/10/2023 09:21
The data sheet has been partially hidden, to see the full information please Login or Register
Hạt đường bộ Nam Sách announced the results of the bid package Construction work: Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting DH17 and 5B roads to ensure traffic safety. .
- Winning bidder: Công ty TNHH hạ tầng VH
19/10/2024 17:35
Hạt đường bộ Nam Sách publishes the plan Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with DH17 and 5B roads to ensure traffic safety. with 1 bidding package .
19/10/2024 17:31
Hạt đường bộ Nam Sách announced the results of the bid package Construction work: Plant new Km column and H column of route 5B to facilitate management .
- Winning bidder: Công ty TNHH hạ tầng VH
09/10/2024 16:41
Hạt đường bộ Nam Sách publishes the plan Newly planted Km column and H column of route 5B to facilitate management with 1 bidding package .
09/10/2024 16:38
Hạt đường bộ Nam Sách announced the results of the bid package Construction work: Additional planting, replacement of road signs and speed bumps, painting of speed bumps at road ends in the village intersecting with Nam Sach town road to An Chau to ensure traffic safety .
- Winning bidder: Công ty TNHH hạ tầng VH
22/08/2024 10:04
Hạt đường bộ Nam Sách publishes the plan Plant additional, replace road signs and make speed bumps, paint speed bumps at road ends in the village intersecting with Nam Sach town road to An Chau to ensure traffic safety with 1 bidding package .
22/08/2024 10:02
Hạt đường bộ Nam Sách announced the results of the bid package Construction work: Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with road 5B to ensure traffic safety .
- Winning bidder: Công ty TNHH hạ tầng VH
07/06/2024 18:11
Hạt đường bộ Nam Sách publishes the plan Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with road 5B to ensure traffic safety. with 1 bidding package .
07/06/2024 18:02
Hạt đường bộ Nam Sách announced the results of the bid package Construct the construction .
- Winning bidder: Công ty TNHH hạ tầng VH
26/10/2023 09:25
Hạt đường bộ Nam Sách publishes the plan Repaint the road centerline and road markings from Highway 37 to the end of Dong Thon village and the North-South axis next to the lake in Thanh Quang - Quoc Tuan urban area with 1 bidding package .
26/10/2023 09:21
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting DH17 and 5B roads to ensure traffic safety. of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
19/10/2024 17:35
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with DH17 and 5B roads to ensure traffic safety. of the investor Hạt đường bộ Nam Sách with 1 bidding package.
19/10/2024 17:31
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Plant new Km column and H column of route 5B to facilitate management of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
09/10/2024 16:41
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Newly planted Km column and H column of route 5B to facilitate management of the investor Hạt đường bộ Nam Sách with 1 bidding package.
09/10/2024 16:38
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Additional planting, replacement of road signs and speed bumps, painting of speed bumps at road ends in the village intersecting with Nam Sach town road to An Chau to ensure traffic safety of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
22/08/2024 10:04
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Plant additional, replace road signs and make speed bumps, paint speed bumps at road ends in the village intersecting with Nam Sach town road to An Chau to ensure traffic safety of the investor Hạt đường bộ Nam Sách with 1 bidding package.
22/08/2024 10:02
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construction work: Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with road 5B to ensure traffic safety of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
07/06/2024 18:11
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Build speed bumps, paint speed bumps and plant additional road signs at the ends of roads in the village intersecting with road 5B to ensure traffic safety. of the investor Hạt đường bộ Nam Sách with 1 bidding package.
07/06/2024 18:02
The Bid solicitor Hạt đường bộ Nam Sách has posted the results of the bidding package Construct the construction of the investor Hạt đường bộ Nam Sách.
- Winning bidder: Công ty TNHH hạ tầng VH
26/10/2023 09:25
The Bid solicitor Hạt đường bộ Nam Sách has posted the request Repaint the road centerline and road markings from Highway 37 to the end of Dong Thon village and the North-South axis next to the lake in Thanh Quang - Quoc Tuan urban area of the investor Hạt đường bộ Nam Sách with 1 bidding package.
26/10/2023 09:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Hạt đường bộ Nam Sách has posted 13 of the contractor selection plan, which contains 45 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hạt đường bộ Nam Sách has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Hạt đường bộ Nam Sách has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hạt đường bộ Nam Sách has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hạt đường bộ Nam Sách is the owner of 7 contractor selection plan. In which, they self-invite 7 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Hạt đường bộ Nam Sách is an investor with 6 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Hạt đường bộ Nam Sách is the investor of 8 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code