Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Hạt Kiểm lâm thị xã Hương Trà as follows:
- Has relationships with 1 project owners.
- Has relationships with 12 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 15 bidding packages, of which 6 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 8 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 100.00%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 292,077,780 VND, of which the total winning bid value is: 288,171,000 VND.
- The savings rate is: 1.34%.
Data analysis results of DauThau.info software for bid solicitors Hạt Kiểm lâm thị xã Hương Trà as follows:
- Has relationships with 12 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 292,077,780 VND, in which the total winning value is: 288,171,000 VND.
- The savings rate is: 1.34%.
This Bid solicitor is also an investor. The analysis results of data for the investor Hạt Kiểm lâm thị xã Hương Trà are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 13 contractor selection plans, of which 7 were self-published, and 6 were published by other entities.
- Is the investor of 4 Tender Notices, of which 1 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Bidding package No. 1: Procurement of assets and tools for fire prevention and fighting work, including: Handheld blower; Long-handled machete and fire extinguisher .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN HOÀNG KIM
24/12/2025 14:37
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package No. 2: Procurement of assets for fire prevention and fighting work including: DJI Air 3S drone (DJI RC-N3), model CZ3SCL, remote RC151; UHS-I uSD memory card (MicroSD) card V30 - Catalyst - 512GB brand Exascend, model: EX512GUSDU1; Portable hard drive (EXTERNAL SSD) Lexar SL500 Portable SSD 4TB, up to 2000MB/s read, up to 1800MB/s write, USB 3.2 Gen 2x2 Type-C(LSL500X004T-RNBNG); Lexar Professional SD USB 3.2 Gen 2 memory card reader .
- Winning bidder: DSLR DA NANG COMPANY LIMITED
23/12/2025 15:07
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Category: Purchasing assets and tools for fire prevention and fighting. Funding source: Sustainable forestry development program in 2025. Unit: North River Huong Forest Ranger District with 2 bidding package .
23/12/2025 14:59
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package 5: Full construction cost .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN VÀ XÂY DỰNG KT
09/09/2025 15:34
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package No. 4: Construction supervision consultancy .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN XÂY DỰNG BL
09/09/2025 15:31
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package 3: Project management consultancy .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN XÂY DỰNG NÔNG NGHIỆP
09/09/2025 15:27
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Contractor selection plan: Repairing Binh Dien Forest Protection Station (painting house, repairing water supply and drainage roads) with 3 bidding package .
09/09/2025 15:24
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package 2: Consulting on verifying the design records of BVTC and construction estimates .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN XÂY DỰNG PHP 186
09/09/2025 14:51
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Bidding package No. 1: Consulting on making technical and technical reports - Construction investment .
- Winning bidder: Consultancy Design And Construction New House Company Limited
09/09/2025 14:47
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Plan for contractor selection phase of investment preparation: Repairing Binh Dien Forest Protection Station (painting house, repairing water supply and drainage roads) with 2 bidding package .
09/09/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Contractor selection plan Estimate for procurement of equipment to serve the operations of the Huong Tra Town Ranger District in 2024 with 3 bidding package .
27/09/2024 15:21
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Contractor selection plan: Repairing the office of the Forest Ranger Department in Huong Tra town with 5 bidding package .
19/08/2024 10:25
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Procurement of tools for forest protection and fire prevention and fighting work with 1 bidding package .
24/12/2023 22:35
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Repair Ford Ranger cars with 1 bidding package .
06/10/2023 22:02
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Furniture shopping Filing cabinets, round tables and wooden beds .
- Winning bidder: Công ty TNHH MTV Thương Mại và Dịch vụ Sang Trọng
22/09/2023 22:55
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Buy solar panels .
- Winning bidder: Công ty cổ phần đầu tư Bách Anh Group
22/09/2023 22:44
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Procurement of materials for raft mooring ropes .
- Winning bidder: Cửa hàng tổng hợp Trương Thị Hà
22/09/2023 22:38
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Procurement of information technology equipment, air conditioning equipment and Camera system .
- Winning bidder: Trung tâm máy tính và thiết bị văn phòng Ngọc Vinh Computer
12/09/2023 22:52
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Procurement of furniture and supplies for Offices and Stations in 2023 with 3 bidding package .
12/09/2023 22:16
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Procurement of information technology equipment, air conditioning equipment and Camera system with 1 bidding package .
29/08/2023 23:40
The data sheet has been partially hidden, to see the full information please Login or Register
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Bidding package No. 1: Procurement of assets and tools for fire prevention and fighting work, including: Handheld blower; Long-handled machete and fire extinguisher .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN HOÀNG KIM
24/12/2025 14:37
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package No. 2: Procurement of assets for fire prevention and fighting work including: DJI Air 3S drone (DJI RC-N3), model CZ3SCL, remote RC151; UHS-I uSD memory card (MicroSD) card V30 - Catalyst - 512GB brand Exascend, model: EX512GUSDU1; Portable hard drive (EXTERNAL SSD) Lexar SL500 Portable SSD 4TB, up to 2000MB/s read, up to 1800MB/s write, USB 3.2 Gen 2x2 Type-C(LSL500X004T-RNBNG); Lexar Professional SD USB 3.2 Gen 2 memory card reader .
- Winning bidder: DSLR DA NANG COMPANY LIMITED
23/12/2025 15:07
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Category: Purchasing assets and tools for fire prevention and fighting. Funding source: Sustainable forestry development program in 2025. Unit: North River Huong Forest Ranger District with 2 bidding package .
23/12/2025 14:59
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package 5: Full construction cost .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN VÀ XÂY DỰNG KT
09/09/2025 15:34
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package No. 4: Construction supervision consultancy .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN XÂY DỰNG BL
09/09/2025 15:31
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package 3: Project management consultancy .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN TƯ VẤN XÂY DỰNG NÔNG NGHIỆP
09/09/2025 15:27
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Contractor selection plan: Repairing Binh Dien Forest Protection Station (painting house, repairing water supply and drainage roads) with 3 bidding package .
09/09/2025 15:24
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Package 2: Consulting on verifying the design records of BVTC and construction estimates .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN XÂY DỰNG PHP 186
09/09/2025 14:51
Hạt Kiểm lâm thị xã Hương Trà announced the results of the bid package Bidding package No. 1: Consulting on making technical and technical reports - Construction investment .
- Winning bidder: Consultancy Design And Construction New House Company Limited
09/09/2025 14:47
Hạt Kiểm lâm thị xã Hương Trà publishes the plan Plan for contractor selection phase of investment preparation: Repairing Binh Dien Forest Protection Station (painting house, repairing water supply and drainage roads) with 2 bidding package .
09/09/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Hạt Kiểm lâm thị xã Hương Trà has posted 7 of the contractor selection plan, which contains 15 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Hạt Kiểm lâm thị xã Hương Trà has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Hạt Kiểm lâm thị xã Hương Trà has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Hạt Kiểm lâm thị xã Hương Trà has a relationship with 12 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Hạt Kiểm lâm thị xã Hương Trà has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects