Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Kho 700/ CHCHQ as follows:
- Has relationships with 1 project owners.
- Has relationships with 28 contractor.
- Announced 6 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 22 contractor selection plans with a total of 28 bidding packages, of which 17 prequalification documents have not found the investment project.
- Has invited bids for 15 packages (with 16 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 24 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 4 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.43 contractors.
- Breakdown by bidding field: Goods 50.00%, Construction 50.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,405,604,396 VND, of which the total winning bid value is: 5,168,273,172 VND.
- The savings rate is: 4.39%.
Data analysis results of DauThau.info software for bid solicitors Kho 700/ CHCHQ as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 1.43 contractors.
- Proportion of bidding fields: Goods 50.00%, Construction 50.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,405,604,396 VND, in which the total winning value is: 5,168,273,172 VND.
- The savings rate is: 4.39%.
This Bid solicitor is also an investor. The analysis results of data for the investor Kho 700/ CHCHQ are as follows:
- Is the investor of 6 development investment projects.
- Is the investor of 37 contractor selection plans, of which 21 were self-published, and 16 were published by other entities.
- Is the investor of 16 Tender Notices, of which 16 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Kho 700/ CHCHQ announced the results of the bid package Measure, draw and prepare documents to hand over Military family areas to local management .
- Winning bidder: HAIPHONG CONSTRUCTION DESIGN AND CONSULTANT JOINT STOCK COMPANY
01/12/2025 09:06
Kho 700/ CHCHQ announced the results of the bid package Procurement of materials to ensure technical work in the motorbike rescue industry in 2025 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ THIẾT BỊ PHƯƠNG HƯNG
17/11/2025 15:41
Kho 700/ CHCHQ announced the results of the bid package Purchasing supplies, goods, electrical and water equipment, renewing the yard lighting system, repairing and replacing the camera system .
- Winning bidder: HỘ KINH DOANH ĐÀO THỊ THANH XUÂN
12/11/2025 13:27
Kho 700/ CHCHQ publishes the plan Procurement of materials to ensure technical work in the rescue and motorbike industry in 2025 with 1 bidding package .
10/11/2025 19:29
Kho 700/ CHCHQ announced the results of the bid package Procurement of materials and goods to serve military training management in 2025 .
- Winning bidder: HỘ KINH DOANH VŨ THỊ LUYẾN 1981
10/11/2025 19:22
Kho 700/ CHCHQ announced the results of the bid package Procurement of materials and goods for preservation and repair of warehouses in 2025 .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
10/11/2025 19:18
Kho 700/ CHCHQ publishes the plan Purchasing supplies, goods, electrical and water equipment, renewing the yard lighting system, repairing and replacing the camera system with 1 bidding package .
05/11/2025 12:11
Kho 700/ CHCHQ publishes the plan Procurement of materials and goods to serve military training management in 2025 with 1 bidding package .
05/11/2025 12:01
Kho 700/ CHCHQ publishes the plan Procurement of materials and goods for preservation and repair of warehouses in 2025 with 1 bidding package .
05/11/2025 11:56
Kho 700/ CHCHQ announced the results of the bid package Procurement of supplies and equipment to ensure training for the CHCN industry in 2025 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ THIẾT BỊ PHƯƠNG HƯNG
02/11/2025 08:46
The data sheet has been partially hidden, to see the full information please Login or Register
Kho 700/ CHCHQ announced the results of the bid package Procurement of anti -leak repair materials K1, K2, buy sunscreen curtains, duty houses, hope to guard the warehouse area .
- Winning bidder: MIEN BAC TRADING AND CONSTRUCTION DEVELOPMENT JOINT STOCK COMPANY
24/06/2025 21:19
Kho 700/ CHCHQ publishes the plan Procurement of repair and leaking materials K1, K2 and buy sunscreen, work, duty houses, hope with 1 bidding package .
18/06/2025 19:14
Kho 700/ CHCHQ announced the results of the bid package Shopping for repair materials, replacing the unit's electricity and water system .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
09/06/2025 11:31
Kho 700/ CHCHQ publishes the plan Shopping for repair materials, replacing the unit's electricity and water system with 1 bidding package .
03/06/2025 08:43
Kho 700/ CHCHQ announced the results of the bid package Procurement of goods and supplies for professional training in the second quarter of 2025 .
- Winning bidder: HỘ KINH DOANH TRẦN MẠNH TOÀN
23/05/2025 10:01
Kho 700/ CHCHQ publishes the plan Procurement of goods and supplies for professional training in the second quarter of 2025 with 1 bidding package .
20/05/2025 22:16
Kho 700/ CHCHQ publishes the plan Shopping for equipment and tools in 2025 with 1 bidding package .
20/05/2025 21:47
Kho 700/ CHCHQ announced the results of the bid package Package 04: Independent audit .
- Winning bidder: THANG LONG AUDITING SERVICE AND INVESMENT CONSULT COMPANY LIMITED
16/12/2024 11:02
Kho 700/ CHCHQ announced the results of the bid package Package 03: Construction supervision .
- Winning bidder: SON THACH TRADING AND CONSTRUCTION COMPANY LIMITED
16/12/2024 10:57
Kho 700/ CHCHQ announced the results of the bid package Package No. 02: Consulting on appraisal of bidding documents and construction and installation bidding package .
- Winning bidder: BIEN DONG TRANSPORTATION AND CONSTRUCTION CONSULTANTS COMPANY LIMITED
16/12/2024 10:54
The data sheet has been partially hidden, to see the full information please Login or Register
Kho 700/ CHCHQ announced the results of the bid package Measure, draw and prepare documents to hand over Military family areas to local management .
- Winning bidder: HAIPHONG CONSTRUCTION DESIGN AND CONSULTANT JOINT STOCK COMPANY
01/12/2025 09:06
Kho 700/ CHCHQ announced the results of the bid package Procurement of materials to ensure technical work in the motorbike rescue industry in 2025 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ THIẾT BỊ PHƯƠNG HƯNG
17/11/2025 15:41
Kho 700/ CHCHQ announced the results of the bid package Purchasing supplies, goods, electrical and water equipment, renewing the yard lighting system, repairing and replacing the camera system .
- Winning bidder: HỘ KINH DOANH ĐÀO THỊ THANH XUÂN
12/11/2025 13:27
Kho 700/ CHCHQ publishes the plan Procurement of materials to ensure technical work in the rescue and motorbike industry in 2025 with 1 bidding package .
10/11/2025 19:29
Kho 700/ CHCHQ announced the results of the bid package Procurement of materials and goods to serve military training management in 2025 .
- Winning bidder: HỘ KINH DOANH VŨ THỊ LUYẾN 1981
10/11/2025 19:22
Kho 700/ CHCHQ announced the results of the bid package Procurement of materials and goods for preservation and repair of warehouses in 2025 .
- Winning bidder: HỘ KINH DOANH VŨ HỮU LUÂN
10/11/2025 19:18
Kho 700/ CHCHQ publishes the plan Purchasing supplies, goods, electrical and water equipment, renewing the yard lighting system, repairing and replacing the camera system with 1 bidding package .
05/11/2025 12:11
Kho 700/ CHCHQ publishes the plan Procurement of materials and goods to serve military training management in 2025 with 1 bidding package .
05/11/2025 12:01
Kho 700/ CHCHQ publishes the plan Procurement of materials and goods for preservation and repair of warehouses in 2025 with 1 bidding package .
05/11/2025 11:56
Kho 700/ CHCHQ announced the results of the bid package Procurement of supplies and equipment to ensure training for the CHCN industry in 2025 .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VẬT TƯ THIẾT BỊ PHƯƠNG HƯNG
02/11/2025 08:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Kho 700/ CHCHQ has posted 22 of the contractor selection plan, which contains 28 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Kho 700/ CHCHQ has posted 16 Tender Notices in 15 bidding packages. Among these, 16 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Kho 700/ CHCHQ has posted 24 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 24 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Kho 700/ CHCHQ has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Kho 700/ CHCHQ has a relationship with 9 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Kho 700/ CHCHQ has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects