Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Kho bạc Nhà nước khu vực VI as follows:
- Has relationships with 1 project owners.
- Has relationships with 18 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 118,537,833 VND, of which the total winning bid value is: 116,209,500 VND.
- The savings rate is: 1.96%.
Data analysis results of DauThau.info software for bid solicitors Kho bạc Nhà nước khu vực VI as follows:
- Has relationships with 18 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 118,537,833 VND, in which the total winning value is: 116,209,500 VND.
- The savings rate is: 1.96%.
This Bid solicitor is also an investor. The analysis results of data for the investor Kho bạc Nhà nước khu vực VI are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 14 contractor selection plans, of which 1 were self-published, and 13 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Kho bạc Nhà nước khu vực VI announced the results of the bid package Repair and maintenance of air conditioners of Transaction Offices No. 7, 8, 9, 10 of State Treasury Region VI .
- Winning bidder: Khối 9, Khu Tái định cư Mỹ Sơn - Phường Vĩnh Trại - Thành phố Lạng Sơn - Lạng Sơn.
17/12/2025 16:02
Kho bạc Nhà nước khu vực VI publishes the plan Repair and maintenance of air conditioners of Transaction Offices No. 7, 8, 9, 10 of State Treasury Region VI with 1 bidding package .
11/12/2025 14:55
Kho bạc Nhà nước khu vực VI announced the results of the bid package Audit to the settlement of the maintenance and repair project .
- Winning bidder: AADL AUDITING COMPANY LIMITED
09/12/2025 10:48
Kho bạc Nhà nước khu vực VI announced the results of the bid package Equipping boxes and shelves to store documents and vouchers for Transaction Offices and Operational Departments under the State Treasury Region VI in Lang Son province .
- Winning bidder: Nguyễn Quang Tùng
05/12/2025 15:53
Kho bạc Nhà nước khu vực VI publishes the plan Equipping boxes and shelves to store documents and vouchers for Transaction Offices and Operational Departments under the State Treasury Region VI in Lang Son province with 1 bidding package .
27/11/2025 16:10
Kho bạc Nhà nước khu vực VI announced the results of the bid package Project insurance is under the maintenance and repair project .
- Winning bidder: Post - Telecommunication Joint - Stock Insurance Corporation
18/11/2025 10:31
Kho bạc Nhà nước khu vực VI announced the results of the bid package Construction supervision of works under the maintenance and repair project .
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
18/11/2025 10:06
Kho bạc Nhà nước khu vực VI announced the results of the bid package Transporting assets, tools and instruments of Luong Tai State Treasury, Gia Binh State Treasury, Tien Du State Treasury, under Bac Ninh State Treasury (old) and Luc Nam State Treasury, Yen Dung State Treasury under Bac Giang State Treasury (old) .
- Winning bidder: CÔNG TY CP ĐẦU TƯ LTK SÔNG CẦU
10/11/2025 15:28
Kho bạc Nhà nước khu vực VI announced the results of the bid package Construction of works under the maintenance and repair project .
- Winning bidder: HOANG ANH TRANSPORT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
10/11/2025 15:02
Kho bạc Nhà nước khu vực VI announced the results of the bid package Generator maintenance at State Treasury Region VI .
- Winning bidder: Công ty cổ phần máy và thiết bị Miền bắc Việt nam
05/11/2025 15:07
The data sheet has been partially hidden, to see the full information please Login or Register
Kho bạc Nhà nước khu vực VI announced the results of the bid package Dismantling, installing, repairing, maintaining the regional air conditioning area .
- Winning bidder: ASEAN SERVICE AND TRADING DEVELOPMENT INVESTMENT LIMITED COMPANY
05/06/2025 10:52
Kho bạc Nhà nước khu vực VI publishes the plan Dismantling, installing, repairing, maintaining the regional air conditioning area with 1 bidding package .
03/06/2025 08:44
The data sheet has been partially hidden, to see the full information please Login or Register
Kho bạc Nhà nước khu vực VI announced the results of the bid package Repair and maintenance of air conditioners of Transaction Offices No. 7, 8, 9, 10 of State Treasury Region VI .
- Winning bidder: Khối 9, Khu Tái định cư Mỹ Sơn - Phường Vĩnh Trại - Thành phố Lạng Sơn - Lạng Sơn.
17/12/2025 16:02
Kho bạc Nhà nước khu vực VI publishes the plan Repair and maintenance of air conditioners of Transaction Offices No. 7, 8, 9, 10 of State Treasury Region VI with 1 bidding package .
11/12/2025 14:55
Kho bạc Nhà nước khu vực VI announced the results of the bid package Audit to the settlement of the maintenance and repair project .
- Winning bidder: AADL AUDITING COMPANY LIMITED
09/12/2025 10:48
Kho bạc Nhà nước khu vực VI announced the results of the bid package Equipping boxes and shelves to store documents and vouchers for Transaction Offices and Operational Departments under the State Treasury Region VI in Lang Son province .
- Winning bidder: Nguyễn Quang Tùng
05/12/2025 15:53
Kho bạc Nhà nước khu vực VI publishes the plan Equipping boxes and shelves to store documents and vouchers for Transaction Offices and Operational Departments under the State Treasury Region VI in Lang Son province with 1 bidding package .
27/11/2025 16:10
Kho bạc Nhà nước khu vực VI announced the results of the bid package Project insurance is under the maintenance and repair project .
- Winning bidder: Post - Telecommunication Joint - Stock Insurance Corporation
18/11/2025 10:31
Kho bạc Nhà nước khu vực VI announced the results of the bid package Construction supervision of works under the maintenance and repair project .
- Winning bidder: THIEN MINH DUC INVESTMENT COMPANY LIMITED
18/11/2025 10:06
Kho bạc Nhà nước khu vực VI announced the results of the bid package Transporting assets, tools and instruments of Luong Tai State Treasury, Gia Binh State Treasury, Tien Du State Treasury, under Bac Ninh State Treasury (old) and Luc Nam State Treasury, Yen Dung State Treasury under Bac Giang State Treasury (old) .
- Winning bidder: CÔNG TY CP ĐẦU TƯ LTK SÔNG CẦU
10/11/2025 15:28
Kho bạc Nhà nước khu vực VI announced the results of the bid package Construction of works under the maintenance and repair project .
- Winning bidder: HOANG ANH TRANSPORT CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
10/11/2025 15:02
Kho bạc Nhà nước khu vực VI announced the results of the bid package Generator maintenance at State Treasury Region VI .
- Winning bidder: Công ty cổ phần máy và thiết bị Miền bắc Việt nam
05/11/2025 15:07
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Kho bạc Nhà nước khu vực VI has posted 1 of the contractor selection plan, which contains 1 of the bidding package. See full list here
Summary: The Bid solicitor Kho bạc Nhà nước khu vực VI has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Kho bạc Nhà nước khu vực VI has a relationship with 18 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Kho bạc Nhà nước khu vực VI has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Kho bạc Nhà nước khu vực VI has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects