Data analysis results of DauThau.info software for bid solicitors Kho bạc Nhà nước Nam Định as follows:
- Has relationships with 2 project owners.
- Has relationships with 28 contractor.
- Announced 10 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 56 contractor selection plans with a total of 136 bidding packages, of which 45 prequalification documents have not found the investment project.
- Has invited bids for 27 packages (with 28 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 23 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 120 packages that have not fully posted the contractor selection results. Of these 120 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.25 contractors.
- Breakdown by bidding field: Goods 75.00%, Construction 21.43%, Consultancy 0%, Non-consultancy 0%, Mixed 3.57%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 18,432,404,900 VND, of which the total winning bid value is: 17,416,661,100 VND.
- The savings rate is: 5.51%.
Data analysis results of DauThau.info software for bid solicitors Kho bạc Nhà nước Nam Định as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 2.25 contractors.
- Proportion of bidding fields: Goods 75.00%, Construction 21.43%, Consulting 0%, Non-consulting 0%, Mixed 3.57%, Other 0%.
- The total value according to the bidding package with valid IMP is: 18,432,404,900 VND, in which the total winning value is: 17,416,661,100 VND.
- The savings rate is: 5.51%.
This Bid solicitor is also an investor. The analysis results of data for the investor Kho bạc Nhà nước Nam Định are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 50 contractor selection plans, of which 43 were self-published, and 7 were published by other entities.
- Is the investor of 30 Tender Notices, of which 19 were self-invited, and 11 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Repairing the surveillance camera system at Nam Dinh State Treasury headquarters of the investor Kho bạc Nhà nước Nam Định.
30/09/2022 17:01
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the request Repairing the surveillance camera system at Nam Dinh State Treasury headquarters of the investor Kho bạc Nhà nước Nam Định with 1 bidding package.
08/08/2022 13:52
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of district State Treasury air conditioners of the investor Kho bạc Nhà nước Nam Định.
21/07/2022 09:01
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Shopping for hall sound sets of the investor Kho bạc Nhà nước Nam Định.
20/07/2022 18:24
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of hall sound sets of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: Trần Văn Dũng
20/07/2022 18:05
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of sound sets for the conference hall of Nam Dinh State Treasury. of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: Công ty TNHH MTV Máy văn phòng - VPP Phượng Dũng
20/07/2022 17:35
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Renovating 0.4KV power supply system at Nam Truc State Treasury headquarters of the investor Kho bạc Nhà nước Nam Định.
20/07/2022 16:19
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of sound sets for the conference hall of Nam Dinh State Treasury of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ CÔNG NGHỆ CAO PHƯƠNG ĐÔNG
20/07/2022 15:50
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the request Procurement, installation and wood paneling of some decorative walls for the Traditional room of Nam Dinh State Treasury of the investor Kho bạc Nhà nước Nam Định with 1 bidding package.
07/07/2022 10:29
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of air conditioners for the State Treasury in some districts of Nam Dinh State Treasury of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: CÔNG TY CỔ PHẦN ĐIỆN TỬ ĐIỆN LẠNH MINH TÂM
01/07/2022 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
Kho bạc Nhà nước Nam Định announced the results of the bid package Repairing the surveillance camera system at Nam Dinh State Treasury headquarters .
- Winning bidder: Công ty CÔNG NGHỆ VÀ GIẢI PHÁP VIỄN THÔNG ĐOÀN VŨ
30/09/2022 17:01
Kho bạc Nhà nước Nam Định publishes the plan Repairing the surveillance camera system at Nam Dinh State Treasury headquarters with 1 bidding package .
08/08/2022 13:52
Kho bạc Nhà nước Nam Định announced the results of the bid package Supply and installation of district State Treasury air conditioners .
- Winning bidder: Công ty TNHH MTV Máy văn phòng - VPP Phượng Dũng
21/07/2022 09:01
Kho bạc Nhà nước Nam Định announced the results of the bid package Shopping for hall sound sets .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN MÁY VĂN PHÒNG, VĂN PHÒNG PHẨM PHƯỢNG DŨNG
20/07/2022 18:24
Kho bạc Nhà nước Nam Định announced the results of the bid package Supply and installation of hall sound sets .
- Winning bidder: Trần Văn Dũng
20/07/2022 18:05
Kho bạc Nhà nước Nam Định announced the results of the bid package Supply and installation of sound sets for the conference hall of Nam Dinh State Treasury. .
- Winning bidder: Công ty TNHH MTV Máy văn phòng - VPP Phượng Dũng
20/07/2022 17:35
Kho bạc Nhà nước Nam Định announced the results of the bid package Renovating 0.4KV power supply system at Nam Truc State Treasury headquarters .
- Winning bidder: CÔNG TY TNHH XÂY LẮP ĐIỆN NAM ĐỊNH
20/07/2022 16:19
Kho bạc Nhà nước Nam Định announced the results of the bid package Supply and installation of sound sets for the conference hall of Nam Dinh State Treasury .
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ CÔNG NGHỆ CAO PHƯƠNG ĐÔNG
20/07/2022 15:50
Kho bạc Nhà nước Nam Định publishes the plan Procurement, installation and wood paneling of some decorative walls for the Traditional room of Nam Dinh State Treasury with 1 bidding package .
07/07/2022 10:29
Kho bạc Nhà nước Nam Định announced the results of the bid package Supply and installation of air conditioners for the State Treasury in some districts of Nam Dinh State Treasury .
- Winning bidder: CÔNG TY CỔ PHẦN ĐIỆN TỬ ĐIỆN LẠNH MINH TÂM
01/07/2022 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Repairing the surveillance camera system at Nam Dinh State Treasury headquarters of the investor Kho bạc Nhà nước Nam Định.
30/09/2022 17:01
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the request Repairing the surveillance camera system at Nam Dinh State Treasury headquarters of the investor Kho bạc Nhà nước Nam Định with 1 bidding package.
08/08/2022 13:52
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of district State Treasury air conditioners of the investor Kho bạc Nhà nước Nam Định.
21/07/2022 09:01
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Shopping for hall sound sets of the investor Kho bạc Nhà nước Nam Định.
20/07/2022 18:24
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of hall sound sets of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: Trần Văn Dũng
20/07/2022 18:05
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of sound sets for the conference hall of Nam Dinh State Treasury. of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: Công ty TNHH MTV Máy văn phòng - VPP Phượng Dũng
20/07/2022 17:35
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Renovating 0.4KV power supply system at Nam Truc State Treasury headquarters of the investor Kho bạc Nhà nước Nam Định.
20/07/2022 16:19
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of sound sets for the conference hall of Nam Dinh State Treasury of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: CÔNG TY CỔ PHẦN THƯƠNG MẠI VÀ CÔNG NGHỆ CAO PHƯƠNG ĐÔNG
20/07/2022 15:50
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the request Procurement, installation and wood paneling of some decorative walls for the Traditional room of Nam Dinh State Treasury of the investor Kho bạc Nhà nước Nam Định with 1 bidding package.
07/07/2022 10:29
The Bid solicitor Kho bạc Nhà nước Nam Định has posted the results of the bidding package Supply and installation of air conditioners for the State Treasury in some districts of Nam Dinh State Treasury of the investor Kho bạc Nhà nước Nam Định.
- Winning bidder: CÔNG TY CỔ PHẦN ĐIỆN TỬ ĐIỆN LẠNH MINH TÂM
01/07/2022 15:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Kho bạc Nhà nước Nam Định has posted 56 of the contractor selection plan, which contains 136 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Kho bạc Nhà nước Nam Định has posted 28 Tender Notices in 27 bidding packages. Among these, 9 Tender Notices were self-invited, and 19 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Kho bạc Nhà nước Nam Định has posted 23 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 23 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Kho bạc Nhà nước Nam Định has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Kho bạc Nhà nước Nam Định has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Kho bạc Nhà nước Nam Định has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects