Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Khu quản lý giao thông đô thị số 2 as follows:
- Has relationships with 2 project owners.
- Has relationships with 83 contractor.
- Announced 15 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 177 contractor selection plans with a total of 869 bidding packages, of which 102 prequalification documents have not found the investment project.
- Has invited bids for 248 packages (with 254 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 86 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 796 packages that have not fully posted the contractor selection results. Of these 782 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 6.30%, Construction 64.96%, Consultancy 15.35%, Non-consultancy 12.99%, Mixed 0.39%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,192,660,642,609 VND, of which the total winning bid value is: 1,173,821,592,713 VND.
- The savings rate is: 1.58%.
Data analysis results of DauThau.info software for bid solicitors Khu quản lý giao thông đô thị số 2 as follows:
- Has relationships with 83 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 6.30%, Construction 64.96%, Consulting 15.35%, Non-consulting 12.99%, Mixed 0.39%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,192,660,642,609 VND, in which the total winning value is: 1,173,821,592,713 VND.
- The savings rate is: 1.58%.
This Bid solicitor is also an investor. The analysis results of data for the investor Khu quản lý giao thông đô thị số 2 are as follows:
- Is the investor of 15 development investment projects.
- Is the investor of 0 contractor selection plans, of which 0 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 0 bidding packages.
- Participated in consulting for 0 bidding packages with 0 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Repairing Dien Bien Phu Street from Hang Xanh Interchange to Dien Bien Phu Bridge, on the right.
20/08/2019 12:12
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Construction of Tang Long Bridge.
26/03/2019 08:08
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Construction of an overpass in front of the new Mien Dong Bus Station on Hanoi Highway.
19/02/2019 13:13
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Expanding Dong Van Cong street (section from Giong Ong To 2 bridge to My Thuy intersection).
15/02/2019 15:15
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Building a connection route from Long Phuoc Street to Ho Chi Minh City University of Law, Long Phuoc Ward, District 9, Ho Chi Minh City.
15/02/2019 14:14
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Building embankments to prevent river bank erosion in Giong Ong To bridge area..
04/12/2018 11:11
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Construction of My Thuy intersection.
22/11/2018 15:15
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Enhance green space along Hanoi highway and Metro line No. 1 Ben Thanh Suoi Tien.
05/09/2018 16:16
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Strengthening the green patch of the globe over Binh Phuoc.
26/06/2018 16:16
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Expanding Do Xuan Hop Street.
19/06/2018 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
Khu quản lý giao thông đô thị số 2 publishes the plan Repairing Dien Bien Phu Street from Hang Xanh Interchange to Dien Bien Phu Bridge, on the right with 3 bidding package .
20/08/2019 12:25
Khu quản lý giao thông đô thị số 2 publishes Tender Notice Civil Works in the form National competitive bidding .
20/05/2019 09:10
Khu quản lý giao thông đô thị số 2 publishes Tender Notice Construction of lighting system in the form National competitive bidding .
26/03/2019 09:02
Khu quản lý giao thông đô thị số 2 publishes the plan Construction of Tang Long Bridge with 3 bidding package .
26/03/2019 08:55
Khu quản lý giao thông đô thị số 2 publishes Tender Notice Consulting, surveying, designing construction drawings, cost estimates in the form National competitive bidding .
22/03/2019 15:31
Khu quản lý giao thông đô thị số 2 publishes Tender Notice Consultancy on surveying and preparing financial statements and estimates (Phase 2) in the form National competitive bidding .
21/03/2019 15:25
Khu quản lý giao thông đô thị số 2 publishes the plan Construction of My Thuy intersection with 16 bidding package .
19/03/2019 15:42
Khu quản lý giao thông đô thị số 2 publishes the plan Quality control of road and bridge works in operation by establishing a database of bridge vibration - deformation with 3 bidding package .
28/02/2019 15:59
Khu quản lý giao thông đô thị số 2 publishes Tender Notice Consulting, surveying and designing construction drawings, cost estimates in the form National competitive bidding .
21/02/2019 16:09
Khu quản lý giao thông đô thị số 2 publishes the plan Construction of an overpass in front of the new Mien Dong Bus Station on Hanoi Highway with 14 bidding package .
19/02/2019 14:50
The data sheet has been partially hidden, to see the full information please Login or Register
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Repairing Dien Bien Phu Street from Hang Xanh Interchange to Dien Bien Phu Bridge, on the right.
20/08/2019 12:12
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Construction of Tang Long Bridge.
26/03/2019 08:08
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Construction of an overpass in front of the new Mien Dong Bus Station on Hanoi Highway.
19/02/2019 13:13
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Expanding Dong Van Cong street (section from Giong Ong To 2 bridge to My Thuy intersection).
15/02/2019 15:15
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Building a connection route from Long Phuoc Street to Ho Chi Minh City University of Law, Long Phuoc Ward, District 9, Ho Chi Minh City.
15/02/2019 14:14
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Building embankments to prevent river bank erosion in Giong Ong To bridge area..
04/12/2018 11:11
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Construction of My Thuy intersection.
22/11/2018 15:15
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Enhance green space along Hanoi highway and Metro line No. 1 Ben Thanh Suoi Tien.
05/09/2018 16:16
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Strengthening the green patch of the globe over Binh Phuoc.
26/06/2018 16:16
Investor Khu quản lý giao thông đô thị số 2 has posted an investment and development project Expanding Do Xuan Hop Street.
19/06/2018 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Khu quản lý giao thông đô thị số 2 has posted 177 of the contractor selection plan, which contains 869 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Khu quản lý giao thông đô thị số 2 has posted 254 Tender Notices in 248 bidding packages. Among these, -62 Tender Notices were self-invited, and 316 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Khu quản lý giao thông đô thị số 2 has a relationship with 83 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Khu quản lý giao thông đô thị số 2 has a relationship with 6 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects