Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Làng trẻ em mồ côi Hà Tĩnh as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 6 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 26 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 17 packages that have not fully posted the contractor selection results. Of these 17 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,810,481,000 VND, of which the total winning bid value is: 13,794,575,000 VND.
- The savings rate is: 0.12%.
Data analysis results of DauThau.info software for bid solicitors Làng trẻ em mồ côi Hà Tĩnh as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,810,481,000 VND, in which the total winning value is: 13,794,575,000 VND.
- The savings rate is: 0.12%.
This Bid solicitor is also an investor. The analysis results of data for the investor Làng trẻ em mồ côi Hà Tĩnh are as follows:
- Is the investor of 6 development investment projects.
- Is the investor of 13 contractor selection plans, of which 6 were self-published, and 7 were published by other entities.
- Is the investor of 6 Tender Notices, of which 3 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction work: Renovating and repairing roofs of disabled houses, doors and windows of male and female children's houses in Ha Tinh Orphanage Village .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI HOÀNG PHÁT
23/12/2025 17:35
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Plan for selecting contractors to carry out the project: Renovating and repairing roofs of disabled houses, doors and windows of male and female children's houses in Ha Tinh Orphanage Village with 2 bidding package .
23/12/2025 17:30
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package 01.MS: Procurement of industrial washing machines and industrial dryers .
- Winning bidder: LY NGAN VINA JOINT STOCK COMPANY
23/12/2025 17:11
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction work: Renovating and repairing roofs of houses for boys and girls in Ha Tinh orphan village .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LÂM TRƯỜNG SƠN
19/12/2025 17:10
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction work: Renovating and repairing the roof of disabled houses in Ha Tinh orphan village .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI HOÀNG PHÁT
19/12/2025 17:05
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Plan for selecting contractors to carry out the project: Renovating and repairing the roof of disabled houses in Ha Tinh orphan village with 2 bidding package .
19/12/2025 16:10
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Plan for selecting contractors to carry out the project: Renovating and repairing the roof of houses for boys and girls in Ha Tinh orphan village with 2 bidding package .
19/12/2025 15:55
Làng trẻ em mồ côi Hà Tĩnh publishes Tender Notice 01.MS: Procurement of industrial washing machines and industrial dryers in the form Open bidding .
11/12/2025 16:06
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Shopping for industrial washing machines and industrial dryers at Ha Tinh Orphanage Village with 3 bidding package .
10/12/2025 16:22
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction of works: renovating and repairing a number of housing items for male children .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI HOÀNG PHÁT
25/09/2025 16:32
The data sheet has been partially hidden, to see the full information please Login or Register
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package 04.TVĐT .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG HẢI ÂU
30/06/2025 08:07
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package 03.TVĐT .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG HOÀNG PHAN
30/06/2025 08:04
Làng trẻ em mồ côi Hà Tĩnh publishes the plan The contractor selection plan a number of bidding packages of Ha Tinh orphanage repair works with 5 bidding package .
27/06/2025 10:00
Làng trẻ em mồ côi Hà Tĩnh publishes the plan The contractor selection plan a number of bidding packages of Ha Tinh orphanage repair works with 5 bidding package .
27/06/2025 07:55
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package QLDA: Project management advice .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI 579
16/05/2025 16:38
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package TVTK: Survey consultancy, Economic and technical reports of works: Repair of Ha Tinh orphanage village .
- Winning bidder: CÔNG TY CP TƯ VẤN XÂY DỰNG TỔNG HỢP HÒA PHÁT
16/05/2025 16:37
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Plan for contractor selection of bidding packages for the preparation of project investment: Repairing Ha Tinh orphanage village with 3 bidding package .
16/05/2025 16:06
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package 01.XL: Construction .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG HẢI LONG( THAY ĐỔI LẦN 1, TÊN CŨ: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ XÂY DỰNG HẢI LONG)
08/04/2024 17:04
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bidding package 01.XL: Construction with 2 participating contractors .
25/03/2024 08:31
Làng trẻ em mồ côi Hà Tĩnh publishes Tender Notice 01.XL: Construction in the form Open bidding .
15/03/2024 18:01
The data sheet has been partially hidden, to see the full information please Login or Register
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction work: Renovating and repairing roofs of disabled houses, doors and windows of male and female children's houses in Ha Tinh Orphanage Village .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI HOÀNG PHÁT
23/12/2025 17:35
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Plan for selecting contractors to carry out the project: Renovating and repairing roofs of disabled houses, doors and windows of male and female children's houses in Ha Tinh Orphanage Village with 2 bidding package .
23/12/2025 17:30
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package 01.MS: Procurement of industrial washing machines and industrial dryers .
- Winning bidder: LY NGAN VINA JOINT STOCK COMPANY
23/12/2025 17:11
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction work: Renovating and repairing roofs of houses for boys and girls in Ha Tinh orphan village .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LÂM TRƯỜNG SƠN
19/12/2025 17:10
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction work: Renovating and repairing the roof of disabled houses in Ha Tinh orphan village .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI HOÀNG PHÁT
19/12/2025 17:05
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Plan for selecting contractors to carry out the project: Renovating and repairing the roof of disabled houses in Ha Tinh orphan village with 2 bidding package .
19/12/2025 16:10
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Plan for selecting contractors to carry out the project: Renovating and repairing the roof of houses for boys and girls in Ha Tinh orphan village with 2 bidding package .
19/12/2025 15:55
Làng trẻ em mồ côi Hà Tĩnh publishes Tender Notice 01.MS: Procurement of industrial washing machines and industrial dryers in the form Open bidding .
11/12/2025 16:06
Làng trẻ em mồ côi Hà Tĩnh publishes the plan Shopping for industrial washing machines and industrial dryers at Ha Tinh Orphanage Village with 3 bidding package .
10/12/2025 16:22
Làng trẻ em mồ côi Hà Tĩnh announced the results of the bid package Construction of works: renovating and repairing a number of housing items for male children .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI HOÀNG PHÁT
25/09/2025 16:32
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Làng trẻ em mồ côi Hà Tĩnh has posted 6 of the contractor selection plan, which contains 26 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Làng trẻ em mồ côi Hà Tĩnh has posted 3 Tender Notices in 3 bidding packages. Among these, 3 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Làng trẻ em mồ côi Hà Tĩnh has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Làng trẻ em mồ côi Hà Tĩnh has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Làng trẻ em mồ côi Hà Tĩnh has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Làng trẻ em mồ côi Hà Tĩnh has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects