Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD as follows:
- Has relationships with 4 project owners.
- Has relationships with 250 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 201 contractor selection plans with a total of 605 bidding packages, of which 70 prequalification documents have not found the investment project.
- Has invited bids for 408 packages (with 423 tender notices), and conducted prequalification for 0 packages.
- There are 29 bidding packages with content that needs clarification.
- Announced the results of 521 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 138 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 99 packages that have not fully posted the contractor selection results. Of these 90 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.09 contractors.
- Breakdown by bidding field: Goods 13.95%, Construction 11.58%, Consultancy 46.57%, Non-consultancy 27.42%, Mixed 0.24%, Other fields 0.24%.
- The total value according to the packages with valid contractor selection results is: 2,170,355,383,272 VND, of which the total winning bid value is: 2,120,743,999,904 VND.
- The savings rate is: 2.29%.
Data analysis results of DauThau.info software for bid solicitors NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD as follows:
- Has relationships with 250 contractor.
- The average number of contractors participating in each bidding package is: 2.09 contractors.
- Proportion of bidding fields: Goods 13.95%, Construction 11.58%, Consulting 46.57%, Non-consulting 27.42%, Mixed 0.24%, Other 0.24%.
- The total value according to the bidding package with valid IMP is: 2,170,355,383,272 VND, in which the total winning value is: 2,120,743,999,904 VND.
- The savings rate is: 2.29%.
This Bid solicitor is also an investor. The analysis results of data for the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 44 contractor selection plans, of which 44 were self-published, and 0 were published by other entities.
- Is the investor of 101 Tender Notices, of which 97 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Contact LH.G06: Construction of 110kV . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: TỔNG CÔNG TY CỔ PHẦN XÂY DỰNG ĐIỆN VIỆT NAM
28/12/2022 09:26
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ UNISTARS
19/12/2022 14:12
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NDVT.G10: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
16/12/2022 16:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NC_NS.G05: Construction of 110kV transmission line from Nong Cong 220kV substation to VT 94 of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI VÀ XÂY LẮP ĐIỆN ĐÔNG Á
16/12/2022 11:40
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
14/12/2022 14:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
08/12/2022 15:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package HH2.TH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
08/12/2022 09:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G05: Supply, transport and install VTTB substation 110kV of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
07/12/2022 11:39
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NE. G06: Construction of 110k . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN NĂNG LƯỢNG THỦ ĐÔ
07/12/2022 09:50
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package TT.G12: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH Kế toán, Kiểm toán Việt Nam
06/12/2022 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package Contact LH.G06: Construction of 110kV . transmission line .
- Winning bidder: CÔNG TY CP XÂY DỰNG ĐIỆN VNECO4, TỔNG CÔNG TY CỔ PHẦN XÂY DỰNG ĐIỆN VIỆT NAM
28/12/2022 09:26
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package LH.G14: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ PNT, CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ UNISTARS
19/12/2022 14:12
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package NDVT.G10: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ ĐỊNH GIÁ A-Z VIỆT NAM, CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
16/12/2022 16:54
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package NC_NS.G05: Construction of 110kV transmission line from Nong Cong 220kV substation to VT 94 .
- Winning bidder: CÔNG TY CỔ PHẦN MAI HOÀNG GIA, CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI VÀ XÂY LẮP ĐIỆN ĐÔNG Á
16/12/2022 11:40
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package Package 08: Audit of completed projects .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ TƯ VẤN UHY, CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
14/12/2022 14:54
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package Package 08: Audit of completed projects .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ TƯ VẤN UHY, CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
08/12/2022 15:15
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package HH2.TH.G14: Completed project audit .
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN VÀ ĐỊNH GIÁ A-Z VIỆT NAM, CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
08/12/2022 09:15
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bidding package Contact LH.G06: Construction of 110kV . transmission line with 2 participating contractors .
07/12/2022 20:04
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package LH.G05: Supply, transport and install VTTB substation 110kV .
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
07/12/2022 11:39
NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD announced the results of the bid package NE. G06: Construction of 110k . transmission line .
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN NĂNG LƯỢNG THỦ ĐÔ
07/12/2022 09:50
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Contact LH.G06: Construction of 110kV . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: TỔNG CÔNG TY CỔ PHẦN XÂY DỰNG ĐIỆN VIỆT NAM
28/12/2022 09:26
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH KIỂM TOÁN QUỐC TẾ UNISTARS
19/12/2022 14:12
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NDVT.G10: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
16/12/2022 16:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NC_NS.G05: Construction of 110kV transmission line from Nong Cong 220kV substation to VT 94 of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ THƯƠNG MẠI VÀ XÂY LẮP ĐIỆN ĐÔNG Á
16/12/2022 11:40
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
14/12/2022 14:54
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package Package 08: Audit of completed projects of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN VÀ ĐỊNH GIÁ ASCO
08/12/2022 15:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package HH2.TH.G14: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY TNHH HÃNG KIỂM TOÁN AASC
08/12/2022 09:15
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package LH.G05: Supply, transport and install VTTB substation 110kV of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty CP Điện Công Nghiệp Hà Nội
07/12/2022 11:39
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package NE. G06: Construction of 110k . transmission line of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: CÔNG TY CỔ PHẦN PHÁT TRIỂN NĂNG LƯỢNG THỦ ĐÔ
07/12/2022 09:50
The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted the results of the bidding package TT.G12: Completed project audit of the investor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD.
- Winning bidder: Công ty TNHH Kế toán, Kiểm toán Việt Nam
06/12/2022 16:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted 201 of the contractor selection plan, which contains 605 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted 423 Tender Notices in 408 bidding packages. Among these, 93 Tender Notices were self-invited, and 330 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has posted 521 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 521 package, canceled the bid 0 package (among the bidding packages above).
- There are 138 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has a relationship with 250 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has a relationship with 74 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity NORTHERN POWER CONSTRUCTION PROJECT MANAGEMENT BOARD has a relationship with 6 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects