Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors pckg as follows:
- Has relationships with 2 project owners.
- Has relationships with 504 contractor.
- Announced 275 investment development project, of which 11 projects have not yet announced the prequalification documents.
- Announced 927 contractor selection plans with a total of 1100 bidding packages, of which 437 prequalification documents have not found the investment project.
- Has invited bids for 840 packages (with 847 tender notices), and conducted prequalification for 0 packages.
- There are 72 bidding packages with content that needs clarification.
- Announced the results of 632 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 128 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 423 packages that have not fully posted the contractor selection results. Of these 308 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.70 contractors.
- Breakdown by bidding field: Goods 60.45%, Construction 27.15%, Consultancy 11.69%, Non-consultancy 0.71%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,721,417,002,246 VND, of which the total winning bid value is: 1,561,840,406,126 VND.
- The savings rate is: 9.27%.
Data analysis results of DauThau.info software for bid solicitors pckg as follows:
- Has relationships with 504 contractor.
- The average number of contractors participating in each bidding package is: 2.70 contractors.
- Proportion of bidding fields: Goods 60.45%, Construction 27.15%, Consulting 11.69%, Non-consulting 0.71%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,721,417,002,246 VND, in which the total winning value is: 1,561,840,406,126 VND.
- The savings rate is: 9.27%.
This Bid solicitor is also an investor. The analysis results of data for the investor pckg are as follows:
- Is the investor of 275 development investment projects.
- Is the investor of 960 contractor selection plans, of which 922 were self-published, and 38 were published by other entities.
- Is the investor of 611 Tender Notices, of which 596 were self-invited, and 15 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
pckg publishes the plan Overcoming existence of FPF for 03 operators with NLMTAM and 11 TBA 110kV Kien Giang Province (after approval of the BCKTKT) with 3 bidding package .
08/01/2026 11:04
pckg publishes the plan Overcoming existence of FPF for 03 operators with NLMTAM and 11 TBA 110kV Kien Giang Province (after approval of the BCKTKT) with 3 bidding package .
08/01/2026 10:59
pckg publishes the plan Replace underground cable revealed 22kV TBA 110kV An Bien, An Giang province in 2025 with 1 bidding package .
02/10/2025 15:28
pckg publishes the plan Additional equipment, replacing server equipment, archiving for internal management needs of Kien Giang Power Company with 1 bidding package .
03/09/2025 20:11
pckg publishes the plan Equipped with transmission network infrastructure to consolidate the provincial IT network of Kien Giang Power Company with 1 bidding package .
16/08/2025 11:31
pckg publishes the plan Consulting survey, setting up TKBVTC-DT with 1 bidding package .
07/08/2025 09:15
pckg publishes the plan Supplementing additional labor protection clothing in 2025 with 1 bidding package .
24/07/2025 07:37
pckg publishes the plan Processing equipment and tools to prepare the production of the 110kV Bac Phu Quoc station, Kien Giang province with 1 bidding package .
23/07/2025 20:12
pckg publishes the plan Upgrading lower voltage medium grids from 1 phase to 3 phases, deleting sub -sentence An Bien district, Kien Giang province in 2025 with 1 bidding package .
23/07/2025 16:04
The data sheet has been partially hidden, to see the full information please Login or Register
pckg publishes the plan Contractor selection plan: Works: Repairing lower voltage medium lines and transformer stations of 472-474-476-478VT Vinh Thuan district, Kien Giang province in 2025 with 1 bidding package .
14/07/2025 09:56
pckg publishes the plan Contractor selection plan: Works: Repairing Lower Lower Line line 474VT, 476VT, 478AB U Minh Thuong District Kien Giang Province in 2025 with 1 bidding package .
14/07/2025 09:26
pckg publishes the plan Plan for selecting construction contractors: Repairing median line 471-477gr, 471gr, 472gr, 473gr, 475gr, 476MP Giong Rieng District, Kien Giang Province in 2025 with 2 bidding package .
30/06/2025 15:34
pckg publishes the plan Plan for selecting construction contractors: Repairing medium voltage lines of 479gq, 481gq, 477gq, 476lm in Go Quao district, Kien Giang province in 2025 with 1 bidding package .
30/06/2025 15:25
pckg publishes the plan Supplementing the internal fiber optic cable network of Kien Giang Province in 2025 with 1 bidding package .
29/06/2025 09:34
pckg publishes the plan Equipped with a low -voltage capacitor in 2025 Kien Giang Power Company with 1 bidding package .
27/06/2025 08:50
pckg publishes the plan Construction supervision
The works:
1. Lightning protection 110kV line 173 Ha Tien - 172 Phu Quoc in 2025
2. Repairing 110kV An Bien - Xeo Nuon - Lai Son Kien Giang Province in 2025
3. Repairing 110kV Minh Phong Transformer Station in Kien Giang Province in 2025
4. Repairing 110kV Thanh Dong Transformer Station in Kien Giang Province in 2025 with 1 bidding package .
24/06/2025 16:49
The data sheet has been partially hidden, to see the full information please Login or Register
pckg publishes the plan Overcoming existence of FPF for 03 operators with NLMTAM and 11 TBA 110kV Kien Giang Province (after approval of the BCKTKT) with 3 bidding package .
08/01/2026 11:04
pckg publishes the plan Overcoming existence of FPF for 03 operators with NLMTAM and 11 TBA 110kV Kien Giang Province (after approval of the BCKTKT) with 3 bidding package .
08/01/2026 10:59
pckg publishes the plan Replace underground cable revealed 22kV TBA 110kV An Bien, An Giang province in 2025 with 1 bidding package .
02/10/2025 15:28
pckg publishes the plan Additional equipment, replacing server equipment, archiving for internal management needs of Kien Giang Power Company with 1 bidding package .
03/09/2025 20:11
pckg publishes the plan Equipped with transmission network infrastructure to consolidate the provincial IT network of Kien Giang Power Company with 1 bidding package .
16/08/2025 11:31
pckg publishes the plan Consulting survey, setting up TKBVTC-DT with 1 bidding package .
07/08/2025 09:15
pckg publishes the plan Supplementing additional labor protection clothing in 2025 with 1 bidding package .
24/07/2025 07:37
pckg publishes the plan Processing equipment and tools to prepare the production of the 110kV Bac Phu Quoc station, Kien Giang province with 1 bidding package .
23/07/2025 20:12
pckg publishes the plan Upgrading lower voltage medium grids from 1 phase to 3 phases, deleting sub -sentence An Bien district, Kien Giang province in 2025 with 1 bidding package .
23/07/2025 16:04
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s pckg has posted 927 of the contractor selection plan, which contains 1100 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor pckg has posted 847 Tender Notices in 840 bidding packages. Among these, 683 Tender Notices were self-invited, and 164 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor pckg has posted 632 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 632 package, canceled the bid 0 package (among the bidding packages above).
- There are 128 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor pckg has a relationship with 504 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor pckg has a relationship with 31 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity pckg has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects