Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 5 contractor selection plans, of which 0 were self-published, and 5 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều announced the results of the bid package Package 02: Advice on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG NGUYỄN TOÀN TÀI
05/01/2026 14:24
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều announced the results of the bid package Package 01: Advice on making economic and technical reports .
- Winning bidder: Viện Quy hoạch xây dựng
05/01/2026 14:22
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều announced the results of the bid package Package 02: Advice on verification of economic and technical reports .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ XÂY DỰNG NGUYỄN TOÀN TÀI
05/01/2026 14:18
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều publishes the plan Contractor selection plan for the investment preparation phase of the project: Renovation, maintenance, repair and urban embellishment of Mau Than street, section from 30/4 street to Rach Ngong bridge, Ninh Kieu ward (Phase 1) with 2 bidding package .
01/01/2026 10:33
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều publishes the plan Contractor selection plan for the investment preparation phase of the project: Renovation, maintenance, repair and urban embellishment of Quang Trung street, section from Quang Trung bridge to 30/4 street, Ninh Kieu ward (Phase 1) with 2 bidding package .
01/01/2026 10:26
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều publishes the plan Renovate and repair Ninh Kieu Wharf Park in 2025 with 2 bidding package .
31/12/2025 09:59
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều announced the results of the bid package Package 05: Construction supervision consulting and equipment supply and installation .
- Winning bidder: ABC GENERAL CONSULTANTS AND CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
23/12/2025 14:03
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều announced the results of the bid package Package 04: Construction and equipment supply and installation .
- Winning bidder: CÔNG TY TNHH ĐẦU TƯ THƯƠNG MẠI PHÁT TRIỂN MEKONG
23/12/2025 14:00
Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều publishes the plan Project contractor selection plan: Installing traffic signals at the intersection of Quang Trung Street with the main gate of Can Tho City Party Committee Hall with 2 bidding package .
22/12/2025 15:48
Investor Phòng Kinh tế, Hạ Tầng và Đô thị phường Ninh Kiều has posted an investment and development project Install traffic signals at the intersection of Quang Trung Street with the main gate of Can Tho City Party Committee Hall.
22/12/2025 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects