Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors phòng Kinh tế thành phố Hạ Long as follows:
- Has relationships with 2 project owners.
- Has relationships with 28 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 68 contractor selection plans with a total of 106 bidding packages, of which 58 prequalification documents have not found the investment project.
- Has invited bids for 16 packages (with 24 tender notices), and conducted prequalification for 0 packages.
- There are 8 bidding packages with content that needs clarification.
- Announced the results of 34 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 19 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 71 packages that have not fully posted the contractor selection results. Of these 70 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.44 contractors.
- Breakdown by bidding field: Goods 12.50%, Construction 8.33%, Consultancy 70.83%, Non-consultancy 8.33%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 28,880,242,000 VND, of which the total winning bid value is: 27,448,270,000 VND.
- The savings rate is: 4.96%.
Data analysis results of DauThau.info software for bid solicitors phòng Kinh tế thành phố Hạ Long as follows:
- Has relationships with 28 contractor.
- The average number of contractors participating in each bidding package is: 1.44 contractors.
- Proportion of bidding fields: Goods 12.50%, Construction 8.33%, Consulting 70.83%, Non-consulting 8.33%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 28,880,242,000 VND, in which the total winning value is: 27,448,270,000 VND.
- The savings rate is: 4.96%.
This Bid solicitor is also an investor. The analysis results of data for the investor phòng Kinh tế thành phố Hạ Long are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 49 contractor selection plans, of which 49 were self-published, and 0 were published by other entities.
- Is the investor of 25 Tender Notices, of which 24 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey and prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for water reservoirs (Khe Chua, Ha Nung, Dong Khuon, Dong Ma) in Son Duong commune, Ha city Long of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG MH
24/02/2025 17:17
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for water reservoirs (Cai Mam, Khe Loi), Viet Hung ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG MH
24/02/2025 17:16
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Investigate surveys, prepare documents liquidation of planted forests with budget capital of the Ha Long Environmental Special Use Forest Management Board (dissolved) damaged by storm No. 3 (YAGI). of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: Đoàn Khảo sát thiết kế lâm nghiệp Quảng Ninh
22/02/2025 10:16
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the request Investigate surveys, prepare documents liquidation of planted forests with budget capital of the Ha Long Environmental Special Use Forest Management Board (dissolved) damaged by storm No. 3 (YAGI). of the investor phòng Kinh tế thành phố Hạ Long with 1 bidding package.
22/02/2025 10:10
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Buy seedlings and fertilizers to serve "Tet planting forever grateful to Uncle Ho" of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: Công ty TNHH Dịch vụ cảnh quan Vạn Hạnh 68
19/02/2025 17:02
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the request Organizing the "New Year planting Tet gratitude to Uncle Ho" Xuan At Ty in 2025 associated with planting large wooden trees, indigenous trees, restoring forests after storm No. 3 (YAGI) and responding to the project "Planting one billion trees Green period 2021-2025 ”of the Prime Minister of the investor phòng Kinh tế thành phố Hạ Long with 1 bidding package.
19/02/2025 16:43
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Khoai reservoir, Thong Nhat commune, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
19/02/2025 16:36
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Cai Tan reservoir, Tuan Chau ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: THANG LONG HYDROELECTRICITY & WATER RESOURCES CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
19/02/2025 16:36
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Ca reservoir, Ha Phong ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ PHÁT TRIỂN KỸ THUẬT TÀI NGUYÊN NƯỚC
15/02/2025 15:33
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Sung reservoir, Dai Yen ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ PHÁT TRIỂN KỸ THUẬT TÀI NGUYÊN NƯỚC
15/02/2025 15:32
The data sheet has been partially hidden, to see the full information please Login or Register
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Survey and prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for water reservoirs (Khe Chua, Ha Nung, Dong Khuon, Dong Ma) in Son Duong commune, Ha city Long .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG MH
24/02/2025 17:17
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for water reservoirs (Cai Mam, Khe Loi), Viet Hung ward, Ha Long city .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG MH
24/02/2025 17:16
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Investigate surveys, prepare documents liquidation of planted forests with budget capital of the Ha Long Environmental Special Use Forest Management Board (dissolved) damaged by storm No. 3 (YAGI). .
- Winning bidder: Đoàn Khảo sát thiết kế lâm nghiệp Quảng Ninh
22/02/2025 10:16
phòng Kinh tế thành phố Hạ Long publishes the plan Investigate surveys, prepare documents liquidation of planted forests with budget capital of the Ha Long Environmental Special Use Forest Management Board (dissolved) damaged by storm No. 3 (YAGI). with 1 bidding package .
22/02/2025 10:10
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Buy seedlings and fertilizers to serve "Tet planting forever grateful to Uncle Ho" .
- Winning bidder: Công ty TNHH Dịch vụ cảnh quan Vạn Hạnh 68
19/02/2025 17:02
phòng Kinh tế thành phố Hạ Long publishes the plan Organizing the "New Year planting Tet gratitude to Uncle Ho" Xuan At Ty in 2025 associated with planting large wooden trees, indigenous trees, restoring forests after storm No. 3 (YAGI) and responding to the project "Planting one billion trees Green period 2021-2025 ”of the Prime Minister with 1 bidding package .
19/02/2025 16:43
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Khoai reservoir, Thong Nhat commune, Ha Long city .
- Winning bidder: THANG LONG HYDROELECTRICITY & WATER RESOURCES CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
19/02/2025 16:36
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Cai Tan reservoir, Tuan Chau ward, Ha Long city .
- Winning bidder: THANG LONG HYDROELECTRICITY & WATER RESOURCES CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
19/02/2025 16:36
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Ca reservoir, Ha Phong ward, Ha Long city .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ PHÁT TRIỂN KỸ THUẬT TÀI NGUYÊN NƯỚC
15/02/2025 15:33
phòng Kinh tế thành phố Hạ Long announced the results of the bid package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Sung reservoir, Dai Yen ward, Ha Long city .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ PHÁT TRIỂN KỸ THUẬT TÀI NGUYÊN NƯỚC
15/02/2025 15:32
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey and prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for water reservoirs (Khe Chua, Ha Nung, Dong Khuon, Dong Ma) in Son Duong commune, Ha city Long of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG MH
24/02/2025 17:17
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for water reservoirs (Cai Mam, Khe Loi), Viet Hung ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ VÀ XÂY DỰNG MH
24/02/2025 17:16
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Investigate surveys, prepare documents liquidation of planted forests with budget capital of the Ha Long Environmental Special Use Forest Management Board (dissolved) damaged by storm No. 3 (YAGI). of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: Đoàn Khảo sát thiết kế lâm nghiệp Quảng Ninh
22/02/2025 10:16
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the request Investigate surveys, prepare documents liquidation of planted forests with budget capital of the Ha Long Environmental Special Use Forest Management Board (dissolved) damaged by storm No. 3 (YAGI). of the investor phòng Kinh tế thành phố Hạ Long with 1 bidding package.
22/02/2025 10:10
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Buy seedlings and fertilizers to serve "Tet planting forever grateful to Uncle Ho" of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: Công ty TNHH Dịch vụ cảnh quan Vạn Hạnh 68
19/02/2025 17:02
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the request Organizing the "New Year planting Tet gratitude to Uncle Ho" Xuan At Ty in 2025 associated with planting large wooden trees, indigenous trees, restoring forests after storm No. 3 (YAGI) and responding to the project "Planting one billion trees Green period 2021-2025 ”of the Prime Minister of the investor phòng Kinh tế thành phố Hạ Long with 1 bidding package.
19/02/2025 16:43
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Khoai reservoir, Thong Nhat commune, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
19/02/2025 16:36
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Cai Tan reservoir, Tuan Chau ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: THANG LONG HYDROELECTRICITY & WATER RESOURCES CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
19/02/2025 16:36
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Ca reservoir, Ha Phong ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ PHÁT TRIỂN KỸ THUẬT TÀI NGUYÊN NƯỚC
15/02/2025 15:33
The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted the results of the bidding package Survey, prepare reports to assess the current situation, prepare plans to respond to emergency situations and establish operating procedures for Khe Sung reservoir, Dai Yen ward, Ha Long city of the investor phòng Kinh tế thành phố Hạ Long.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ PHÁT TRIỂN KỸ THUẬT TÀI NGUYÊN NƯỚC
15/02/2025 15:32
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s phòng Kinh tế thành phố Hạ Long has posted 68 of the contractor selection plan, which contains 106 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted 24 Tender Notices in 16 bidding packages. Among these, 23 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor phòng Kinh tế thành phố Hạ Long has posted 34 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 34 package, canceled the bid 0 package (among the bidding packages above).
- There are 19 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor phòng Kinh tế thành phố Hạ Long has a relationship with 28 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor phòng Kinh tế thành phố Hạ Long has a relationship with 15 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity phòng Kinh tế thành phố Hạ Long has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects