Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Đăk Kôi as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Phòng Kinh tế xã Đăk Kôi as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Phòng Kinh tế xã Đăk Kôi are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 3 contractor selection plans, of which 0 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Phòng Kinh tế xã Đăk Kôi announced the results of the bid package Construction supervision and equipment installation .
- Winning bidder: THD KON TUM COMPANY LIMITED
14/11/2025 11:24
Phòng Kinh tế xã Đăk Kôi announced the results of the bid package Construction investment project management consulting .
- Winning bidder: CÔNG TY TNHH MTV ĐẦU TƯ VÀ XÂY DỰNG PHAN GIA PHÁT KON TUM
14/11/2025 11:04
Phòng Kinh tế xã Đăk Kôi announced the results of the bid package Consulting and verifying design documents for BVTC-TDT .
- Winning bidder: VINH PHAT KON TUM COMPANY LIMITED
14/11/2025 10:55
Phòng Kinh tế xã Đăk Kôi announced the results of the bid package Consulting, designing, preparing technical and economic reports .
- Winning bidder: THD KON TUM COMPANY LIMITED
14/11/2025 10:35
Phòng Kinh tế xã Đăk Kôi publishes the plan Approval of the project contractor selection plan: Project to repair and restore historical revolutionary relics at District Party Committee H16 base with 2 bidding package .
31/10/2025 10:50
Phòng Kinh tế xã Đăk Kôi announced the results of the bid package Repairing Dak To Lung Secondary School - Dak To Lung Secondary School .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN NGUYÊN KHANG
28/10/2025 10:51
Phòng Kinh tế xã Đăk Kôi publishes the plan Repairing Dak To Lung Secondary School - Dak To Lung Secondary School with 1 bidding package .
23/10/2025 16:24
Investor Phòng Kinh tế xã Đăk Kôi has posted an investment and development project Repairing Dak To Lung Secondary School - Dak To Lung Secondary School.
23/10/2025 16:16
Phòng Kinh tế xã Đăk Kôi publishes the plan Contractor selection plan (investment preparation phase) under the Project to repair and restore historical revolutionary relics at District Party Committee H16 base with 3 bidding package .
22/10/2025 17:00
Investor Phòng Kinh tế xã Đăk Kôi has posted an investment and development project Project to repair and restore historical revolutionary relics at District Party Committee base H16.
22/10/2025 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Phòng Kinh tế xã Đăk Kôi has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Phòng Kinh tế xã Đăk Kôi has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects