Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Phòng Quản Lý Đô Thị as follows:
- Has relationships with 33 contractor.
- Announced 131 investment development project, of which 18 projects have not yet announced the prequalification documents.
- Announced 63 contractor selection plans with a total of 199 bidding packages, of which 44 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 55 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 55 packages with results that do not have tender notice or prequalification notice.
- There are 146 packages that have not fully posted the contractor selection results. Of these 137 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 16.67%, Consultancy 83.33%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 237,082,725,003 VND, of which the total winning bid value is: 236,697,771,143 VND.
- The savings rate is: 0.16%.
Data analysis results of DauThau.info software for bid solicitors Phòng Quản Lý Đô Thị as follows:
- Has relationships with 33 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 16.67%, Consulting 83.33%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 237,082,725,003 VND, in which the total winning value is: 236,697,771,143 VND.
- The savings rate is: 0.16%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 131 investment and development projects.
- As the owner of 184 Contractor selection plan in which 38 Contractor selection plan is self-published, and 146 Contractor selection plan is posted by other units.
- Being the investor of 119 bidding packages in which 3 packages are self-invited, and 116 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Maintenance and patching of Vinh Loi road (DH 409) in Tan Uyen city of the investor Phòng Quản Lý Đô Thị with 3 bidding package.
12/09/2024 16:08
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Maintenance and patching of Trinh Hoai Duc street (DH 418), Khanh Binh ward, Tan Uyen city of the investor Phòng Quản Lý Đô Thị with 2 bidding package.
12/09/2024 15:54
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Treating the structure of Le Quang Dinh road base (DH 406) with plastic extrusion - intersection area (3-way intersection, 4-way intersection) with traffic signal lights, Khanh Binh ward of the investor Phòng Quản Lý Đô Thị with 2 bidding package.
12/09/2024 15:47
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Maintenance and patching of Nguyen Khuyen street (DH 423) from intersection 4 of Ben San church to intersection 4 of Ba Tri, Tan Hiep ward, Tan Uyen city of the investor Phòng Quản Lý Đô Thị with 2 bidding package.
12/09/2024 15:35
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Prepare a proposal to recognize Tan Uyen city as a class II urban area of the investor Phòng Quản Lý Đô Thị with 3 bidding package.
05/09/2024 15:27
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Adjustment of subdivision planning of 06 wards: Uyen Hung, Khanh Binh, Tan Phuoc Khanh, Thai Hoa, Thanh Phuoc, Tan Hiep of the investor Phòng Quản Lý Đô Thị with 20 bidding package.
30/08/2024 17:19
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Planning subdivision 04 wards: Phu Chanh, Vinh Tan, Tan Vinh Hiep, Hoi Nghia of the investor Phòng Quản Lý Đô Thị with 16 bidding package.
30/08/2024 16:28
Phòng Quản Lý Đô Thị Posted Development Investment Project Installing sewers (section from Mr. Nguyen Van Den's land through all residential areas) Phu Bung neighborhood, Phu Chanh ward.
19/08/2024 11:11
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Upgrading plastic carpet, embellishing DH 420 (Nguyen Huu Canh Street) from Cay Queo slope to Bayer Company intersection of the investor Phòng Quản Lý Đô Thị with 5 bidding package.
16/08/2024 15:51
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Maintain and repair urban roads in the city of the investor Phòng Quản Lý Đô Thị with 4 bidding package.
13/08/2024 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
Phòng Quản Lý Đô Thị publishes the plan Project: Maintenance and patching of Vinh Loi road (DH 409) in Tan Uyen city with 3 bidding package .
12/09/2024 16:08
Phòng Quản Lý Đô Thị publishes the plan Project: Maintenance and patching of Trinh Hoai Duc street (DH 418), Khanh Binh ward, Tan Uyen city with 2 bidding package .
12/09/2024 15:54
Phòng Quản Lý Đô Thị publishes the plan Project: Treating the structure of Le Quang Dinh road base (DH 406) with plastic extrusion - intersection area (3-way intersection, 4-way intersection) with traffic signal lights, Khanh Binh ward with 2 bidding package .
12/09/2024 15:47
Phòng Quản Lý Đô Thị publishes the plan Project: Maintenance and patching of Nguyen Khuyen street (DH 423) from intersection 4 of Ben San church to intersection 4 of Ba Tri, Tan Hiep ward, Tan Uyen city with 2 bidding package .
12/09/2024 15:35
Phòng Quản Lý Đô Thị publishes the plan Prepare a proposal to recognize Tan Uyen city as a class II urban area with 3 bidding package .
05/09/2024 15:27
Phòng Quản Lý Đô Thị publishes the plan Adjustment of subdivision planning of 06 wards: Uyen Hung, Khanh Binh, Tan Phuoc Khanh, Thai Hoa, Thanh Phuoc, Tan Hiep with 20 bidding package .
30/08/2024 17:19
Phòng Quản Lý Đô Thị publishes the plan Planning subdivision 04 wards: Phu Chanh, Vinh Tan, Tan Vinh Hiep, Hoi Nghia with 16 bidding package .
30/08/2024 16:28
Phòng Quản Lý Đô Thị publishes the plan Upgrading plastic carpet, embellishing DH 420 (Nguyen Huu Canh Street) from Cay Queo slope to Bayer Company intersection with 5 bidding package .
16/08/2024 15:51
Phòng Quản Lý Đô Thị publishes the plan Maintain and repair urban roads in the city with 4 bidding package .
13/08/2024 14:07
Phòng Quản Lý Đô Thị publishes the plan Renovating and repairing urban roads in the city with 4 bidding package .
13/08/2024 14:06
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Maintenance and patching of Vinh Loi road (DH 409) in Tan Uyen city of the investor Phòng Quản Lý Đô Thị with 3 bidding package.
12/09/2024 16:08
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Maintenance and patching of Trinh Hoai Duc street (DH 418), Khanh Binh ward, Tan Uyen city of the investor Phòng Quản Lý Đô Thị with 2 bidding package.
12/09/2024 15:54
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Treating the structure of Le Quang Dinh road base (DH 406) with plastic extrusion - intersection area (3-way intersection, 4-way intersection) with traffic signal lights, Khanh Binh ward of the investor Phòng Quản Lý Đô Thị with 2 bidding package.
12/09/2024 15:47
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Project: Maintenance and patching of Nguyen Khuyen street (DH 423) from intersection 4 of Ben San church to intersection 4 of Ba Tri, Tan Hiep ward, Tan Uyen city of the investor Phòng Quản Lý Đô Thị with 2 bidding package.
12/09/2024 15:35
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Prepare a proposal to recognize Tan Uyen city as a class II urban area of the investor Phòng Quản Lý Đô Thị with 3 bidding package.
05/09/2024 15:27
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Adjustment of subdivision planning of 06 wards: Uyen Hung, Khanh Binh, Tan Phuoc Khanh, Thai Hoa, Thanh Phuoc, Tan Hiep of the investor Phòng Quản Lý Đô Thị with 20 bidding package.
30/08/2024 17:19
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Planning subdivision 04 wards: Phu Chanh, Vinh Tan, Tan Vinh Hiep, Hoi Nghia of the investor Phòng Quản Lý Đô Thị with 16 bidding package.
30/08/2024 16:28
Phòng Quản Lý Đô Thị Posted Development Investment Project Installing sewers (section from Mr. Nguyen Van Den's land through all residential areas) Phu Bung neighborhood, Phu Chanh ward.
19/08/2024 11:11
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Upgrading plastic carpet, embellishing DH 420 (Nguyen Huu Canh Street) from Cay Queo slope to Bayer Company intersection of the investor Phòng Quản Lý Đô Thị with 5 bidding package.
16/08/2024 15:51
The Bid solicitor Phòng Quản Lý Đô Thị has posted the request Maintain and repair urban roads in the city of the investor Phòng Quản Lý Đô Thị with 4 bidding package.
13/08/2024 14:07
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Phòng Quản Lý Đô Thị has posted 63 of the contractor selection plan, which contains 199 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Phòng Quản Lý Đô Thị has posted 6 Tender Notice in the 5 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Phòng Quản Lý Đô Thị has posted 55 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 55 package, canceled the bid 0 package (among the bidding packages above).
- There are 55 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Phòng Quản Lý Đô Thị has a relationship with 33 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Quản Lý Đô Thị has a relationship with 47 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Quản Lý Đô Thị is the investor of 119 package, of which 3 package is self-invited, other units invite bid 116 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Quản Lý Đô Thị is the owner of 184 contractor selection plan. In which, they self-invite 38 of contractor selection plan, other units invite bids of 146 of contractor selection plan.
Summary: Investor Phòng Quản Lý Đô Thị is an investor with 120 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Quản Lý Đô Thị is the investor of 131 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code