Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Phòng Tài nguyên và Môi trường huyện Chợ Đồn as follows:
- Has relationships with 7 contractor.
- Announced 4 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 25 contractor selection plans with a total of 32 bidding packages, of which 19 prequalification documents have not found the investment project.
- Has invited bids for 13 packages (with 16 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 23 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 11 packages with results that do not have tender notice or prequalification notice.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.17 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 12.50%, Non-consultancy 87.50%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 22,443,271,850 VND, of which the total winning bid value is: 21,758,554,137 VND.
- The savings rate is: 3.05%.
Data analysis results of DauThau.info software for bid solicitors Phòng Tài nguyên và Môi trường huyện Chợ Đồn as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 1.17 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 12.50%, Non-consulting 87.50%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 22,443,271,850 VND, in which the total winning value is: 21,758,554,137 VND.
- The savings rate is: 3.05%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 19 Contractor selection plan in which 19 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 13 bidding packages in which 13 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Consulting on specific land prices to calculate land clearance fees Project: Pac Nghien reservoir, Binh Trung commune (Phase 1) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
28/09/2024 10:58
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Determining specific land prices as a basis for calculating site clearance compensation Project: Restoration and repair of Na Pau historical relic, Luong Bang commune, Cho Don district, Bac Kan province of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
17/09/2024 16:08
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating site clearance compensation. Project: Pac Nghien Reservoir, Binh Trung Commune (Phase 1) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
17/09/2024 15:56
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance Project: Restoration and repair of Na Pau historical relic, Luong Bang commune, Cho Don district, Bac province Kan of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
10/09/2024 16:41
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Select a contractor to determine land prices
Specifically, as a basis for calculating compensation for site clearance of the project: Construction of Bac Kan city - Ba Be Lake connecting to Na Hang, Tuyen Quang (section in Xuan Lac commune, Cho Don - Lan district). 3) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
18/07/2024 09:18
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance for the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section located in Xuan Lac commune, Cho Don district - 3rd time) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
09/07/2024 07:56
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package n determine specific land prices as a basis for calculating compensation for site clearance of the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section of the route in the territory of Nam communes Cuong, Xuan Lac, Cho Don district - 2nd time of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
08/05/2024 17:48
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance for the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section route in the areas of Nam Cuong and Xuan Lac communes, Cho Don district - 2nd time) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
08/05/2024 17:40
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Acceptance testing of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
02/02/2024 14:33
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Consulting on adjusting Land Use Planning to 2030 and Land Use Plan for the first year of adjusting Cho Don district land use planning of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Mountainous Resources Environment Center
25/12/2023 14:23
The data sheet has been partially hidden, to see the full information please Login or Register
Phòng Tài nguyên và Môi trường huyện Chợ Đồn announced the results of the bid package Consulting on specific land prices to calculate land clearance fees Project: Pac Nghien reservoir, Binh Trung commune (Phase 1) .
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
28/09/2024 10:58
Phòng Tài nguyên và Môi trường huyện Chợ Đồn announced the results of the bid package Determining specific land prices as a basis for calculating site clearance compensation Project: Restoration and repair of Na Pau historical relic, Luong Bang commune, Cho Don district, Bac Kan province .
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
17/09/2024 16:08
Phòng Tài nguyên và Môi trường huyện Chợ Đồn publishes the plan Plan for selecting a contractor to determine specific land prices as a basis for calculating site clearance compensation. Project: Pac Nghien Reservoir, Binh Trung Commune (Phase 1) with 1 bidding package .
17/09/2024 15:56
Phòng Tài nguyên và Môi trường huyện Chợ Đồn publishes the plan Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance Project: Restoration and repair of Na Pau historical relic, Luong Bang commune, Cho Don district, Bac province Kan with 1 bidding package .
10/09/2024 16:41
Phòng Tài nguyên và Môi trường huyện Chợ Đồn announced the results of the bid package Select a contractor to determine land prices
Specifically, as a basis for calculating compensation for site clearance of the project: Construction of Bac Kan city - Ba Be Lake connecting to Na Hang, Tuyen Quang (section in Xuan Lac commune, Cho Don - Lan district). 3) .
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
18/07/2024 09:18
Phòng Tài nguyên và Môi trường huyện Chợ Đồn publishes the plan Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance for the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section located in Xuan Lac commune, Cho Don district - 3rd time) with 1 bidding package .
09/07/2024 07:56
Phòng Tài nguyên và Môi trường huyện Chợ Đồn announced the results of the bid package n determine specific land prices as a basis for calculating compensation for site clearance of the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section of the route in the territory of Nam communes Cuong, Xuan Lac, Cho Don district - 2nd time .
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
08/05/2024 17:48
Phòng Tài nguyên và Môi trường huyện Chợ Đồn publishes the plan Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance for the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section route in the areas of Nam Cuong and Xuan Lac communes, Cho Don district - 2nd time) with 1 bidding package .
08/05/2024 17:40
Phòng Tài nguyên và Môi trường huyện Chợ Đồn announced the results of the bid package Acceptance testing .
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
02/02/2024 14:33
Phòng Tài nguyên và Môi trường huyện Chợ Đồn announced the results of the bid package Consulting on adjusting Land Use Planning to 2030 and Land Use Plan for the first year of adjusting Cho Don district land use planning .
- Winning bidder: Mountainous Resources Environment Center
25/12/2023 14:23
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Consulting on specific land prices to calculate land clearance fees Project: Pac Nghien reservoir, Binh Trung commune (Phase 1) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
28/09/2024 10:58
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Determining specific land prices as a basis for calculating site clearance compensation Project: Restoration and repair of Na Pau historical relic, Luong Bang commune, Cho Don district, Bac Kan province of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
17/09/2024 16:08
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating site clearance compensation. Project: Pac Nghien Reservoir, Binh Trung Commune (Phase 1) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
17/09/2024 15:56
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance Project: Restoration and repair of Na Pau historical relic, Luong Bang commune, Cho Don district, Bac province Kan of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
10/09/2024 16:41
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Select a contractor to determine land prices
Specifically, as a basis for calculating compensation for site clearance of the project: Construction of Bac Kan city - Ba Be Lake connecting to Na Hang, Tuyen Quang (section in Xuan Lac commune, Cho Don - Lan district). 3) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
18/07/2024 09:18
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance for the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section located in Xuan Lac commune, Cho Don district - 3rd time) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
09/07/2024 07:56
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package n determine specific land prices as a basis for calculating compensation for site clearance of the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section of the route in the territory of Nam communes Cuong, Xuan Lac, Cho Don district - 2nd time of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
08/05/2024 17:48
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the request Plan for selecting a contractor to determine specific land prices as a basis for calculating compensation for site clearance for the project: Construction of Bac Kan city - Ba Be Lake route connecting to Na Hang, Tuyen Quang (section route in the areas of Nam Cuong and Xuan Lac communes, Cho Don district - 2nd time) of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn with 1 bidding package.
08/05/2024 17:40
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Acceptance testing of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Trung tâm Kỹ thuật tài nguyên và môi trường tỉnh Bắc Kạn.
02/02/2024 14:33
The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted the results of the bidding package Consulting on adjusting Land Use Planning to 2030 and Land Use Plan for the first year of adjusting Cho Don district land use planning of the investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn.
- Winning bidder: Mountainous Resources Environment Center
25/12/2023 14:23
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted 25 of the contractor selection plan, which contains 32 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted 16 Tender Notice in the 13 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has posted 23 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 23 package, canceled the bid 0 package (among the bidding packages above).
- There are 11 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn is the investor of 13 package, of which 13 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn is the owner of 19 contractor selection plan. In which, they self-invite 19 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn is an investor with 7 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Phòng Tài nguyên và Môi trường huyện Chợ Đồn is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code