Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City as follows:
- Has relationships with 5 project owners.
- Has relationships with 317 contractor.
- Announced 227 investment development project, of which 22 projects have not yet announced the prequalification documents.
- Announced 376 contractor selection plans with a total of 2204 bidding packages, of which 72 prequalification documents have not found the investment project.
- Has invited bids for 479 packages (with 519 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 814 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 704 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1331 packages that have not fully posted the contractor selection results. Of these 1315 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.73 contractors.
- Breakdown by bidding field: Goods 29.67%, Construction 49.90%, Consultancy 9.63%, Non-consultancy 4.05%, Mixed 4.05%, Other fields 2.7%.
- The total value according to the packages with valid contractor selection results is: 2,291,082,132,933 VND, of which the total winning bid value is: 2,224,298,820,354 VND.
- The savings rate is: 2.91%.
Data analysis results of DauThau.info software for bid solicitors Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City as follows:
- Has relationships with 317 contractor.
- The average number of contractors participating in each bidding package is: 2.73 contractors.
- Proportion of bidding fields: Goods 29.67%, Construction 49.90%, Consulting 9.63%, Non-consulting 4.05%, Mixed 4.05%, Other 2.7%.
- The total value according to the bidding package with valid IMP is: 2,291,082,132,933 VND, in which the total winning value is: 2,224,298,820,354 VND.
- The savings rate is: 2.91%.
This Bid solicitor is also an investor. The analysis results of data for the investor Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City are as follows:
- Is the investor of 227 development investment projects.
- Is the investor of 290 contractor selection plans, of which 226 were self-published, and 64 were published by other entities.
- Is the investor of 250 Tender Notices, of which 69 were self-invited, and 181 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 4 bidding packages, of which 4 were won, 0 were lost, 0 are pending results, and 0 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 72.2% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.91% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Cần Thơ (1), Undefined (3)
- Provinces before the merger where the contractor has participated in bidding : Hậu Giang (1), Undefined (3)
- Has relationships with 3 Bid Solicitors
- Has competed against 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Has collaborated with 0 contractors in 0 bidding packages, won 0 packages, lost 0 packages, 0 are pending results, and 0 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 4 bidding packages with 4 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 02: Topographic survey supervision consultancy for the stage of preparing the Feasibility Study Report .
- Winning bidder: CÔNG TY TNHH TƯ VẤN KIẾN TRÚC XÂY DỰNG KIẾN HƯNG
07/01/2026 10:41
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 01: Topographic survey consulting for the stage of preparing the Feasibility Study Report .
- Winning bidder: Viện Quy hoạch xây dựng
07/01/2026 10:02
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 05: Advice on making reports on environmental licensing proposals .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM
07/01/2026 09:29
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City publishes the plan Regarding approval for adjusting the contractor selection plan for bidding packages implemented before the decision to approve the project under the project: Resettlement area (Area D) - Lo Vong Cung Can Tho historical relic area with 5 bidding package .
07/01/2026 09:02
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 05: Consulting on preparing Environmental Registration Report .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM
06/01/2026 14:28
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Bidding package No. 03: Establishing tasks and adjusted planning projects .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
02/01/2026 14:15
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Bidding Package No. 05: Consulting on preparation of bidding documents and evaluation of bidding documents for Bidding Package No. 01 .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MTV XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ STD
31/12/2025 15:29
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Bidding Package No. 06: Consulting on appraisal of bidding documents, appraisal of contractor selection results Bidding Package No. 01 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG XUÂN LỘC
31/12/2025 15:27
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City publishes the plan Plan for selecting contractors for bidding packages implemented before the Decision approving the project: Investment in facilities for the education and training sector in Long Phu district (now communes: Truong Khanh, Dai Ngai, Tan Thanh, Long Phu). with 7 bidding package .
31/12/2025 13:38
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City publishes the plan Regarding approval of adjustments to the Contractor Selection Plan for bidding packages implemented before the decision to approve the project: Phong Dien Resettlement Area (phase 2) with 5 bidding package .
29/12/2025 10:43
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Consulting to appraise bidding documents, results of construction contractors .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG XUÂN LỘC
19/12/2025 09:28
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Consultancy on preparation of bidding documents, evaluation of construction bids .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẤU THẦU XÂY DỰNG TÂN HIỆP
19/12/2025 09:15
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Equipment installation supervision consulting .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG - THƯƠNG MẠI - DỊCH VỤ HƯNG THỊNH
19/12/2025 09:09
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG - THƯƠNG MẠI - DỊCH VỤ HƯNG THỊNH
19/12/2025 08:38
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Static compression testing experiment .
- Winning bidder: CÔNG TY TNHH MTV TM DV ĐẠT LAM
19/12/2025 08:32
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Equipment cost appraisal .
- Winning bidder: TAM WIN CONSULTING AND VALUATION JOINT STOCK COMPANY
19/12/2025 08:25
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Equipment supply and installation insurance (additional) .
- Winning bidder: BaoViet Insurance Corporation
30/11/2025 20:20
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Consulting and supervision of equipment supply and installation (additional) .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN XÂY DỰNG MEKONG HẬU GIANG
30/11/2025 20:17
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City publishes the plan Project contractor selection plan: Table equipment, student chairs for teaching and learning at all levels with 16 bidding package .
30/11/2025 20:11
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Bidding package 15: Supervision of installation of equipment package No. 17 .
- Winning bidder: MIEN NAM CONSULTING INVESTMENT DEVELOPMENT CONSTRUCTION JOINT STOCK COMPANY
07/11/2025 16:41
The data sheet has been partially hidden, to see the full information please Login or Register
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 02: Topographic survey supervision consultancy for the stage of preparing the Feasibility Study Report .
- Winning bidder: CÔNG TY TNHH TƯ VẤN KIẾN TRÚC XÂY DỰNG KIẾN HƯNG
07/01/2026 10:41
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 01: Topographic survey consulting for the stage of preparing the Feasibility Study Report .
- Winning bidder: Viện Quy hoạch xây dựng
07/01/2026 10:02
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 05: Advice on making reports on environmental licensing proposals .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM
07/01/2026 09:29
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City publishes the plan Regarding approval for adjusting the contractor selection plan for bidding packages implemented before the decision to approve the project under the project: Resettlement area (Area D) - Lo Vong Cung Can Tho historical relic area with 5 bidding package .
07/01/2026 09:02
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Package No. 05: Consulting on preparing Environmental Registration Report .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CÔNG NGHỆ MÔI TRƯỜNG CDM
06/01/2026 14:28
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Bidding package No. 03: Establishing tasks and adjusted planning projects .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG KHÁNH HƯNG
02/01/2026 14:15
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Bidding Package No. 05: Consulting on preparation of bidding documents and evaluation of bidding documents for Bidding Package No. 01 .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN MTV XÂY DỰNG THƯƠNG MẠI VÀ DỊCH VỤ STD
31/12/2025 15:29
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City announced the results of the bid package Bidding Package No. 06: Consulting on appraisal of bidding documents, appraisal of contractor selection results Bidding Package No. 01 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ XÂY DỰNG XUÂN LỘC
31/12/2025 15:27
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City publishes the plan Plan for selecting contractors for bidding packages implemented before the Decision approving the project: Investment in facilities for the education and training sector in Long Phu district (now communes: Truong Khanh, Dai Ngai, Tan Thanh, Long Phu). with 7 bidding package .
31/12/2025 13:38
Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City publishes the plan Regarding approval of adjustments to the Contractor Selection Plan for bidding packages implemented before the decision to approve the project: Phong Dien Resettlement Area (phase 2) with 5 bidding package .
29/12/2025 10:43
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City has posted 376 of the contractor selection plan, which contains 2204 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City has posted 519 Tender Notices in 479 bidding packages. Among these, 433 Tender Notices were self-invited, and 86 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City has posted 814 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 814 package, canceled the bid 0 package (among the bidding packages above).
- There are 704 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City has a relationship with 317 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City has a relationship with 31 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Project Management Board for Investment in Civil and Industrial Construction of Cần Thơ City has a relationship with 10 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects