Data analysis results of DauThau.info software for bid solicitors Quang Binh TIIG II PMU as follows:
- Has relationships with 20 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 18 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 4 tender notices), and conducted prequalification for 1 packages.
- Announced the results of 17 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 4.67 contractors.
- Breakdown by bidding field: Goods 0%, Construction 75.00%, Consultancy 25.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 238,893,927,692 VND, of which the total winning bid value is: 212,126,731,994 VND.
- The savings rate is: 11.20%.
Data analysis results of DauThau.info software for bid solicitors Quang Binh TIIG II PMU as follows:
- Has relationships with 20 contractor.
- The average number of contractors participating in each bidding package is: 4.67 contractors.
- Proportion of bidding fields: Goods 0%, Construction 75.00%, Consulting 25.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 238,893,927,692 VND, in which the total winning value is: 212,126,731,994 VND.
- The savings rate is: 11.20%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 4 Contractor selection plan in which 4 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 1 bidding packages in which 1 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU.
- Winning bidder: NO 471 JOINT STOCK COMPANY
18/12/2023 20:19
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU with the form Open bidding.
14/09/2023 08:22
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package No. 14 (TIIGP2-VIE-C08): Construction supervision of the investor Quang Binh TIIG II PMU.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng và Phát triển Hạ tầng Thăng Long
27/04/2023 00:00
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package 16: Quality inspection of works of the investor Quang Binh TIIG II PMU.
- Winning bidder: Quang Binh Construction Quality Control Center
21/04/2023 11:23
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU with the form Competitive Bidding.
03/03/2023 10:57
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 16: Quality inspection of works of the investor Quang Binh TIIG II PMU with the form Open bidding.
09/02/2023 15:07
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU with the form Competitive Bidding.
30/01/2023 17:05
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package No. 13 (TIIGP2-VIE-C09): Independent audit of the investor Quang Binh TIIG II PMU.
- Winning bidder: Công ty TNHH Mazars Việt Nam
31/08/2022 00:00
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package 18: Evaluation of bidding documents, results of LCNT of bidding packages: Independent audit; Construction supervision; Construction quality inspection; Improved access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU.
- Winning bidder: Công ty TNHH tư vấn và xây dựng tổng hợp Khánh Sang
23/06/2022 00:00
The Bid solicitor Quang Binh TIIG II PMU has posted the request Decision No. 595/QD-UBND dated March 8, 2022 of the People's Committee of Quang Binh province approving the adjustment of the contractor selection plan under the Project of developing tourism infrastructure to support comprehensive growth of the investor Quang Binh TIIG II PMU with 5 bidding package.
21/03/2022 15:30
The data sheet has been partially hidden, to see the full information please Login or Register
Quang Binh TIIG II PMU announced the results of the bid package Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai .
- Winning bidder: NO 471 JOINT STOCK COMPANY
18/12/2023 20:19
Quang Binh TIIG II PMU announced the results of the bidding package Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai with 4 participating contractors .
15/10/2023 15:32
Quang Binh TIIG II PMU publishes Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai in the form Open bidding .
14/09/2023 08:22
Quang Binh TIIG II PMU announced the results of the bid package Package No. 14 (TIIGP2-VIE-C08): Construction supervision .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN VÀ CÔNG NGHỆ DST, Công ty Cổ phần Tư vấn Xây dựng và Phát triển Hạ tầng Thăng Long
27/04/2023 00:00
Quang Binh TIIG II PMU announced the results of the bid package Package 16: Quality inspection of works .
- Winning bidder: Quang Binh Construction Quality Control Center
21/04/2023 11:23
Quang Binh TIIG II PMU announced the results of the bidding package Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai with 3 participating contractors .
16/03/2023 14:33
Quang Binh TIIG II PMU publishes Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai in the form Competitive Bidding .
03/03/2023 10:57
Quang Binh TIIG II PMU announced the results of the bidding package Package 16: Quality inspection of works with 1 participating contractors .
02/03/2023 09:17
Quang Binh TIIG II PMU publishes Tender Notice Package 16: Quality inspection of works in the form Open bidding .
09/02/2023 15:07
Quang Binh TIIG II PMU publishes Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai in the form Competitive Bidding .
30/01/2023 17:05
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU.
- Winning bidder: NO 471 JOINT STOCK COMPANY
18/12/2023 20:19
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU with the form Open bidding.
14/09/2023 08:22
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package No. 14 (TIIGP2-VIE-C08): Construction supervision of the investor Quang Binh TIIG II PMU.
- Winning bidder: Công ty Cổ phần Tư vấn Xây dựng và Phát triển Hạ tầng Thăng Long
27/04/2023 00:00
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package 16: Quality inspection of works of the investor Quang Binh TIIG II PMU.
- Winning bidder: Quang Binh Construction Quality Control Center
21/04/2023 11:23
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU with the form Competitive Bidding.
03/03/2023 10:57
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 16: Quality inspection of works of the investor Quang Binh TIIG II PMU with the form Open bidding.
09/02/2023 15:07
Bid solicitor Quang Binh TIIG II PMU has posted Tender Notice Package 15 (TIIGP2-VIE-W04): Improving access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU with the form Competitive Bidding.
30/01/2023 17:05
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package No. 13 (TIIGP2-VIE-C09): Independent audit of the investor Quang Binh TIIG II PMU.
- Winning bidder: Công ty TNHH Mazars Việt Nam
31/08/2022 00:00
The Bid solicitor Quang Binh TIIG II PMU has posted the results of the bidding package Package 18: Evaluation of bidding documents, results of LCNT of bidding packages: Independent audit; Construction supervision; Construction quality inspection; Improved access to roads and rivers Nhat Le - Long Dai of the investor Quang Binh TIIG II PMU.
- Winning bidder: Công ty TNHH tư vấn và xây dựng tổng hợp Khánh Sang
23/06/2022 00:00
The Bid solicitor Quang Binh TIIG II PMU has posted the request Decision No. 595/QD-UBND dated March 8, 2022 of the People's Committee of Quang Binh province approving the adjustment of the contractor selection plan under the Project of developing tourism infrastructure to support comprehensive growth of the investor Quang Binh TIIG II PMU with 5 bidding package.
21/03/2022 15:30
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Quang Binh TIIG II PMU has posted 7 of the contractor selection plan, which contains 18 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quang Binh TIIG II PMU posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Quang Binh TIIG II PMU has posted 4 Tender Notice in the 3 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quang Binh TIIG II PMU has posted 17 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 17 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Quang Binh TIIG II PMU has a relationship with 20 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quang Binh TIIG II PMU has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quang Binh TIIG II PMU is the investor of 1 package, of which 1 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quang Binh TIIG II PMU is the owner of 4 contractor selection plan. In which, they self-invite 4 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Quang Binh TIIG II PMU is an investor with 17 contractor. The data sheet has been partially hidden, to see the full information please Login or Register