Data analysis results of DauThau.info software for bid solicitors Quỹ Đầu tư phát triển tỉnh Long An as follows:
- Has relationships with 10 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 5 contractor selection plans with a total of 9 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,638,445,000 VND, of which the total winning bid value is: 1,545,614,000 VND.
- The savings rate is: 5.67%.
Data analysis results of DauThau.info software for bid solicitors Quỹ Đầu tư phát triển tỉnh Long An as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,638,445,000 VND, in which the total winning value is: 1,545,614,000 VND.
- The savings rate is: 5.67%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 4 investment and development projects.
- As the owner of 5 Contractor selection plan in which 5 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 1 bidding packages in which 0 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Update and upgrade the accounting software of Long An Provincial Investment and Development Fund of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: FAST SOFTWARE JOINT STOCK COMPANY
23/10/2024 10:54
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the request Plan for selecting contractors for the package of updating and upgrading accounting software of Long An Provincial Development Investment Fund of the investor Quỹ Đầu tư phát triển tỉnh Long An with 1 bidding package.
15/10/2024 16:07
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Verification consultant of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: Trung tâm Kiểm định chất lượng công trình giao thông
06/10/2024 13:51
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Cost audit of the investor Quỹ Đầu tư phát triển tỉnh Long An.
03/10/2024 10:38
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: LONG AN CONSULTANT TRANSPORT CONTRUCTION JOINT STOCK COMPANY
03/10/2024 10:38
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the request Contractor selection plan for the project preparation phase to prepare a technical and economic report for the project Repairing technical infrastructure of Duc Hoa Ha Industrial Complex of the investor Quỹ Đầu tư phát triển tỉnh Long An with 2 bidding package.
25/09/2024 09:48
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Renovations repair of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: HKD CƠ SỞ QUẢNG CÁO QUANG TRỌNG
12/09/2024 09:52
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Supervision consultancy of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC THIÊN_L.A
12/09/2024 09:49
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the request Adjusting the contractor selection plan for the investment project to embellish Duc Hoa Dong Industrial Cluster, Duc Hoa district of the investor Quỹ Đầu tư phát triển tỉnh Long An with 1 bidding package.
16/08/2024 09:03
Quỹ Đầu tư phát triển tỉnh Long An Posted Development Investment Project Renovate Duc Hoa Dong Industrial Cluster, Duc Hoa district.
16/08/2024 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
Quỹ Đầu tư phát triển tỉnh Long An announced the results of the bid package Update and upgrade the accounting software of Long An Provincial Investment and Development Fund .
- Winning bidder: FAST SOFTWARE JOINT STOCK COMPANY
23/10/2024 10:54
Quỹ Đầu tư phát triển tỉnh Long An publishes the plan Plan for selecting contractors for the package of updating and upgrading accounting software of Long An Provincial Development Investment Fund with 1 bidding package .
15/10/2024 16:07
Quỹ Đầu tư phát triển tỉnh Long An announced the results of the bid package Verification consultant .
- Winning bidder: Trung tâm Kiểm định chất lượng công trình giao thông
06/10/2024 13:51
Quỹ Đầu tư phát triển tỉnh Long An announced the results of the bid package Cost audit .
- Winning bidder: VIET AUSTRALIA AUDITING COMPANY LIMITED
03/10/2024 10:38
Quỹ Đầu tư phát triển tỉnh Long An announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: LONG AN CONSULTANT TRANSPORT CONTRUCTION JOINT STOCK COMPANY
03/10/2024 10:38
Quỹ Đầu tư phát triển tỉnh Long An publishes the plan Contractor selection plan for the project preparation phase to prepare a technical and economic report for the project Repairing technical infrastructure of Duc Hoa Ha Industrial Complex with 2 bidding package .
25/09/2024 09:48
Quỹ Đầu tư phát triển tỉnh Long An announced the results of the bid package Renovations repair .
- Winning bidder: HKD CƠ SỞ QUẢNG CÁO QUANG TRỌNG
12/09/2024 09:52
Quỹ Đầu tư phát triển tỉnh Long An announced the results of the bid package Supervision consultancy .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC THIÊN_L.A
12/09/2024 09:49
Quỹ Đầu tư phát triển tỉnh Long An publishes the plan Adjusting the contractor selection plan for the investment project to embellish Duc Hoa Dong Industrial Cluster, Duc Hoa district with 1 bidding package .
16/08/2024 09:03
Quỹ Đầu tư phát triển tỉnh Long An publishes the plan Plan for selecting contractors for the project of renovating and repairing the headquarters of Long An Provincial Investment and Development Fund with 2 bidding package .
15/08/2024 07:48
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Update and upgrade the accounting software of Long An Provincial Investment and Development Fund of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: FAST SOFTWARE JOINT STOCK COMPANY
23/10/2024 10:54
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the request Plan for selecting contractors for the package of updating and upgrading accounting software of Long An Provincial Development Investment Fund of the investor Quỹ Đầu tư phát triển tỉnh Long An with 1 bidding package.
15/10/2024 16:07
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Verification consultant of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: Trung tâm Kiểm định chất lượng công trình giao thông
06/10/2024 13:51
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Cost audit of the investor Quỹ Đầu tư phát triển tỉnh Long An.
03/10/2024 10:38
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Consultantcy on surveying, preparing finance and technical reports of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: LONG AN CONSULTANT TRANSPORT CONTRUCTION JOINT STOCK COMPANY
03/10/2024 10:38
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the request Contractor selection plan for the project preparation phase to prepare a technical and economic report for the project Repairing technical infrastructure of Duc Hoa Ha Industrial Complex of the investor Quỹ Đầu tư phát triển tỉnh Long An with 2 bidding package.
25/09/2024 09:48
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Renovations repair of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: HKD CƠ SỞ QUẢNG CÁO QUANG TRỌNG
12/09/2024 09:52
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the results of the bidding package Supervision consultancy of the investor Quỹ Đầu tư phát triển tỉnh Long An.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN PHÚC THIÊN_L.A
12/09/2024 09:49
The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted the request Adjusting the contractor selection plan for the investment project to embellish Duc Hoa Dong Industrial Cluster, Duc Hoa district of the investor Quỹ Đầu tư phát triển tỉnh Long An with 1 bidding package.
16/08/2024 09:03
Quỹ Đầu tư phát triển tỉnh Long An Posted Development Investment Project Renovate Duc Hoa Dong Industrial Cluster, Duc Hoa district.
16/08/2024 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Quỹ Đầu tư phát triển tỉnh Long An has posted 5 of the contractor selection plan, which contains 9 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Quỹ Đầu tư phát triển tỉnh Long An has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quỹ Đầu tư phát triển tỉnh Long An has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quỹ Đầu tư phát triển tỉnh Long An is the owner of 5 contractor selection plan. In which, they self-invite 5 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Quỹ Đầu tư phát triển tỉnh Long An is an investor with 11 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Quỹ Đầu tư phát triển tỉnh Long An is the investor of 4 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code