Data analysis results of DauThau.info software for bid solicitors Sở Công Thương Ninh Thuận as follows:
- Has relationships with 1 project owners.
- Has relationships with 16 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 9 contractor selection plans with a total of 12 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 20 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 15 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 5 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 20.00%, Construction 20.00%, Consultancy 60.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 12,113,566,636 VND, of which the total winning bid value is: 11,983,357,028 VND.
- The savings rate is: 1.07%.
Data analysis results of DauThau.info software for bid solicitors Sở Công Thương Ninh Thuận as follows:
- Has relationships with 16 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 20.00%, Construction 20.00%, Consulting 60.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 12,113,566,636 VND, in which the total winning value is: 11,983,357,028 VND.
- The savings rate is: 1.07%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Công Thương Ninh Thuận are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 9 contractor selection plans, of which 9 were self-published, and 0 were published by other entities.
- Is the investor of 5 Tender Notices, of which 5 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 02: Projecting the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: INSTITUTE OF ENERGY
14/07/2025 09:19
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 03: Making a pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province: (1) Dam Nai 3 Wind Plant, capacity of 39.84MW; (2) Dam Nai 4 wind power plant, 27.6MW; (3) Ho Bau Wind Power Plant, capacity of 25.2MW; (4) 7A wind power plant phase 2, capacity of 21MW. of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: INSTITUTE OF ENERGY
18/06/2025 16:57
Bid solicitor Sở Công Thương Ninh Thuận has posted Tender Notice Tender package No 02: Projecting the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" of the investor Sở Công Thương Ninh Thuận with the form Open bidding.
10/06/2025 15:09
The Bid solicitor Sở Công Thương Ninh Thuận has posted the request The contractor selection plan for the packages to set up the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" of the investor Sở Công Thương Ninh Thuận with 2 bidding package.
27/05/2025 09:55
Bid solicitor Sở Công Thương Ninh Thuận has posted Tender Notice Tender package No 03: Making a pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province: (1) Dam Nai 3 Wind Plant, capacity of 39.84MW; (2) Dam Nai 4 wind power plant, 27.6MW; (3) Ho Bau Wind Power Plant, capacity of 25.2MW; (4) 7A wind power plant phase 2, capacity of 21MW. of the investor Sở Công Thương Ninh Thuận with the form Open bidding.
21/05/2025 16:57
The Bid solicitor Sở Công Thương Ninh Thuận has posted the request The contractor selection plan for the pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province of the investor Sở Công Thương Ninh Thuận with 4 bidding package.
18/05/2025 11:24
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Shopping for a desktop computer of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN THƯƠNG MẠI NĂM NGỌC NINH THUẬN
31/12/2024 15:57
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 08: Announcement of construction zoning plan (1/2000 scale) LNG gas power area, petroleum depot and Cape Sung area, Phuoc Diem commune, Thuan Nam district, Ninh Thuan province of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: CÔNG TY TNHH GIA HUY CONSTRUCTION
26/11/2024 08:47
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 03 of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: CHANH QUAN CONSTRUCTION COMPANY LIMITED
14/10/2024 09:33
Bid solicitor Sở Công Thương Ninh Thuận has posted Tender Notice Tender package No 03 of the investor Sở Công Thương Ninh Thuận with the form Open bidding.
30/09/2024 09:40
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Công Thương Ninh Thuận announced the results of the bid package Package No. 02: Projecting the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" .
- Winning bidder: INSTITUTE OF ENERGY
14/07/2025 09:19
Sở Công Thương Ninh Thuận announced the results of the bidding package Tender package No 02: Projecting the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" with 1 participating contractors .
30/06/2025 09:02
Sở Công Thương Ninh Thuận announced the results of the bid package Package No. 03: Making a pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province: (1) Dam Nai 3 Wind Plant, capacity of 39.84MW; (2) Dam Nai 4 wind power plant, 27.6MW; (3) Ho Bau Wind Power Plant, capacity of 25.2MW; (4) 7A wind power plant phase 2, capacity of 21MW. .
- Winning bidder: INSTITUTE OF ENERGY
18/06/2025 16:57
Sở Công Thương Ninh Thuận publishes Tender Notice Tender package No 02: Projecting the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" in the form Open bidding .
10/06/2025 15:09
Sở Công Thương Ninh Thuận announced the results of the bidding package Tender package No 03: Making a pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province: (1) Dam Nai 3 Wind Plant, capacity of 39.84MW; (2) Dam Nai 4 wind power plant, 27.6MW; (3) Ho Bau Wind Power Plant, capacity of 25.2MW; (4) 7A wind power plant phase 2, capacity of 21MW. with 1 participating contractors .
10/06/2025 10:28
Sở Công Thương Ninh Thuận publishes the plan The contractor selection plan for the packages to set up the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" with 2 bidding package .
27/05/2025 09:55
Sở Công Thương Ninh Thuận publishes Tender Notice Tender package No 03: Making a pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province: (1) Dam Nai 3 Wind Plant, capacity of 39.84MW; (2) Dam Nai 4 wind power plant, 27.6MW; (3) Ho Bau Wind Power Plant, capacity of 25.2MW; (4) 7A wind power plant phase 2, capacity of 21MW. in the form Open bidding .
21/05/2025 16:57
Sở Công Thương Ninh Thuận publishes the plan The contractor selection plan for the pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province with 4 bidding package .
18/05/2025 11:24
Sở Công Thương Ninh Thuận announced the results of the bid package Shopping for a desktop computer .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN THƯƠNG MẠI NĂM NGỌC NINH THUẬN
31/12/2024 15:57
Sở Công Thương Ninh Thuận announced the results of the bid package Package No. 08: Announcement of construction zoning plan (1/2000 scale) LNG gas power area, petroleum depot and Cape Sung area, Phuoc Diem commune, Thuan Nam district, Ninh Thuan province .
- Winning bidder: CÔNG TY TNHH GIA HUY CONSTRUCTION
26/11/2024 08:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 02: Projecting the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: INSTITUTE OF ENERGY
14/07/2025 09:19
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 03: Making a pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province: (1) Dam Nai 3 Wind Plant, capacity of 39.84MW; (2) Dam Nai 4 wind power plant, 27.6MW; (3) Ho Bau Wind Power Plant, capacity of 25.2MW; (4) 7A wind power plant phase 2, capacity of 21MW. of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: INSTITUTE OF ENERGY
18/06/2025 16:57
Bid solicitor Sở Công Thương Ninh Thuận has posted Tender Notice Tender package No 02: Projecting the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" of the investor Sở Công Thương Ninh Thuận with the form Open bidding.
10/06/2025 15:09
The Bid solicitor Sở Công Thương Ninh Thuận has posted the request The contractor selection plan for the packages to set up the project "Establishing an inter -regional renewable industrial energy center in Ninh Thuan" of the investor Sở Công Thương Ninh Thuận with 2 bidding package.
27/05/2025 09:55
Bid solicitor Sở Công Thương Ninh Thuận has posted Tender Notice Tender package No 03: Making a pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province: (1) Dam Nai 3 Wind Plant, capacity of 39.84MW; (2) Dam Nai 4 wind power plant, 27.6MW; (3) Ho Bau Wind Power Plant, capacity of 25.2MW; (4) 7A wind power plant phase 2, capacity of 21MW. of the investor Sở Công Thương Ninh Thuận with the form Open bidding.
21/05/2025 16:57
The Bid solicitor Sở Công Thương Ninh Thuận has posted the request The contractor selection plan for the pre -feasibility study report (PREFS) for 04 wind power projects in Ninh Thuan province of the investor Sở Công Thương Ninh Thuận with 4 bidding package.
18/05/2025 11:24
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Shopping for a desktop computer of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN THƯƠNG MẠI NĂM NGỌC NINH THUẬN
31/12/2024 15:57
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 08: Announcement of construction zoning plan (1/2000 scale) LNG gas power area, petroleum depot and Cape Sung area, Phuoc Diem commune, Thuan Nam district, Ninh Thuan province of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: CÔNG TY TNHH GIA HUY CONSTRUCTION
26/11/2024 08:47
The Bid solicitor Sở Công Thương Ninh Thuận has posted the results of the bidding package Package No. 03 of the investor Sở Công Thương Ninh Thuận.
- Winning bidder: CHANH QUAN CONSTRUCTION COMPANY LIMITED
14/10/2024 09:33
Bid solicitor Sở Công Thương Ninh Thuận has posted Tender Notice Tender package No 03 of the investor Sở Công Thương Ninh Thuận with the form Open bidding.
30/09/2024 09:40
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Công Thương Ninh Thuận has posted 9 of the contractor selection plan, which contains 12 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Công Thương Ninh Thuận has posted 5 Tender Notices in 5 bidding packages. Among these, 5 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Công Thương Ninh Thuận has posted 20 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 20 package, canceled the bid 0 package (among the bidding packages above).
- There are 15 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Công Thương Ninh Thuận has a relationship with 16 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Công Thương Ninh Thuận has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Công Thương Ninh Thuận has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects