Data analysis results of DauThau.info software for bid solicitors Sở Công Thương tỉnh Sơn La as follows:
- Has relationships with 2 project owners.
- Has relationships with 34 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 35 contractor selection plans with a total of 112 bidding packages, of which 20 prequalification documents have not found the investment project.
- Has invited bids for 64 packages (with 76 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 80 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 28 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 36 packages that have not fully posted the contractor selection results. Of these 30 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.20 contractors.
- Breakdown by bidding field: Goods 5.26%, Construction 7.89%, Consultancy 27.63%, Non-consultancy 1.32%, Mixed 57.89%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 873,329,785,700 VND, of which the total winning bid value is: 836,499,908,858 VND.
- The savings rate is: 4.22%.
Data analysis results of DauThau.info software for bid solicitors Sở Công Thương tỉnh Sơn La as follows:
- Has relationships with 34 contractor.
- The average number of contractors participating in each bidding package is: 1.20 contractors.
- Proportion of bidding fields: Goods 5.26%, Construction 7.89%, Consulting 27.63%, Non-consulting 1.32%, Mixed 57.89%, Other 0%.
- The total value according to the bidding package with valid IMP is: 873,329,785,700 VND, in which the total winning value is: 836,499,908,858 VND.
- The savings rate is: 4.22%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Công Thương tỉnh Sơn La are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 32 contractor selection plans, of which 32 were self-published, and 0 were published by other entities.
- Is the investor of 74 Tender Notices, of which 72 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply, installation of equipment and construction and relocation of 110kV and 35kV lines with dual circuits in the section of Son La General Hospital - 110kV Chieng Sinh substation of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
12/09/2022 10:13
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Co ward, Chieng An ward, Chieng Coi ward, Chieng Xom commune, Chieng Ngan commune, Chieng Den commune, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
09/09/2022 09:05
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Co ward, Chieng An ward, Chieng Coi ward, Chieng Xom commune, Chieng Ngan commune, Chieng Den commune, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
09/09/2022 08:27
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Sinh ward, Hua La commune, Quyet Thang ward, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
08/09/2022 14:33
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the request Supplemental planning and construction Project to move 110kV and 35kV lines with dual circuit section of Son La General Hospital - 110kV Chieng Sinh substation of the investor Sở Công Thương tỉnh Sơn La with 4 bidding package.
07/09/2022 16:05
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the request Sub-project of rural electricity supply from national irrigation in Son La province (Implemented in 9 communes and wards of Son La city) of the investor Sở Công Thương tỉnh Sơn La with 4 bidding package.
07/09/2022 15:34
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Sinh ward, Hua La commune, Quyet Thang ward, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
25/08/2022 14:14
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Sinh ward, Hua La commune, Quyet Thang ward, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
25/08/2022 11:11
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the results of the bidding package Consultancy and verification of BVTC design and construction cost estimate Project to move 110kV and 35kV lines with dual circuit section of Son La General Hospital - 110kV Chieng Sinh substation of the investor Sở Công Thương tỉnh Sơn La.
- Winning bidder: Công ty trách nhiệm hữu hạn Tư vấn Đầu tư Điện 1
17/08/2022 17:23
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the request Sub-project of rural electricity supply from national irrigation in Son La province (Implemented in 9 communes and wards of Son La city) of the investor Sở Công Thương tỉnh Sơn La with 4 bidding package.
12/08/2022 09:49
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Công Thương tỉnh Sơn La announced the results of the bidding package Construction supervision consultancy, installation of equipment for power supply works Yen Chau town, communes: Chieng Pan, Chieng Sang, Vieng Lan, Chieng Khoi, Chieng Hac, Yen Son, Chieng Dong, Muong Lum, Tu Nang, Long Phieng, Chieng Tuong, Chieng On, Phieng Khoai, Yen Chau district with 2 participating contractors .
20/10/2022 15:17
Sở Công Thương tỉnh Sơn La announced the results of the bidding package Package 15: Construction supervision consultancy, installation of equipment for power supply works in Chieng An ward, Chieng Co commune, Chieng Coi ward, Chieng Xom commune, Chieng Ngan commune, Chieng Den commune, Son La city with 2 participating contractors .
19/10/2022 09:45
Sở Công Thương tỉnh Sơn La announced the results of the bidding package Package 14: Construction supervision consultancy, installation of equipment for power supply works in Chieng Sinh ward, Quyet Thang ward, Hua La commune, Son La city with 2 participating contractors .
19/10/2022 09:11
Sở Công Thương tỉnh Sơn La announced the results of the bidding package Package 07: Construction supervision consultancy and construction equipment installation with 1 participating contractors .
16/10/2022 16:06
Sở Công Thương tỉnh Sơn La publishes Tender Notice Construction supervision consultancy, installation of equipment for power supply works Yen Chau town, communes: Chieng Pan, Chieng Sang, Vieng Lan, Chieng Khoi, Chieng Hac, Yen Son, Chieng Dong, Muong Lum, Tu Nang, Long Phieng, Chieng Tuong, Chieng On, Phieng Khoai, Yen Chau district in the form Open bidding .
30/09/2022 09:46
Sở Công Thương tỉnh Sơn La publishes Tender Notice Supply, installation of equipment and construction and relocation of 110kV and 35kV lines with dual circuits in the section of Son La General Hospital - 110kV Chieng Sinh substation in the form National competitive bidding .
12/09/2022 10:13
Sở Công Thương tỉnh Sơn La publishes Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Co ward, Chieng An ward, Chieng Coi ward, Chieng Xom commune, Chieng Ngan commune, Chieng Den commune, Son La city in the form National competitive bidding .
09/09/2022 09:05
Sở Công Thương tỉnh Sơn La publishes Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Co ward, Chieng An ward, Chieng Coi ward, Chieng Xom commune, Chieng Ngan commune, Chieng Den commune, Son La city in the form National competitive bidding .
09/09/2022 08:27
Sở Công Thương tỉnh Sơn La publishes Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Sinh ward, Hua La commune, Quyet Thang ward, Son La city in the form National competitive bidding .
08/09/2022 14:33
Sở Công Thương tỉnh Sơn La publishes the plan Supplemental planning and construction Project to move 110kV and 35kV lines with dual circuit section of Son La General Hospital - 110kV Chieng Sinh substation with 4 bidding package .
07/09/2022 16:05
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply, installation of equipment and construction and relocation of 110kV and 35kV lines with dual circuits in the section of Son La General Hospital - 110kV Chieng Sinh substation of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
12/09/2022 10:13
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Co ward, Chieng An ward, Chieng Coi ward, Chieng Xom commune, Chieng Ngan commune, Chieng Den commune, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
09/09/2022 09:05
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Co ward, Chieng An ward, Chieng Coi ward, Chieng Xom commune, Chieng Ngan commune, Chieng Den commune, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
09/09/2022 08:27
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Sinh ward, Hua La commune, Quyet Thang ward, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
08/09/2022 14:33
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the request Supplemental planning and construction Project to move 110kV and 35kV lines with dual circuit section of Son La General Hospital - 110kV Chieng Sinh substation of the investor Sở Công Thương tỉnh Sơn La with 4 bidding package.
07/09/2022 16:05
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the request Sub-project of rural electricity supply from national irrigation in Son La province (Implemented in 9 communes and wards of Son La city) of the investor Sở Công Thương tỉnh Sơn La with 4 bidding package.
07/09/2022 15:34
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Sinh ward, Hua La commune, Quyet Thang ward, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
25/08/2022 14:14
Bid solicitor Sở Công Thương tỉnh Sơn La has posted Tender Notice Supply of materials, equipment and construction of power supply works in Chieng Sinh ward, Hua La commune, Quyet Thang ward, Son La city of the investor Sở Công Thương tỉnh Sơn La with the form National competitive bidding.
25/08/2022 11:11
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the results of the bidding package Consultancy and verification of BVTC design and construction cost estimate Project to move 110kV and 35kV lines with dual circuit section of Son La General Hospital - 110kV Chieng Sinh substation of the investor Sở Công Thương tỉnh Sơn La.
- Winning bidder: Công ty trách nhiệm hữu hạn Tư vấn Đầu tư Điện 1
17/08/2022 17:23
The Bid solicitor Sở Công Thương tỉnh Sơn La has posted the request Sub-project of rural electricity supply from national irrigation in Son La province (Implemented in 9 communes and wards of Son La city) of the investor Sở Công Thương tỉnh Sơn La with 4 bidding package.
12/08/2022 09:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Công Thương tỉnh Sơn La has posted 35 of the contractor selection plan, which contains 112 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Sở Công Thương tỉnh Sơn La has posted 76 Tender Notices in 64 bidding packages. Among these, 69 Tender Notices were self-invited, and 7 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Công Thương tỉnh Sơn La has posted 80 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 80 package, canceled the bid 0 package (among the bidding packages above).
- There are 28 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Công Thương tỉnh Sơn La has a relationship with 34 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Công Thương tỉnh Sơn La has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects