Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải Yên Bái as follows:
- Has relationships with 17 contractor.
- Announced 100 investment development project, of which 6 projects have not yet announced the prequalification documents.
- Announced 127 contractor selection plans with a total of 223 bidding packages, of which 27 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 24 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 56 packages that have not fully posted the contractor selection results. Of these 45 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,397,212,000 VND, of which the total winning bid value is: 3,322,763,000 VND.
- The savings rate is: 2.19%.
Data analysis results of DauThau.info software for bid solicitors Sở Giao thông vận tải Yên Bái as follows:
- Has relationships with 17 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,397,212,000 VND, in which the total winning value is: 3,322,763,000 VND.
- The savings rate is: 2.19%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 100 investment and development projects.
- As the owner of 169 Contractor selection plan in which 97 Contractor selection plan is self-published, and 72 Contractor selection plan is posted by other units.
- Being the investor of 190 bidding packages in which 0 packages are self-invited, and 190 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Plan for selecting contractors for the project Repairing damage to foundations, road surfaces and structures on National Highway 2D, section Km106+100 - Km118+765, Yen Bai province (additional) of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
23/10/2024 13:33
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Plan for selecting contractors for the project of repairing District 1 house at Km340+400/National Highway 37 and District 4 housing at Km236/National Highway 32 in Yen Bai province. of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
22/10/2024 09:47
Sở Giao thông vận tải Yên Bái Posted Development Investment Project Repairing county house 1 mile Km340+400/National Highway 37 and county house 4 miles Km236/National Highway 32 Yen Bai province.
22/10/2024 09:09
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Unscheduled repairs, ensuring traffic safety passing through school locations on National Highway 32, National Highway 37, Yen Bai province of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
15/10/2024 11:03
Sở Giao thông vận tải Yên Bái Posted Development Investment Project Unscheduled repairs, ensuring traffic safety passing through school locations on National Highway 32, National Highway 37, Yen Bai province.
15/10/2024 10:10
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Dealing with road surface landslides at Km242+600, Km243+300/QL.32, Yen Bai province of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
15/10/2024 08:44
Sở Giao thông vận tải Yên Bái Posted Development Investment Project Dealing with road surface landslides at Km242+600, Km243+300/QL.32, Yen Bai province.
15/10/2024 07:07
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Contractor selection plan for package No. 01: Survey consulting, preparation of feasibility study report for investment in construction of Au Co road surface upgrading project (section Km5+300 - Km10+500), Yen Bai city and Tran Yen district of the investor Sở Giao thông vận tải Yên Bái with 1 bidding package.
10/10/2024 11:06
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the results of the bidding package Consulting on surveys, preparing design documents for financial protection - Additional estimates of the investor Sở Giao thông vận tải Yên Bái.
- Winning bidder: Road Engineering Center
09/10/2024 20:41
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Repairing damage to foundations, road surfaces and structures on National Highway 2D, section Km106+100 - Km118+765, Yen Bai province of the investor Sở Giao thông vận tải Yên Bái with 1 bidding package.
07/10/2024 22:55
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Giao thông vận tải Yên Bái publishes the plan Plan for selecting contractors for the project Repairing damage to foundations, road surfaces and structures on National Highway 2D, section Km106+100 - Km118+765, Yen Bai province (additional) with 3 bidding package .
23/10/2024 13:33
Sở Giao thông vận tải Yên Bái publishes the plan Plan for selecting contractors for the project of repairing District 1 house at Km340+400/National Highway 37 and District 4 housing at Km236/National Highway 32 in Yen Bai province. with 3 bidding package .
22/10/2024 09:47
Sở Giao thông vận tải Yên Bái publishes the plan Unscheduled repairs, ensuring traffic safety passing through school locations on National Highway 32, National Highway 37, Yen Bai province with 3 bidding package .
15/10/2024 11:03
Sở Giao thông vận tải Yên Bái publishes the plan Dealing with road surface landslides at Km242+600, Km243+300/QL.32, Yen Bai province with 3 bidding package .
15/10/2024 08:44
Sở Giao thông vận tải Yên Bái publishes the plan Contractor selection plan for package No. 01: Survey consulting, preparation of feasibility study report for investment in construction of Au Co road surface upgrading project (section Km5+300 - Km10+500), Yen Bai city and Tran Yen district with 1 bidding package .
10/10/2024 11:06
Sở Giao thông vận tải Yên Bái announced the results of the bid package Consulting on surveys, preparing design documents for financial protection - Additional estimates .
- Winning bidder: Road Engineering Center
09/10/2024 20:41
Sở Giao thông vận tải Yên Bái publishes the plan Repairing damage to foundations, road surfaces and structures on National Highway 2D, section Km106+100 - Km118+765, Yen Bai province with 1 bidding package .
07/10/2024 22:55
Sở Giao thông vận tải Yên Bái publishes the plan Regular management and maintenance of bridges and roads are handed over to the Department of Transport to take over management and maintenance (from November 1, 2024 to March 31, 2026) with 1 bidding package .
03/10/2024 15:01
Sở Giao thông vận tải Yên Bái publishes the plan Contractor selection plan for the package Consulting on surveying and designing the design of financial protection - project area: Repair of curb reinforcement and drainage of section Km196+319.9 - Km196+801.8; Repair local damage to the foundation, road surface, drainage and complete the traffic safety system at section Km196+919.9 - Km198, National Highway 32, Yen Bai province with 1 bidding package .
02/10/2024 08:17
Sở Giao thông vận tải Yên Bái announced the results of the bid package Package No. 03: Construction supervision of repairing Van Phu bridge on Au Co street, Mau A bridge on Mau A road - Tan Nguyen (DT.165), Rao bridge and Gua bridge on Au Lau - Dong An road (DT. .166) .
- Winning bidder: Công ty Cổ phần tư vấn giám sát, kiểm định xây dựng
27/09/2024 04:32
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Plan for selecting contractors for the project Repairing damage to foundations, road surfaces and structures on National Highway 2D, section Km106+100 - Km118+765, Yen Bai province (additional) of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
23/10/2024 13:33
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Plan for selecting contractors for the project of repairing District 1 house at Km340+400/National Highway 37 and District 4 housing at Km236/National Highway 32 in Yen Bai province. of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
22/10/2024 09:47
Sở Giao thông vận tải Yên Bái Posted Development Investment Project Repairing county house 1 mile Km340+400/National Highway 37 and county house 4 miles Km236/National Highway 32 Yen Bai province.
22/10/2024 09:09
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Unscheduled repairs, ensuring traffic safety passing through school locations on National Highway 32, National Highway 37, Yen Bai province of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
15/10/2024 11:03
Sở Giao thông vận tải Yên Bái Posted Development Investment Project Unscheduled repairs, ensuring traffic safety passing through school locations on National Highway 32, National Highway 37, Yen Bai province.
15/10/2024 10:10
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Dealing with road surface landslides at Km242+600, Km243+300/QL.32, Yen Bai province of the investor Sở Giao thông vận tải Yên Bái with 3 bidding package.
15/10/2024 08:44
Sở Giao thông vận tải Yên Bái Posted Development Investment Project Dealing with road surface landslides at Km242+600, Km243+300/QL.32, Yen Bai province.
15/10/2024 07:07
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Contractor selection plan for package No. 01: Survey consulting, preparation of feasibility study report for investment in construction of Au Co road surface upgrading project (section Km5+300 - Km10+500), Yen Bai city and Tran Yen district of the investor Sở Giao thông vận tải Yên Bái with 1 bidding package.
10/10/2024 11:06
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the results of the bidding package Consulting on surveys, preparing design documents for financial protection - Additional estimates of the investor Sở Giao thông vận tải Yên Bái.
- Winning bidder: Road Engineering Center
09/10/2024 20:41
The Bid solicitor Sở Giao thông vận tải Yên Bái has posted the request Repairing damage to foundations, road surfaces and structures on National Highway 2D, section Km106+100 - Km118+765, Yen Bai province of the investor Sở Giao thông vận tải Yên Bái with 1 bidding package.
07/10/2024 22:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Giao thông vận tải Yên Bái has posted 127 of the contractor selection plan, which contains 223 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Giao thông vận tải Yên Bái has posted 24 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 24 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Giao thông vận tải Yên Bái has a relationship with 17 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
The data declared by the procuring entity is incorrect (missing agency code and having the same name as many other parties)
Summary: Investor Sở Giao thông vận tải Yên Bái has a relationship with 4 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông vận tải Yên Bái is the owner of 169 contractor selection plan. In which, they self-invite 97 of contractor selection plan, other units invite bids of 72 of contractor selection plan.
Summary: Investor Sở Giao thông vận tải Yên Bái is an investor with 111 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Sở Giao thông vận tải Yên Bái is the investor of 100 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code