Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Sở Nội vụ tỉnh Đồng Nai as follows:
- Has relationships with 1 project owners.
- Has relationships with 33 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 10 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 387,597,000 VND, of which the total winning bid value is: 387,596,702 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Sở Nội vụ tỉnh Đồng Nai as follows:
- Has relationships with 33 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 387,597,000 VND, in which the total winning value is: 387,596,702 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Sở Nội vụ tỉnh Đồng Nai are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 16 contractor selection plans, of which 8 were self-published, and 8 were published by other entities.
- Is the investor of 5 Tender Notices, of which 0 were self-invited, and 5 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Package No. 1: Printing cards for civil servants and public employees .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN SONG PHƯƠNG
27/11/2025 14:50
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Bidding package for hiring software to evaluate administrative and public service reform criteria for Dong Nai province in 2025 .
- Winning bidder: TRUNG TÂM GIÁM SÁT, ĐIỀU HÀNH ĐÔ THỊ THÔNG MINH TỈNH HẬU GIANG
20/11/2025 09:55
Sở Nội vụ tỉnh Đồng Nai publishes the plan Approving the bidding package for hiring software to evaluate criteria for administrative and civil service reform for Dong Nai province in 2025 with 1 bidding package .
18/11/2025 08:06
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Bidding package for hiring survey software for the task "Surveying the satisfaction of people and organizations with the service of state administrative agencies in Dong Nai province in 2025" .
- Winning bidder: HINOVA TECHNOLOGY JOINT STOCK COMPANY
18/11/2025 07:58
Sở Nội vụ tỉnh Đồng Nai publishes the plan Approving the contractor selection plan for the package of hiring survey software for the task "Surveying the satisfaction of people and organizations with the service of state administrative agencies in Dong Nai province in 2025" with 1 bidding package .
11/11/2025 10:05
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Prepare Technical Design - Estimate: "Carry out measurements and verify the boundaries of administrative units in the field; prepare documents on the boundaries of administrative units at all levels after arranging provincial and commune-level administrative units in Dong Nai province" .
- Winning bidder: TRUNG TÂM TƯ VẤN VÀ THẨM ĐỊNH TRẮC ĐỊA BẢN ĐỒ
07/11/2025 16:12
Sở Nội vụ tỉnh Đồng Nai publishes the plan Investment preparation stage for the bidding package of preparing Technical Design - Project estimate: "Carry out measurements and verify the boundaries of administrative units in the field; prepare documents on the boundaries of administrative units at all levels after arranging provincial and commune-level administrative units in Dong Nai province" with 1 bidding package .
07/11/2025 16:03
Sở Nội vụ tỉnh Đồng Nai publishes Tender Notice Tender package No 1: Printing cards for civil servants and public employees in the form Competitive Offer .
05/11/2025 15:56
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Job introduction expenses for employees .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ PTN
03/11/2025 14:56
Sở Nội vụ tỉnh Đồng Nai publishes the plan Printing and issuing cards for civil servants and public employees with 2 bidding package .
29/10/2025 14:47
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Nội vụ tỉnh Đồng Nai publishes the plan Plan to select contractor to hire information technology services information system information management system management system, civil servants and officials of Dong Nai province with 5 bidding package .
20/06/2025 11:10
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Regarding the approval of estimates and the contractor selection plan for the "relocation of office equipment to serve the professional work of the Department of Home Affairs after consolidating according to Resolution No. 11/NQ-HDND in 2025" .
- Winning bidder: C
26/04/2025 16:48
Sở Nội vụ tỉnh Đồng Nai publishes the plan Regarding the approval of estimates and the contractor selection plan for the "relocation of office equipment to serve the professional work of the Department of Home Affairs after consolidating according to Resolution No. 11/NQ-HDND in 2025" with 1 bidding package .
18/04/2025 16:40
Sở Nội vụ tỉnh Đồng Nai publishes the plan Regarding the approval of estimates and planning plan for bidding package: "Buy air tickets for the delegation to learn experience on administrative reform in the provinces: Bac Giang, Thai Nguyen in 2025" with 1 bidding package .
19/03/2025 09:03
Sở Nội vụ tỉnh Đồng Nai publishes the plan Consulting on technical design - new estimates of funding, adjusting and supplementing with administrative boundaries at all levels according to the resolutions of the Standing Committee of the National Assembly in Dong Nai province with 1 bidding package .
05/03/2025 16:48
Sở Nội vụ tỉnh Đồng Nai publishes the plan Consulting on technical design - new estimates of funding, adjusting and supplementing with administrative boundaries at all levels according to the resolutions of the Standing Committee of the National Assembly in Dong Nai province with 1 bidding package .
05/03/2025 16:47
Sở Nội vụ tỉnh Đồng Nai publishes the plan Consulting on technical design - new estimates of funding, adjusting and supplementing with administrative boundaries at all levels according to the resolutions of the Standing Committee of the National Assembly in Dong Nai province with 1 bidding package .
05/03/2025 16:42
Sở Nội vụ tỉnh Đồng Nai publishes the plan Rent software to survey the satisfaction of people and organizations with the services of state administrative agencies in Dong Nai province in 2024 with 1 bidding package .
09/07/2024 10:14
Sở Nội vụ tỉnh Đồng Nai publishes the plan Contractor selection plan for the preparation phase of hiring information technology services Information system for managing cadres, civil servants and public employees of Dong Nai province with 1 bidding package .
09/07/2024 08:43
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Bidding package for renting locations, classrooms, equipment and other items to serve the civil servant rank promotion exam and professional title promotion for civil servants in Dong Nai province. .
- Winning bidder: Trường Đại học Đồng Nai.
01/03/2024 14:44
The data sheet has been partially hidden, to see the full information please Login or Register
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Package No. 1: Printing cards for civil servants and public employees .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN SONG PHƯƠNG
27/11/2025 14:50
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Bidding package for hiring software to evaluate administrative and public service reform criteria for Dong Nai province in 2025 .
- Winning bidder: TRUNG TÂM GIÁM SÁT, ĐIỀU HÀNH ĐÔ THỊ THÔNG MINH TỈNH HẬU GIANG
20/11/2025 09:55
Sở Nội vụ tỉnh Đồng Nai publishes the plan Approving the bidding package for hiring software to evaluate criteria for administrative and civil service reform for Dong Nai province in 2025 with 1 bidding package .
18/11/2025 08:06
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Bidding package for hiring survey software for the task "Surveying the satisfaction of people and organizations with the service of state administrative agencies in Dong Nai province in 2025" .
- Winning bidder: HINOVA TECHNOLOGY JOINT STOCK COMPANY
18/11/2025 07:58
Sở Nội vụ tỉnh Đồng Nai publishes the plan Approving the contractor selection plan for the package of hiring survey software for the task "Surveying the satisfaction of people and organizations with the service of state administrative agencies in Dong Nai province in 2025" with 1 bidding package .
11/11/2025 10:05
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Prepare Technical Design - Estimate: "Carry out measurements and verify the boundaries of administrative units in the field; prepare documents on the boundaries of administrative units at all levels after arranging provincial and commune-level administrative units in Dong Nai province" .
- Winning bidder: TRUNG TÂM TƯ VẤN VÀ THẨM ĐỊNH TRẮC ĐỊA BẢN ĐỒ
07/11/2025 16:12
Sở Nội vụ tỉnh Đồng Nai publishes the plan Investment preparation stage for the bidding package of preparing Technical Design - Project estimate: "Carry out measurements and verify the boundaries of administrative units in the field; prepare documents on the boundaries of administrative units at all levels after arranging provincial and commune-level administrative units in Dong Nai province" with 1 bidding package .
07/11/2025 16:03
Sở Nội vụ tỉnh Đồng Nai publishes Tender Notice Tender package No 1: Printing cards for civil servants and public employees in the form Competitive Offer .
05/11/2025 15:56
Sở Nội vụ tỉnh Đồng Nai announced the results of the bid package Job introduction expenses for employees .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ PTN
03/11/2025 14:56
Sở Nội vụ tỉnh Đồng Nai publishes the plan Printing and issuing cards for civil servants and public employees with 2 bidding package .
29/10/2025 14:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Sở Nội vụ tỉnh Đồng Nai has posted 8 of the contractor selection plan, which contains 10 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Nội vụ tỉnh Đồng Nai has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Sở Nội vụ tỉnh Đồng Nai has a relationship with 33 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Sở Nội vụ tỉnh Đồng Nai has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Sở Nội vụ tỉnh Đồng Nai has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects